Home / Browse projects / Palghar, Maharashtra / Veena Velocity PH-II

Registration lapsed No litigation declared Others project

Veena Velocity PH-II

By NIKUNJ DEVELOPERS

RG-MH-60396 · RERA P99000014147 · Last updated on MahaRERA portal: 4 Jan 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 73 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2020Possession promised73 months past this date
45 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 80%
3Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Veena Velocity PH-II is a Others project by NIKUNJ DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000014147 on 9 Nov 2017. Possession was promised by 30 Sep 2020 and is now 73 months past that date. The completion date has moved by 18 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameVeena Velocity PH-II
  • TypeOthers
  • Location
    • 100 feet Road
    • Vasai-West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000014147
  • ReraGenie IDRG-MH-60396

Builder

  • NameNIKUNJ DEVELOPERS
  • Entity typePartnership
  • PartnersDHAVAL HITESHKUMAR SANGHAVI, HARESH NATVARLAL SANGHAVI, VEENA HARESH SANGHAVI
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

73 months past promisethis monthRegisteredNov 2017First promiseMar 2019Revised toSep 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Nov 2017
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 31 Mar 2019)
  • Buildings5 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing - ANA90000
Wing - BNA90000
Wing - CNA90000
Wing - DNA90000
Wing - ENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 4 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 80%.

Wing - A89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing - B89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing - C89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing - D89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing - E89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 4 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered46
Open Space59
BuildingClosed/CoveredOpen SpaceTotal
Wing - A71219
Wing - B71219
Wing - C71219
Wing - D141226
Wing - E111122

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,425 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI7991.08
Proposed, not sanctioned7,991 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOne India Bull Center, Tower 2B, 6th floor,841 Senapati Bapat Marg, Lower Parel West Mumbai-400013

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDivyesh Shah
Architectkaushik patel
ArchitectKPA
EngineerSHAH GATTANI CONSULTANTS
EngineerAshok Harsora
Chartered AccountantCA Sanjay K Sharma & Co.
Chartered AccountantThar & Co.
PartnerRole in project
NIKUNJ DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000002451Mar 2019 → Mar 2020

Reason as filed by the promoterDear Sir, We would like to inform you that Project having original date of completion was 31/03/2019 as mentioned in the declaration given in FORM-B and we have completed buildings/wings activity work in all respect wherein common layout work is under progress.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000193942Mr. Vilas Janardan GodeM/s. Nikunj Developers07/09/2020
CC006000000057996Mahesh Kumar BalmikiHaresh Sanghavi08/02/2019
CC006000000396071Mahesh Kumar Deep Kumar BalmikiNIKUNJ DEVELOPERS23/07/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Certificate.pdf4 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate VELOCITY PH-II.pdf21 Sep 2021
Certificates of CA (Form 5)File: VEENA VELOCITY PH - II FORM - 5 ND.pdf30 Sep 2018
Proforma of Allotment letterFile: Layout Plan for Annexure B-I.pdf3 Apr 2018
Layout approvalFile: Wing-C_Annexure-F.pdf27 Mar 2018
Copy of Layout Approval (in case of layout)File: Wing-C_Annexure-F.pdf27 Mar 2018
Proforma of Allotment letterFile: Wing-A_Annexure-F.pdf27 Mar 2018
Proforma of Allotment letterFile: Wing-B_Annexure-F.pdf27 Mar 2018
Proforma of Allotment letterFile: Wing-D_Annexure-F.pdf27 Mar 2018
Proforma of Allotment letterFile: Wing-E_Annexure-F.pdf27 Mar 2018
Proforma of Allotment letterFile: Wing-D_Annexure-F.pdf27 Mar 2018
Proforma of Allotment letterFile: AMENITIES-G.pdf27 Mar 2018
Proforma of Allotment letterFile: A-1_NA_Order_20_04_2004_2004.pdf27 Mar 2018
Proforma of Allotment letterFile: A-2_NA_Order_06_10_08_08.pdf27 Mar 2018
Proforma of Allotment letterFile: A-3_NA_Order20_07_10_10.pdf27 Mar 2018
Proforma of Allotment letterFile: Annexure_C.pdf27 Mar 2018
Proforma of Allotment letterFile: D-1_Title_Certificate_11_05_10_10.pdf27 Mar 2018
Proforma of Allotment letterFile: D-2_New_Title_Certificate.pdf27 Mar 2018
Proforma of Allotment letterFile: E_Annexure_7-12_7-12.pdf27 Mar 2018
Proforma of Allotment letterFile: D-1_Title_Certificate_11_05_10_10.pdf27 Mar 2018
Proforma of Allotment letterFile: FINAL DRAFT AGREEMENT FOR SALE RERA - VEENA VELOCITY PHASE II.pdf26 Mar 2018
Proforma of Allotment letterFile: Floor Plan Wing-A Annexure B-I.pdf26 Mar 2018
Proforma of Allotment letterFile: Floor Plan Wing-B Annexure B-I.pdf26 Mar 2018
Proforma of Allotment letterFile: Floor Plan Wing-C Annexure B-I.pdf26 Mar 2018
Proforma of Allotment letterFile: Floor Plan Wing-D Annexure B-I.pdf26 Mar 2018
Proforma of Allotment letterFile: Floor Plan Wing-E Annexure B-I.pdf26 Mar 2018
Proforma of Allotment letterFile: Layout Annexure- B.pdf26 Mar 2018
Details of encumbrancesFile: ND Velocity Encumbrance certificate.pdf24 Oct 2017
Commencement Certificates / NA Order for plotted developmentFile: Velocity II Comencement Certificate.pdf24 Oct 2017
Declaration in FORM BFile: Velocity Form B.pdf24 Oct 2017
Copy of the legal title reportFile: Velocity title certificate.pdf12 Oct 2017
Certificates of CA (Form 3)File: Form-3.pdf11 Oct 2017
Layout approvalFile: Layout Plan for All Phase111.pdf6 Oct 2017
Building plan approvalFile: Approved Plan 2.pdf6 Oct 2017
Building plan approvalFile: Approved Plan 2.pdf6 Oct 2017
Building plan approvalFile: Approved Plan 3.pdf6 Oct 2017
Building plan approvalFile: Approved Plan 4.pdf6 Oct 2017
PAN CardFile: ND_PAN CARD.pdf6 Oct 2017
Copy of Layout Approval (in case of layout)File: Layout Plan for All Phase111.pdf6 Oct 2017
Building Plan Approval (IOD)File: Approved Plan 2.pdf6 Oct 2017
Building Plan Approval (IOD)File: Approved Plan 2.pdf6 Oct 2017
Building Plan Approval (IOD)File: Approved Plan 3.pdf6 Oct 2017
Building Plan Approval (IOD)File: Approved Plan 4.pdf6 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Final.pdf6 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - final.pdf6 Oct 2017
Proforma of Allotment letterFile: Letter of Allotment and Agreement for Sale.pdf6 Oct 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VEENA DYNASTY PHASE IVASAI EAST501CompletedMay 2015Apr 2015

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 18 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veena Velocity PH-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-West3,200+ in Palghar

2 kmVeena Velocity PH-IICompleted 44Lapsed / revoked 25Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: NIKUNJ DEVELOPERS

NIKUNJ DEVELOPERS has 3 registrations on MahaRERA, including VEENA DYNASTY PH II and Veena Velocity PH-II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that Veena Velocity PH-II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Veena Velocity PH-II is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veena Velocity PH-II?

The registered promoter entity is NIKUNJ DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veena Velocity PH-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Veena Velocity PH-II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Veena Velocity PH-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Veena Velocity PH-II?

The professionals named in the filing: Architect: Divyesh Shah; Architect: kaushik patel; Architect: KPA; Engineer: SHAH GATTANI CONSULTANTS; Engineer: Ashok Harsora; Chartered Accountant: CA Sanjay K Sharma & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Veena Velocity PH-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veena Velocity PH-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veena Velocity PH-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.