ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Aura Waters Phase II

Registered Litigation declared Residential / Group Housing project

Aura Waters Phase II

By Ranawat Properties

RG-MH-32067 · RERA PR1261012500685 · Last updated on MahaRERA portal: 29 Oct 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA
  • Rs 40.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months by MahaRERA order
2 of 18Construction stages doneacross 2 buildings; furthest along: Basement (if any), 40%
204 of 205Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Aura Waters Phase II is a Residential / Group Housing project by Ranawat Properties in Pune, Maharashtra, registered with MahaRERA as PR1261012500685 on 1 Sep 2025. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 1 of the 205 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAura Waters Phase II
  • TypeResidential / Group Housing
  • Location
    • Survey No. 10/1
    • 13/1A/2 & 13/1A/1(PT)
    • Vadgaon Bk
    • Wadgaon Bk
    • Haveli
    • Pune
    • 411051
  • Pincode411051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1261012500685
  • ReraGenie IDRG-MH-32067

Builder

  • NameRanawat Properties
  • Entity typePartnership
  • GSTIN27AAYFR6879A1ZG
  • PartnersMaitrik Shrenik Parmar, Prince Prakash Kankariya, Pravin Kantilal Jain, Sandeep Shantilal Kuwad, Vishal Vilas Jain, Sushil Vilas Jain, Sonal Rohit Oswal, Dinesh Kantilal Jain
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2025First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2025
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
  • Buildings2 building records
  • Documents filed71 files

Current status

0%1 of 205 units booked
17.9%Work done, per cost certificate

Figures as on 29 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA26201370137
Wing DNA171168068

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 40%.

Wing C16%
ActivityProgress
Excavation100%
Basement (if any)40%
Podiums (if any)0%
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D16%
ActivityProgress
Excavation100%
Basement (if any)40%
Podiums (if any)0%
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo10%
Sewerage (Chamber, Lines, Septic Tank , STP)No10%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed470

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots470
Closed/Covered470
BuildingClosed/CoveredTotal
Wing C268268
Wing D202202

Land and ownership31

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,034 sq m
Land owned byNot the promoter
Named landowners31
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on21 Apr 2026
LandownerVillageDistrict
NITIN TUKARAM SHELKEPune (M Corp.)Pune
NANDINI NITIN SHELKEPune (M Corp.)Pune
TUKARAM NIVRUTTI SHELKEPune (M Corp.)Pune
SHAKUNTALA TUKARAM SHELKEPune (M Corp.)Pune
VIJAY TUKARAM SHELKEPune (M Corp.)Pune
VISHAL VIVEK YERMEPune (M Corp.)Pune
MADHUKAR SOPANRAO PALMATEPune (M Corp.)Pune
RAJNI GOPAL MEKHALEPune (M Corp.)Pune
RAVITA SHRIKRISHNA MUSKAWADPune (M Corp.)Pune
SHUBHAM SANDIPAN GOMAREPune (M Corp.)Pune
MAHESH BALAJI BARUREPune (M Corp.)Pune
AKSHAY VIPINCHANDRA UGILEPune (M Corp.)Pune
BIPIN SUBODH BETPune (M Corp.)Pune
SWETHA YELLAGUNDULA-Pune
YOGITA MADHAVRAO WADKAR-Pune
BHIMSING NAGNATHSING THAKURPune (M Corp.)Pune
SUNIL SHALIKRAO SHINDE HUFPune (M Corp.)Pune
HARISHCHANDRA MADHAVRAO YERMEPune (M Corp.)Pune
RANJIT SUNIL CHAMLEPune (M Corp.)Pune
SUNIL GANPATRAO CHAMLEPune (M Corp.)Pune
VIKAS SANGRAM CHAMEPune (M Corp.)Pune
GOVIND DNYANOBA KHANDADEPune (M Corp.)Pune
VIPUL DEDHIAPune (M Corp.)Pune
ANUP DNYANOBA SHELKEPune (M Corp.)Pune
SANKET KHEMCHAND OSWALPune (M Corp.)Pune
PAWAN HYAMSUNDERJI MANTRIPune (M Corp.)Pune
NITIN BHAWARLAL MUTHAPune (M Corp.)Pune
BHUSHAN RATANLAL JAINPune (M Corp.)Pune
ARVIND GHEVARCHAND JAINPune (M Corp.)Pune
PRAKASH VASANT PATHAKPune (M Corp.)Pune
SHREEPAD BHALCHANDRA LIMAYEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI23742.57
Proposed, not sanctioned23,743 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3,4,5 and 10,ADITI APARTMENTS,344/1 NARAYAN PETHNEAR MODI GANAPATI, PUNE MAHARASHTRA 411030
Estimated costRs 74.15 cr
Cost incurredRs 13.28 cr
Work done17.91%
BuildingWingEstimatedIncurred
Wing CNARs 60.67 crRs 13.28 cr
Wing DNARs 6.74 cr-
-NARs 6.74 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPinnac Consulting Pvt. Ltd.
EngineerPradip Ashok Kadale
EngineerGanesh Balasaheb Sonawane
EngineerSunil Mutalik and Associates
Chartered AccountantMilan Shah
Chartered AccountantGolesha and company
PartnerRole in project
Ranawat Properties-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2029 → Apr 2030

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Litigation declared1

CaseCourtStatus
515/2023/202315th Joint CJSD & AddI CJM PuneOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600615Ram GawaliRanawat Properties07/09/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate Form 1- Aura Waters Phase 2 05-10-2026 correct.pdf29 Oct 2026
Withdrawal Update Form 2File: Form 2 Engineering Certificate Aura Waters Phase 2 19-10-2026.pdf29 Oct 2026
Withdrawal Update Form 3File: RP - PHASE - II Form 3.pdf29 Oct 2026
Form 2A (FY 2025-2026)File: Form-2A-Aura Waters Phase 2 FY 25-26.pdf28 Oct 2026
Form 5 (FY 2025-2026)File: RANAWAT PROPERTIES FORM 5 PHASE-II.pdf24 Sep 2026
Withdrawal Update Form 1File: Aura Waters Phase 2 Form1.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate Aura Waters Phase 2-13-07-26.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1-Aura Water Phase 2.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1-Aura Water Phase 2.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2-Engg certificate- Aura Waters Phase 2.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2-Engg certificate- Aura Waters Phase 2.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Phase 2 M a26.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Phase 2 M a26.pdf19 Jun 2026
Withdrawal Update Form 1File: Architect Certificate-Form 1- Aura Water-Phase 2.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf3 Feb 2026
Withdrawal Update Form 1File: Architect Certificate Form 1 Aura Water Phase 2.pdf3 Feb 2026
Withdrawal Update Form 2File: Aura Watres-II -Form2-Engg_certificate.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Aura Waters II Engineers Certificate.pdf3 Feb 2026
Withdrawal Update Form 2File: Aura Watres II Form 2 Dec 25.pdf3 Feb 2026
Withdrawal Update Form 3File: Aura Waters Phase 2 Form 5 Dec 25.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Phase II SEP 2025 signed.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Phase II SEP 2025 signed.pdf3 Feb 2026
Layout approvalFile: 1-28 Highlighted.pdf24 Sep 2025
Building plan approvalFile: 2-28.pdf24 Sep 2025
Building plan approvalFile: 3-28 parking.pdf24 Sep 2025
Building plan approvalFile: 4-28 Parking.pdf24 Sep 2025
Building plan approvalFile: 5-28 Parking.pdf24 Sep 2025
Building plan approvalFile: 6-28 Parking.pdf24 Sep 2025
Building plan approvalFile: 7-28 3rd Floor.pdf24 Sep 2025
Building plan approvalFile: 15-28 WIng C 4th Floor.pdf24 Sep 2025
Building plan approvalFile: 16-28 WIng C.pdf24 Sep 2025
Building plan approvalFile: 17-28 Wing C.pdf24 Sep 2025
Building plan approvalFile: 18-28 WIng C.pdf24 Sep 2025
Building plan approvalFile: 19-28 C Wing.pdf24 Sep 2025
Building plan approvalFile: 21-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 22-28 WIng D.pdf24 Sep 2025
Building plan approvalFile: 23-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 24-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 25-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 26-28 WIng D.pdf24 Sep 2025
Building plan approvalFile: 27-28 WIng D.pdf24 Sep 2025
Building plan approvalFile: 28-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 3-28 parking highlighted.pdf24 Sep 2025
Building plan approvalFile: 20-28 WIng C.pdf24 Sep 2025
Layout approvalFile: 1-28 Highlighted.pdf24 Sep 2025
Building plan approvalFile: 2-28.pdf24 Sep 2025
Building plan approvalFile: 3-28 parking.pdf24 Sep 2025
Building plan approvalFile: 4-28 Parking.pdf24 Sep 2025
Building plan approvalFile: 5-28 Parking.pdf24 Sep 2025
Building plan approvalFile: 6-28 Parking.pdf24 Sep 2025
Building plan approvalFile: 7-28 3rd Floor.pdf24 Sep 2025
Building plan approvalFile: 15-28 WIng C 4th Floor.pdf24 Sep 2025
Building plan approvalFile: 16-28 WIng C.pdf24 Sep 2025
Building plan approvalFile: 17-28 Wing C.pdf24 Sep 2025
Building plan approvalFile: 18-28 WIng C.pdf24 Sep 2025
Building plan approvalFile: 19-28 C Wing.pdf24 Sep 2025
Building plan approvalFile: 20-28 WIng C.pdf24 Sep 2025
Building plan approvalFile: 21-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 22-28 WIng D.pdf24 Sep 2025
Building plan approvalFile: 23-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 24-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 25-28 Wing D.pdf24 Sep 2025
Building plan approvalFile: 26-28 WIng D.pdf24 Sep 2025
Building plan approvalFile: 27-28 WIng D.pdf24 Sep 2025
Building plan approvalFile: 28-28 Wing D.pdf24 Sep 2025
Layout approvalFile: 2 Copy of Layout Approval Highlighted.pdf4 Jul 2025
Building plan approvalFile: Page 2-3 Ok.pdf4 Jul 2025
Building plan approvalFile: Page 4-6-2 OK.pdf4 Jul 2025
Building plan approvalFile: Page 7-9-2 ok.pdf4 Jul 2025
Declaration and undertaking (Annexure A)File: 17 Declaration Cum Undertaking.pdf4 Jul 2025

How this compares with Pune

0%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 4 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aura Waters Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vadgaon Bk14,000+ in Pune

2 kmAura Waters Phase IICompleted 55Lapsed / revoked 33Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 170 registered projects within 2 km.

Builder: Ranawat Properties

Ranawat Properties has 2 registrations on MahaRERA, including Aura Waters Phase -I and Aura Waters Phase II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Aura Waters Phase II is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aura Waters Phase II?

The registered promoter entity is Ranawat Properties, a partnership as per the filing. Its GSTIN 27AAYFR6879A1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aura Waters Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Aura Waters Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Aura Waters Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aura Waters Phase II?

The professionals named in the filing: Architect: Pinnac Consulting Pvt. Ltd.; Engineer: Pradip Ashok Kadale; Engineer: Ganesh Balasaheb Sonawane; Engineer: Sunil Mutalik and Associates; Chartered Accountant: Milan Shah; Chartered Accountant: Golesha and company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aura Waters Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aura Waters Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aura Waters Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.