Home / Browse projects / Venkatesh Skydale Phase 2
Venkatesh Skydale Phase 2
RG-MH-15985 · RERA P52100024644 · Last updated on MahaRERA portal: 2 May 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Venkatesh Skydale Phase 2 is a Residential / Group Housing project by Shree Venkatesh Buildcon in Hingne Khurd, 411051, registered with MahaRERA as P52100024644 on 26 Feb 2020. The registration is recorded completed; possession was promised by 30 Dec 2025.
At a glance
Project
- NameVenkatesh Skydale Phase 2
- TypeResidential / Group Housing
- Location
- Survey No 20/1
- Plot H
- Hingne Khurd
- 411051
- Pincode411051
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100024644
- ReraGenie IDRG-MH-15985
Builder
- NameShree Venkatesh Buildcon
- Entity typePartnership
- GSTIN27ABGFS4527F1Z4
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersLAHURAJ BHIMRAO ASABE, VITTHAL BAJIRAO GOSAVI, ANKUSH BHIMRAO ASABE
- Other registrations3 more →
- Completed3 of 4
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Feb 2020
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed303 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B Building | NA | 28 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
B Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities24
As on 2 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Swimming Pool and Kids Pool | Yes | 100% |
| Society Office | Yes | 100% |
| SENIOR CITIZEN SIT OUT | Yes | 100% |
| OWC Plant | Yes | 100% |
| Multipurpose Playcourt | Yes | 100% |
| LAUNDRY | Yes | 100% |
| JOGGING TRACK WALKWAY | Yes | 100% |
| Drivers Room | Yes | 100% |
| Crech | Yes | 100% |
Parking filed123
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Anand Bajirao Gosavi and Others | Pune (M Corp.) | Pune |
| Tulsidas Bajirao Gosavi and Others | Pune (M Corp.) | Pune |
| Ganesh Rambhau Gosavi and Others | Pune (M Corp.) | Pune |
| Tushar Sambhaji Gosavi and Others | Pune (M Corp.) | Pune |
| Sagar Digambar Gosavi and Others | Pune (M Corp.) | Pune |
| Ulka D Gosavi | Pune (M Corp.) | Pune |
| Madhukar Tukaram Gosavi and Others | Pune (M Corp.) | Pune |
| Vitthal Bajirao Gosavi and Others | Pune (M Corp.) | Pune |
| Ketan Sambhaji Gosavi | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Dhruvang Hingmire |
| Architect | SHUBHANGI S HINGMIRE |
| Engineer | Milind Kadam |
| Chartered Accountant | Avinash J Utgikar |
| Partner | Role in project |
|---|---|
| Shree Venkatesh Buildcon | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 382/2021 | CIVIL | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Apr 2024
Documents filed303
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 303 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SKYDALE PH-2.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PH-2 WING B.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PH-2.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY SKYDALE PH-2.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VENKATESH SKYDALE PH-2.pdf | 17 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE -SKYDALE- WING A-B-C COMMERCIAL AND WING B AND C RESIDENTIAL 19-3-2 | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-2-MAR-24.pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PH-2-WING B-8-3-24.pdf | 23 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PH-2-WING B-8-3-24.pdf | 23 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VENKATESH SKYDALE PH-2.pdf | 23 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACH CERTIFICATE SKYDALE PH-2.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PH-2.pdf | 11 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-2-DEC-23.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY SKYDALE WING B PH-2.pdf | 11 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PH-2.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PH-2.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-2.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-2.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PH-2.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SKYDALE MAR-23- PHASE -2.pdf | 27 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 12 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 12 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -2.pdf | 12 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 20 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-2.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -2.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2-25-4-2023.pdf | 6 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2-25-4-2023.pdf | 6 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2.pdf | 6 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PH-2.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SKYDALE PH-2.pdf | 17 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTROY SKYDALE PH-2.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2.pdf | 17 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CONCERN TO LEGAL AND FINANCE SKYDALE PH-2.pdf | 20 Mar 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE CONCERN TO LEGAL AND FINANCE SKYDALE PH-2.pdf | 20 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Disclosure of Interest in Other Real Estate Organizations-SKYDALE PH-2.pdf | 20 Mar 2023 |
| Proforma of Agreement for saleFile: Proforma - Agreement For Sale- Wing B Phase II.pdf | 20 Mar 2023 |
| Proforma of Allotment letterFile: Proforma - Allotment Letter Phase - SKYDALE PHASE -II.pdf | 20 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Final Allotment with deviation letter.pdf | 20 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT FOR SALE SKYDALE PH-2.pdf | 20 Mar 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-PH-2.pdf | 24 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 24 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PH-2.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SKYDALE PH-2.pdf | 24 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-2.pdf | 24 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2 WING B.pdf | 24 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Seprate Bank Account.pdf | 24 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-2.pdf | 10 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PH-2.pdf | 15 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PH-2.pdf | 15 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SKYDALE PH-2-SEPT-2022.pdf | 15 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-2.pdf | 15 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2.pdf | 15 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 VENKATESH SKYDALE PHASE -2.pdf | 15 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -2.pdf | 15 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: DISLCOSER OF SOLD INVENTORY SKYDALE PH-2.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2.pdf | 14 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 11 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE-2.pdf | 11 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - SKYDALE PHASE -2-JUN-22.pdf | 11 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTROY SKYDALE PHASE -2.pdf | 11 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 30 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 30 May 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE-2.pdf | 30 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE VENKATESH SKYDALE PHASE -2.pdf | 30 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 9 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 9 May 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-2-4-5-2022.pdf | 9 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE WING B PHASE -2.pdf | 9 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 14 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 14 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - SKYDALE PHASE -2-MAR-22.pdf | 14 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-2.pdf | 14 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYDALE PHASE -2.pdf | 14 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKYDALE PHASE -2.pdf | 23 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SKYDALE PHASE -2.pdf | 23 Mar 2022 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VENKATESH GRAFFITI PHASE 1 | SR NO 31 PLUS 35 PART KESHAV NAGAR MUNDHWA PUNE 411036 | 358 | Completed | Jul 2017 | Apr 2017 |
| VENKATESH LAKE VISTA | SR NO 8 PLUS 9 PART DATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046 | 672 | Completed | Dec 2015 | Dec 2015 |
| VENKATESH SHARVIL | SR NO 26 PART DHAYARI PUNE 411041 | 186 | Completed | Mar 2014 | Jul 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 303 filed documents as one ZIP, foldered, with a manifest
Keep Venkatesh Skydale Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hingne Khurd
Aura Waters Phase II
Ranawat Properties
OM PARADISE
OM GHULE LEGACIES LLP
Aura Waters Phase -I
Ranawat Properties
RAMANA PRIMAVISTA
RAJENDRA VINAYAK PATAHRE
VENKATESH SKYDALE PHASE 4
Shree Venkatesh Buildcon
Kanchan Heights
Orbiz Estate
Builder: Shree Venkatesh Buildcon
Shree Venkatesh Buildcon has 4 registrations on MahaRERA, including VENKATESH SKYDALE PHASE 1 and Venkatesh Skydale Phase 2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if Venkatesh Skydale Phase 2 is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Venkatesh Skydale Phase 2?
The registered promoter entity is Shree Venkatesh Buildcon, a partnership as per the filing. Its GSTIN 27ABGFS4527F1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Venkatesh Skydale Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Venkatesh Skydale Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Venkatesh Skydale Phase 2?
The professionals named in the filing: Architect: Ar Dhruvang Hingmire; Architect: SHUBHANGI S HINGMIRE; Engineer: Milind Kadam; Chartered Accountant: Avinash J Utgikar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Venkatesh Skydale Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback