Home / Browse projects / Nagpur, Maharashtra / VEDANT TANZANITE
VEDANT TANZANITE
By NANIS BUILDCON PRIVATE LIMITED
RG-MH-03523 · RERA P50500027413 · Last updated on MahaRERA portal: 25 Nov 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VEDANT TANZANITE is a Residential / Group Housing project by NANIS BUILDCON PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500027413 on 8 Dec 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameVEDANT TANZANITE
- TypeResidential / Group Housing
- Location
- SONEGAON
- SWAGAT CO-OP SOCIETY LAYOUT
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440023
- Pincode440023
- RERA no.P50500027413
- ReraGenie IDRG-MH-03523
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Dec 2020
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VEDANT TANZANITE | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
VEDANT TANZANITE: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed69
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | EMANATE DESIGN |
| Engineer | P S Patankar & Associates |
| Chartered Accountant | GAD & ASSOCIATES |
| Partner | Role in project |
|---|---|
| NANIS BUILDCON PRIVATE LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501712 | Narayan Swarup Mishra | NANIS BUILDCON PRIVATE LIMITED | 25/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Jan 2024
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Vedant Tanzanite_Mar-24.pdf | 25 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TENZANITE FORM 3_June-24.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TENZANITE FORM 3_Mar-24.pdf | 22 Apr 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: VEDAN TANZANITE.pdf | 8 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TENZANITE FORM 3 DEC 2023.pdf | 7 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Vedant Tanzanite_Dec-23.pdf | 18 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: VEDANT TANZANITE_RERA Form 2A -Mar-21.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VEDANT TANZANITE_RERA Form 2A -Mar-22.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: VEDANT TANZANITE_RERA Form 2A -Mar-23.pdf | 30 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VEDANT TANZANITE_FORM-5_Mar-23_.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN-2022 VEDANT TANZANITE 11-10-202311102023114105 (2)_compressed.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP-2022 VEDANT TANZANITE 11-10-202311102023114846 (1)_compressed.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FOEM 3 DEC-2022 VEDANT TANZANITE 11-10-202311102023120832 (1)_compressed.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR-2023 VEDANT TANZANITE 11-10-202311102023115806 (1)_compressed.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUN-2023 VEDANT TANZANITE 12-10-202312102023140026 (2)_compressed.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP-2023 VEDANT TANZANITE 12-10-202312102023141029 (1)_compressed.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-2023 VEDANT TANZANITE 12-10-202312102023133042 (1).pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_VEDANT TANZANITE 02-01-2021.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_VEDANT TANZANITE 07-04-2021.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_VEDANT TANZANITE 09-10-2022.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_VEDANT TANZANITE 05-01-2023.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_VEDANT TANZANITE 05-01-2023.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_VEDANT TANZANITE 07-04-2023.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6_VEDANT TANZANITE 09-06-2023.pdf | 2 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7_VEDANT TANZANITE 01-10-2023.pdf | 2 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VEDANT TANZANITE-FORM-5_MAR-22.pdf | 14 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VEDANT TANZANITE-FORM-5.pdf | 14 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: vedant tanzanite form 1_11zon.pdf | 26 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200241652417_For_Asset_Based_Search_07_07_2022_15_47_24_208.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3-Vedant Tenzanite-dec-22.pdf | 30 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Vedant Tenzanite-march22 (1).pdf | 30 May 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_Vedant Tanzanite.pdf | 24 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vedant Tanzanite March 2022.pdf | 6 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Vedant Tenzanite-Jan-22.pdf | 14 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Vedant Tenzanite-sep-21.pdf | 14 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM-2-Vedant TANZANITE-Sep-21.pdf | 14 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Vedant Tenzanite-June-21.pdf | 14 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A-Vedant Tanxanite-sep-21.pdf | 14 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Sold booked Inventory-Vedant Tenzanite-sep-21.pdf | 14 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1- Vedant Tanzanite-Sep-21.pdf | 12 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Vedant Tenzanite-sep-21.pdf | 10 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM-2A-Vedant Tenzanite-Dec-20.pdf | 30 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A JUNE 2021_compressed TANZANITE.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A MARCH 2021_compressed TANZANITE.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JUNE 2021_compressed TANZANITE.pdf | 15 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TANZANITE MAR 21_compressed.pdf | 15 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TANZANITE JUNE 21_compressed.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 TANZANITE 21.pdf | 15 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TANZANITE.pdf | 14 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: download NANIS.pdf | 2 Mar 2021 |
| Building plan approvalFile: Building Plan.pdf | 22 Feb 2021 |
| Details of encumbrancesFile: encum nanis_1.pdf | 22 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 22 Feb 2021 |
| Declaration in FORM BFile: form b nanis (1).pdf | 22 Feb 2021 |
| Building plan approvalFile: Building Permit Tanzanite.pdf | 20 Feb 2021 |
| Layout approvalFile: Nani's Amalgamation Plan.pdf | 20 Feb 2021 |
| Copy of the legal title reportFile: Title Certificate(2).pdf | 20 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Nani's Amalgamation Plan.pdf | 20 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Permit Tanzanite.pdf | 20 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Vedant Tanzanite.pdf | 20 Feb 2021 |
| Layout approvalFile: Layout Sanction.pdf | 5 Dec 2020 |
| Building plan approvalFile: Building plan.pdf | 5 Dec 2020 |
| Copy of the legal title reportFile: Title Report_VEDANT_TANZANITE.pdf | 5 Dec 2020 |
| Details of encumbrancesFile: No Encumbarance Cert.pdf | 5 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: Layout Sanction.pdf | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan.pdf | 5 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Permit.pdf | 5 Dec 2020 |
| Declaration in FORM BFile: Form B.pdf | 5 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certi.pdf | 5 Dec 2020 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 5 Dec 2020 |
| Proforma of Allotment letterFile: Undertaking.pdf | 5 Dec 2020 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VEDANT DIAMOND | VEDANT DIAMOND AJNI SNEHA NAGAR NAGPUR | 47 | Completed | Dec 2015 | Mar 2015 |
| VEDANT EMERALD I | VEDANT EMERALD I PLOT NO 27 AWASTHI LAYOUT MOUZA SONEGAON NAGPUR | 12 | Completed | Aug 2014 | Feb 2014 |
| VEDANT SAPPHIRE | VEDANT SAPPHIRE AJANI SNEHA NAGAR NAGPUR | 48 | Completed | Mar 2014 | Nov 2013 |
| VEDANT PEARL | VEDANT PEARL MOUZA AJANI SNEHA NAGAR NAGPUR | 42 | Completed | Dec 2011 | Late, Apr 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep VEDANT TANZANITE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SWAGAT CO-OP SOCIETY LAYOUT2,800+ in Nagpur
PREMIER HERITAGE WADDHAMNA -182
PREMIER HERITAGE
PREMIER HERITAGE WADDHAMNA -181
PREMIER HERITAGE
SHREE RAM EMPIRE
SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISH
SDPL Aashray Dabha II
SANDEEP DWELLERS PVT. LTD.
PREMIER HERITAGE WADDHAMNA -183
PREMIER HERITAGE
SDPL Suvarnabhumi
SANDEEP DWELLERS PVT. LTD.
See every Nagpur project, with the district possession charts
Builder: NANIS BUILDCON PRIVATE LIMITED
NANIS BUILDCON PRIVATE LIMITED has 8 registrations on MahaRERA, including VEDANT PERIDOT and VEDANT EMERALD PHASE 2. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if VEDANT TANZANITE is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VEDANT TANZANITE?
The registered promoter entity is NANIS BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VEDANT TANZANITE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VEDANT TANZANITE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VEDANT TANZANITE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VEDANT TANZANITE?
The professionals named in the filing: Architect: EMANATE DESIGN; Engineer: P S Patankar & Associates; Chartered Accountant: GAD & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VEDANT TANZANITE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback