Veena Velocity PH-II
RG-MH-60396 · RERA P99000014147 · Last updated on MahaRERA portal: 4 Jan 2022
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 73 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Veena Velocity PH-II is a Others project by NIKUNJ DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000014147 on 9 Nov 2017. Possession was promised by 30 Sep 2020 and is now 73 months past that date. The completion date has moved by 18 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameVeena Velocity PH-II
- TypeOthers
- Location
- 100 feet Road
- Vasai-West
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401202
- Pincode401202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000014147
- ReraGenie IDRG-MH-60396
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Nov 2017
- Promised completion30 Sep 2020
- Revised completionRevised to 30 Sep 2020 (originally 31 Mar 2019)
- Buildings5 building records
- Documents filed46 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing - A | NA | 9 | 0 | 0 | 0 | 0 |
| Wing - B | NA | 9 | 0 | 0 | 0 | 0 |
| Wing - C | NA | 9 | 0 | 0 | 0 | 0 |
| Wing - D | NA | 9 | 0 | 0 | 0 | 0 |
| Wing - E | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 4 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 80%.
Wing - A89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Wing - B89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Wing - C89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Wing - D89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Wing - E89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 4 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed105
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing - A | 7 | 12 | 19 |
| Wing - B | 7 | 12 | 19 |
| Wing - C | 7 | 12 | 19 |
| Wing - D | 14 | 12 | 26 |
| Wing - E | 11 | 11 | 22 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Divyesh Shah |
| Architect | kaushik patel |
| Architect | KPA |
| Engineer | SHAH GATTANI CONSULTANTS |
| Engineer | Ashok Harsora |
| Chartered Accountant | CA Sanjay K Sharma & Co. |
| Chartered Accountant | Thar & Co. |
| Partner | Role in project |
|---|---|
| NIKUNJ DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, We would like to inform you that Project having original date of completion was 31/03/2019 as mentioned in the declaration given in FORM-B and we have completed buildings/wings activity work in all respect wherein common layout work is under progress.
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000193942 | Mr. Vilas Janardan Gode | M/s. Nikunj Developers | 07/09/2020 |
| CC006000000057996 | Mahesh Kumar Balmiki | Haresh Sanghavi | 08/02/2019 |
| CC006000000396071 | Mahesh Kumar Deep Kumar Balmiki | NIKUNJ DEVELOPERS | 23/07/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Oct 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Oct 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed46
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Certificate.pdf | 4 Jan 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate VELOCITY PH-II.pdf | 21 Sep 2021 |
| Certificates of CA (Form 5)File: VEENA VELOCITY PH - II FORM - 5 ND.pdf | 30 Sep 2018 |
| Proforma of Allotment letterFile: Layout Plan for Annexure B-I.pdf | 3 Apr 2018 |
| Layout approvalFile: Wing-C_Annexure-F.pdf | 27 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: Wing-C_Annexure-F.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: Wing-A_Annexure-F.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: Wing-B_Annexure-F.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: Wing-D_Annexure-F.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: Wing-E_Annexure-F.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: Wing-D_Annexure-F.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: AMENITIES-G.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: A-1_NA_Order_20_04_2004_2004.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: A-2_NA_Order_06_10_08_08.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: A-3_NA_Order20_07_10_10.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: Annexure_C.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: D-1_Title_Certificate_11_05_10_10.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: D-2_New_Title_Certificate.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: E_Annexure_7-12_7-12.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: D-1_Title_Certificate_11_05_10_10.pdf | 27 Mar 2018 |
| Proforma of Allotment letterFile: FINAL DRAFT AGREEMENT FOR SALE RERA - VEENA VELOCITY PHASE II.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: Floor Plan Wing-A Annexure B-I.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: Floor Plan Wing-B Annexure B-I.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: Floor Plan Wing-C Annexure B-I.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: Floor Plan Wing-D Annexure B-I.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: Floor Plan Wing-E Annexure B-I.pdf | 26 Mar 2018 |
| Proforma of Allotment letterFile: Layout Annexure- B.pdf | 26 Mar 2018 |
| Details of encumbrancesFile: ND Velocity Encumbrance certificate.pdf | 24 Oct 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Velocity II Comencement Certificate.pdf | 24 Oct 2017 |
| Declaration in FORM BFile: Velocity Form B.pdf | 24 Oct 2017 |
| Copy of the legal title reportFile: Velocity title certificate.pdf | 12 Oct 2017 |
| Certificates of CA (Form 3)File: Form-3.pdf | 11 Oct 2017 |
| Layout approvalFile: Layout Plan for All Phase111.pdf | 6 Oct 2017 |
| Building plan approvalFile: Approved Plan 2.pdf | 6 Oct 2017 |
| Building plan approvalFile: Approved Plan 2.pdf | 6 Oct 2017 |
| Building plan approvalFile: Approved Plan 3.pdf | 6 Oct 2017 |
| Building plan approvalFile: Approved Plan 4.pdf | 6 Oct 2017 |
| PAN CardFile: ND_PAN CARD.pdf | 6 Oct 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan for All Phase111.pdf | 6 Oct 2017 |
| Building Plan Approval (IOD)File: Approved Plan 2.pdf | 6 Oct 2017 |
| Building Plan Approval (IOD)File: Approved Plan 2.pdf | 6 Oct 2017 |
| Building Plan Approval (IOD)File: Approved Plan 3.pdf | 6 Oct 2017 |
| Building Plan Approval (IOD)File: Approved Plan 4.pdf | 6 Oct 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Final.pdf | 6 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - final.pdf | 6 Oct 2017 |
| Proforma of Allotment letterFile: Letter of Allotment and Agreement for Sale.pdf | 6 Oct 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VEENA DYNASTY PHASE I | VASAI EAST | 501 | Completed | May 2015 | Apr 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 46 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Veena Velocity PH-II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vasai-West3,200+ in Palghar
Filed coordinates, straight-line distance. 123 registered projects within 2 km.
PEARL GARDENS
Mansarovar Lifespaces LLP
ORNATE SERENITY
SAI ORNATE DEVELOPERS
FLAMINGO RESIDENCY
SHANTEE REALTY AND LIFE SPACE
ALTURA UMELE
RUBY LIFESPACES
RBI EmployeesGokul Co-Op. Housing Society Ltd,
SW REALTORS
J V NAGAR
JONES VEGAS BUILDERS
See every Palghar project, with the district possession charts
Builder: NIKUNJ DEVELOPERS
NIKUNJ DEVELOPERS has 3 registrations on MahaRERA, including VEENA DYNASTY PH II and Veena Velocity PH-II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that Veena Velocity PH-II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Veena Velocity PH-II is delayed beyond 30 Sep 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Veena Velocity PH-II?
The registered promoter entity is NIKUNJ DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Veena Velocity PH-II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Veena Velocity PH-II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Veena Velocity PH-II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Veena Velocity PH-II?
The professionals named in the filing: Architect: Divyesh Shah; Architect: kaushik patel; Architect: KPA; Engineer: SHAH GATTANI CONSULTANTS; Engineer: Ashok Harsora; Chartered Accountant: CA Sanjay K Sharma & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Veena Velocity PH-II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback