Completed No litigation declared Residential / Group Housing project

VENKATESH SKYDALE PHASE 1

By Shree Venkatesh Buildcon

RG-MH-12985 · RERA P52100021836 · Last updated on MahaRERA portal: 17 Apr 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 270 documents Report an error

VENKATESH SKYDALE PHASE 1 is a Residential / Group Housing project by Shree Venkatesh Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100021836 on 31 Jul 2019. The registration is recorded completed; possession was promised by 30 Mar 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVENKATESH SKYDALE PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Sr No 20
    • Hissa No. 1
    • Plot H
    • Hingane Khurd
    • Sinhagad Rd
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411051
  • Pincode411051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021836
  • ReraGenie IDRG-MH-12985

Builder

  • NameShree Venkatesh Buildcon
  • Entity typePartnership
  • GSTIN27ABGFS4527F1Z4
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersLAHURAJ BHIMRAO ASABE, VITTHAL BAJIRAO GOSAVI, ANKUSH BHIMRAO ASABE
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2019PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed270 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDINGNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

C BUILDING: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities24

As on 17 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Swimming Pool & Kids Pool On Podium LevelYes100%
Society OfficeYes100%
Senior Citizen Sit outYes100%
OWCYes100%
Multipurpose Play CourtYes100%
LaundryYes100%
Jogging Track / WalkwayYes100%
Drivers RoomYes100%
CrecheYes100%

Parking filed168

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots168
Closed/Covered168

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area28,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
ANAND BAJIRAO GOSAVI AND OTHERSPune (M Corp.)Pune
TULSHIDAS BAJIRAO GOSAVI AND OTHERSPune (M Corp.)Pune
GANESH RAMBHAU GOSAVI AND OTHERSPune (M Corp.)Pune
TUSHAR SAMBHAJI GOSAVI AND OTHERSPune (M Corp.)Pune
SAGAR DIGAMBAR GOSAVI AND OTHERSPune (M Corp.)Pune
ULKA DIGAMBAR GOSAVIPune (M Corp.)Pune
MADHUKAR TUKARAM GOSAVI AND OTHERSPune (M Corp.)Pune
VITTHAL BAJIRAO GOSAVI AND OTHERSPune (M Corp.)Pune
KETAN SAMBHAJI GOSAVIPune (M Corp.)Pune

Approvals and building plan

Permissible FSI16079.0
Proposed, not sanctioned16,079 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 562/7, River View Aparment, Congress House Rd, opposite Sawarkar Bhavan, Shivajinagar, Pune, Maha

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhruvang S Hingmire
ArchitectSHUBHANGI S HINGMIRE
EngineerMilind Kadam
Chartered AccountantAVINASH JEEVAN UTGIKAR
PartnerRole in project
Shree Venkatesh Buildcon-

Litigation declared1

CaseCourtStatus
382/2021CIVILPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000106645Vijay Dhondopant CharolkarVenkatesh Buildcon Pvt. Ltd15/03/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Apr 2024

Documents filed270

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 270 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PH-1 WING C.pdf17 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD UNSOLD INVENTORY SKYDALE PH-1.pdf17 Apr 2024
Certificates of CA (Form 3)File: CA CERTIFICATE VENKATESH SKYDALE PH-1.pdf17 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE -SKYDALE- WING A-B-C COMMERCIAL AND WING B AND C RESIDENTIAL 19-3-217 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SKYDALE PH-1.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-1- MAR-24.pdf6 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PH-1-WING C-8-3-24.pdf23 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1-WING C-8-3-24.pdf23 Mar 2024
Certificates of CA (Form 3)File: CA CERTIFICATE VENKATESH SKYDALE PH-1.pdf23 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ACH CERTIFICATE SKYDALE PH-1.pdf11 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1.pdf11 Jan 2024
Form 2AFile: FORM 2A SKYDALE PH-1- DEC-23.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY SKYDALE WING C PH-1.pdf11 Jan 2024
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PH-1.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-1.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-1.pdf16 Oct 2023
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PH-1.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SKYDALE MAR-23- PHASE -1.pdf27 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1.pdf12 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTROY SKYDALE PH-1.pdf12 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1.pdf20 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKYDALE PH-1.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-1.pdf20 Jul 2023
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1-25-4-2023.pdf6 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1-25-4-2023.pdf6 May 2023
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHAE -1.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PH-1.pdf17 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf17 Apr 2023
Form 2AFile: FORM 2A SKYDALE PH-1.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOER OF SOLD INVENTROY SKYDALE PH-1.pdf17 Apr 2023
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1.pdf17 Apr 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CONCERN TO LEGAL AND FINANCE SKYDALE PH-1.pdf20 Mar 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CONCERN TO LEGAL AND FINANCE SKYDALE PH-1.pdf20 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Disclosure of Interest in Other Real Estate Organizations-SKYDALE PH-3.pdf20 Mar 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-PH-1.pdf24 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1.pdf24 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1.pdf24 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SKYDALE PH-1.pdf24 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-1.pdf24 Jan 2023
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1 WING C.pdf24 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Seprate Bank Account.pdf24 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -1.pdf10 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PH-1.pdf15 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1.pdf15 Oct 2022
Form 2AFile: FORM 2A SKYDALE PH-1-SEPT-2022.pdf15 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SKYDALE PH-1-SEPT-2022.pdf15 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-1.pdf15 Oct 2022
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1.pdf15 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 VENKATESH SKYDALE PHASE -1.pdf15 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -1.pdf15 Sep 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PH-1.pdf9 Aug 2022
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1.pdf14 Jul 2022
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1.pdf14 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1.pdf11 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf11 Jul 2022
Form 2AFile: FORM 2A - SKYDALE PHASE -1-JUN-22.pdf11 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -1.pdf11 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE -1.pdf14 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - SKYDALE PHASE -1-MAR-22.pdf14 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY SKYDALE PHASE -1.pdf14 Apr 2022
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PHASE -1.pdf14 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE-1.pdf8 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PH-1.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - SKYDALE PH-1-DEC-2021.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVENTORY-SKYDALE-PH-1.pdf8 Jan 2022
Certificates of CA (Form 3)File: CA Certiticate Venkatesh Skydale Phase 1 -06-01-2022_compressed.pdf8 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE-1.pdf14 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf14 Dec 2021
CERSAI detailsFile: CERSAI REPORT - SKYDALE.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD INVETORY SKYDALE PH-1.pdf14 Dec 2021
Certificates of CA (Form 3)File: CA CERTIFICATE SKYDALE PH-1.pdf14 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE SKYDALE PHASE-1.pdf6 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE SKYDALE PHASE -1.pdf6 Dec 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH GRAFFITI PHASE 1SR NO 31 PLUS 35 PART KESHAV NAGAR MUNDHWA PUNE 411036358CompletedJul 2017Apr 2017
VENKATESH LAKE VISTASR NO 8 PLUS 9 PART DATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046672CompletedDec 2015Dec 2015
VENKATESH SHARVILSR NO 26 PART DHAYARI PUNE 411041186CompletedMar 2014Jul 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VENKATESH SKYDALE PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hingane Khurd, Sinhagad Rd13,700+ in Pune

2 kmVENKATESH SKYDALE PHASE Completed 49Lapsed / revoked 32Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 135 registered projects within 2 km.

Builder: Shree Venkatesh Buildcon

Shree Venkatesh Buildcon has 4 registrations on MahaRERA, including VENKATESH SKYDALE PHASE 1 and Venkatesh Skydale Phase 2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VENKATESH SKYDALE PHASE 1 is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VENKATESH SKYDALE PHASE 1?

The registered promoter entity is Shree Venkatesh Buildcon, a partnership as per the filing. Its GSTIN 27ABGFS4527F1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VENKATESH SKYDALE PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VENKATESH SKYDALE PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VENKATESH SKYDALE PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VENKATESH SKYDALE PHASE 1?

The professionals named in the filing: Architect: Dhruvang S Hingmire; Architect: SHUBHANGI S HINGMIRE; Engineer: Milind Kadam; Chartered Accountant: AVINASH JEEVAN UTGIKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VENKATESH SKYDALE PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VENKATESH SKYDALE PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VENKATESH SKYDALE PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.