Home / Browse projects / Palghar, Maharashtra / ALTURA UMELE

Registered No litigation declared Others project

ALTURA UMELE

By RUBY LIFESPACES

RG-MH-96689 · RERA P99000048381 · Last updated on MahaRERA portal: 5 Sep 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 92%
196 of 272Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

ALTURA UMELE is a Others project by RUBY LIFESPACES in Palghar, Maharashtra, registered with MahaRERA as P99000048381 on 3 Jan 2023. Possession is promised by 27 Nov 2027. 76 of the 272 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameALTURA UMELE
  • TypeOthers
  • Location
    • UMELE
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000048381
  • ReraGenie IDRG-MH-96689

Builder

  • NameRUBY LIFESPACES
  • Entity typePartnership

Key dates

this monthRegisteredJan 2023PromisedNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion27 Nov 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed87 files

Current status

28%76 of 272 units booked
78.5%Work done, per cost certificate

Figures as on 5 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA171662163
B WINGNA17161101111
C WINGNA181798098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 92%.

A WING69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
B WING69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
C WING69%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 5 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed376

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots376
Open Space376
BuildingOpen SpaceTotal
A WING126126
B WING125125
C WING125125

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,547 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Aug 2025

Approvals and building plan

Sanctioning authorityVASAI VIRAL CITY MUNCIPAL CORARATION
Permissible FSI16393.23
Proposed, not sanctioned16,393 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPapdy, Vasai West
Estimated costRs 61.44 cr
Cost incurredRs 48.20 cr
Work done78.45%
BuildingWingEstimatedIncurred
B WINGNARs 21.21 crRs 18.70 cr
C WINGNARs 19.08 crRs 16.00 cr
A WINGNARs 15.15 crRs 13.50 cr
-NARs 6.00 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR. SANJAY S. NARANG
ArchitectEN CON ARCHITECTURAL & STRUCTURAL WORKS
EngineerMR. SANJAY S. NARANG
Engineersiddhesh gawde
Chartered AccountantD R AGARWAL & ASSOCIATES
Chartered AccountantAS KANCHWALA & CO
Chartered Accountantpremsheela gupta
Chartered AccountantD R AGRAWAL & ASSOCIATES
PartnerRole in project
RUBY LIFESPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 27 Nov 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A 25-26 Altura Umele.pdf5 Sep 2026
Form 5 (FY 2025-2026)File: Form 5 Altura Umele.pdf4 Sep 2026
Withdrawal Update Form 1File: form 1.pdf7 Aug 2026
Withdrawal Update Form 2File: form 2.pdf7 Aug 2026
Withdrawal Update Form 3File: form 3 new.pdf7 Aug 2026
Withdrawal Update Form 1File: form 1.pdf12 Jun 2026
Withdrawal Update Form 2File: form 2.pdf12 Jun 2026
Withdrawal Update Form 3File: form 3 final.pdf12 Jun 2026
Withdrawal Update Form 1File: Architect-Engineer Certificate Form 1.pdf21 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf21 Feb 2026
Withdrawal Update Form 3File: Form -3.pdf21 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf15 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf15 Nov 2025
Withdrawal Update Form 3File: Form-3.pdf15 Nov 2025
Withdrawal Update Form 1File: Form 1 Date -30-06-2025.pdf1 Nov 2025
Withdrawal Update Form 2File: Form -2 Date 30-06-2025.pdf1 Nov 2025
Withdrawal Update Form 3File: Form-3.pdf1 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Dec New (1).pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Soled Booked Inventory.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 June.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 June.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A 23-24.pdf23 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 Dr agrawal.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List for Rera.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold List for Rera.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form -3 Ruby Lifespaces.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Booked Inventory.pdf11 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form no 5 (1).pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Encon Form-1 03 23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Encon Form-1 06 23.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sanjay S Narang Form-2 03 23.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sanjay S Narang Form-2 06 23.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form-3 03 23.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form-3 06 23 (2).pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: img20230816_15425621.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form -1.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ruby Lifespaces Form 1 ARCHITES.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ruby Lifespaces From-2 Engineer Certificate.pdf11 Jul 2023
Proforma of Agreement for saleFile: 291222 draft Agreement for Sale.pdf29 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 (1).pdf12 Dec 2022
Building plan approvalFile: BLDG PLAN 1.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN 2.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN 3.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN 4.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN 5.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN 6.pdf6 Dec 2022
Building plan approvalFile: BLDG PLAN 7.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 1.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 2.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 3.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 4.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 5.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 6.pdf6 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN 7.pdf6 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf6 Dec 2022
Layout approvalFile: PLANS.pdf3 Dec 2022
PAN CardFile: 1 PAN Card.pdf3 Dec 2022
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf3 Dec 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf3 Dec 2022
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf3 Dec 2022
Copy of Layout Approval (in case of layout)File: PLANS.pdf3 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf3 Dec 2022
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf3 Dec 2022

How this compares with Palghar

28%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ALTURA UMELE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

2 kmALTURA UMELECompleted 16Lapsed / revoked 10Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: RUBY LIFESPACES

RUBY LIFESPACES has 1 registration on MahaRERA, including ALTURA UMELE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ALTURA UMELE is delayed beyond 27 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALTURA UMELE?

The registered promoter entity is RUBY LIFESPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALTURA UMELE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALTURA UMELE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALTURA UMELE?

The professionals named in the filing: Architect: MR. SANJAY S. NARANG; Architect: EN CON ARCHITECTURAL & STRUCTURAL WORKS; Engineer: MR. SANJAY S. NARANG; Engineer: siddhesh gawde; Chartered Accountant: D R AGARWAL & ASSOCIATES; Chartered Accountant: AS KANCHWALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALTURA UMELE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALTURA UMELE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALTURA UMELE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.