Venkateshwara Landmark
By Venkateshwara Builders and Developers
RG-MH-27415 · RERA P53000033376 · Last updated on MahaRERA portal: 15 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 39 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Venkateshwara Landmark is a Others project by Venkateshwara Builders and Developers in Kolhapur, Maharashtra, registered with MahaRERA as P53000033376 on 16 Feb 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 39 months from the original filing. 21 of the 34 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameVenkateshwara Landmark
- TypeOthers
- Location
- A ward Venkateshwara Colony
- Apte Nagar
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416001
- Pincode416001
- RERA no.P53000033376
- ReraGenie IDRG-MH-27415
Builder
- NameVenkateshwara Builders and Developers
- Entity typePartnership
- PartnersKuldeep Kashinath Jadhav, Kashinath Bajarang Jadhav, Vijaykumar Shivajirao Patil, Shardul Vijaykumar Patil
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Feb 2022
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2023)
- Buildings1 building record
- Documents filed89 files
Current status
Figures as on 15 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Venkateshwara Landmark | NA | 7 | 7 | 20 | 14 | 34 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Venkateshwara Landmark: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sou Anjali Sadashiv Patil | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Venkateshwara Landmark | NA | Rs 4.28 cr | Rs 4.28 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A Square Architects Interior & Landscape Designers |
| Engineer | Kuldeep Jadhav Jadhav |
| Chartered Accountant | A S Dixit & Co |
| Partner | Role in project |
|---|---|
| Venkateshwara Builders and Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe obtained revised Sanctioned plan From Kolhapur Municipal Corporation Hence we apply for the Extension.
Reason as filed by the promoterwe have got completion certificate in oct 2024. but we cant uploaded in RERA Portal hence completion scrutiny has raised query regarding Built up area mismatched. for that we required to apply for correction hence needed extension till September 2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Dec 2025.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 2025.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 2025.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 March 2024.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 June 2024.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 March 2024.pdf | 20 Feb 2026 |
| Form 2A (FY 2022-2023)File: Form 2A 2022.pdf | 20 Feb 2026 |
| Form 5 (FY 2021-2022)File: Form 5 22.pdf | 20 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 24.pdf | 20 Feb 2026 |
| Form 1File: Form 1 Dec 2023.pdf | 24 Jan 2026 |
| Form 2File: Form 2 Dec 2023.pdf | 24 Jan 2026 |
| Form 3File: Form 3 Dec 2023.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 2023.pdf | 24 Jan 2026 |
| Form 1File: Form 1 March 2024.pdf | 24 Jan 2026 |
| Form 2File: Form 2 March 2024.pdf | 24 Jan 2026 |
| Form 3File: Form 3 March 2024.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold March 2024.pdf | 24 Jan 2026 |
| Form 1File: Form 1 June 2024.pdf | 24 Jan 2026 |
| Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Form 3File: Form 3 june 2024.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024.pdf | 24 Jan 2026 |
| Form 1File: Form 1 sep 2023.pdf | 24 Jan 2026 |
| Form 2File: Form 2 Sep 2023.pdf | 24 Jan 2026 |
| Form 3File: Form 3 Sep 2023.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold sep 2023.pdf | 24 Jan 2026 |
| Form 1File: Form 1 June 2023.pdf | 24 Jan 2026 |
| Form 2File: Form 2 June 2023.pdf | 24 Jan 2026 |
| Form 3File: Form 3 June 2023.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2023.pdf | 24 Jan 2026 |
| Form 1File: Form 1 June 2024.pdf | 24 Jan 2026 |
| Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Form 3File: Form 3 june 2024.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024.pdf | 24 Jan 2026 |
| Form 1File: Form 1 June 2024.pdf | 24 Jan 2026 |
| Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Form 3File: Form 3 june 2024.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024.pdf | 24 Jan 2026 |
| Form 1File: Form 1 June 2024.pdf | 24 Jan 2026 |
| Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Form 3File: Form 3 june 2024.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 June 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 March 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 March 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 June 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 March 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 March 2024.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 March 2024.pdf | 24 Jan 2026 |
| Form 2A (FY 2021-2022)File: Form 2A 2022.pdf | 24 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24.pdf | 24 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 24.pdf | 24 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 23.pdf | 24 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 2A 24.pdf | 24 Jan 2026 |
| Declaration in FORM BFile: Form B.pdf | 27 Jan 2024 |
| Building plan approvalFile: Plan 1.pdf | 20 Jan 2024 |
| Building plan approvalFile: Plan 2.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 20 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 20 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate Revised.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 15 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 15 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventary.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 15 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 15 Jan 2024 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE MODEL kasabekar.pdf | 5 Feb 2022 |
| Layout approvalFile: layout plan_11zon.pdf | 4 Feb 2022 |
| Building plan approvalFile: 01.pdf | 4 Feb 2022 |
| Building plan approvalFile: 02.pdf | 4 Feb 2022 |
| PAN CardFile: Venkateshwara pan.pdf | 4 Feb 2022 |
| Copy of the legal title reportFile: search report.pdf | 4 Feb 2022 |
| Copy of the legal title reportFile: Title Report 1.pdf | 4 Feb 2022 |
| Details of encumbrancesFile: Encumbrances Details.pdf | 4 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: layout plan_11zon.pdf | 4 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 01.pdf | 4 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Venkateshwara Landmark on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Apte Nagar880+ in Kolhapur
ELIXA PARK
AJAYSINH V DESAI BUILDERS & DEVELOPERS
SHRI MAHALAXMI RESIDENCY
SUPRIYA SACHIN MANGALE
ROYAL PLANET
SURAJ ESTATE DEVELOPERS
BEEZHIVE
BEDEKAR LIFESPACES LLP
ROYAL 09 TOURIST BUSINESS HUB
SURAJ ESTATE DEVELOPERS
TIME SQUARE
GREY BRICKS REALITY
See every Kolhapur project, with the district possession charts
Builder: Venkateshwara Builders and Developers
Venkateshwara Builders and Developers has 1 registration on MahaRERA, including Venkateshwara Landmark. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if Venkateshwara Landmark is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Venkateshwara Landmark?
The registered promoter entity is Venkateshwara Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Venkateshwara Landmark?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Venkateshwara Landmark?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Venkateshwara Landmark?
The professionals named in the filing: Architect: A Square Architects Interior & Landscape Designers; Engineer: Kuldeep Jadhav Jadhav; Chartered Accountant: A S Dixit & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Venkateshwara Landmark?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback