VB RENAISSANCE

By SAMRAT DEVELOPERS

RG-MH-93014 · RERA P52100051681 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Staircases, 95%
24 of 42Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

VB RENAISSANCE is a Residential / Group Housing project by SAMRAT DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100051681 on 27 Jun 2023. Possession is promised by 31 Dec 2026. 18 of the 42 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVB RENAISSANCE
  • TypeResidential / Group Housing
  • Location
    • BIBWEWADI ROAD
    • BIBWEWADI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411037
  • Pincode411037
  • RERA no.P52100051681
  • ReraGenie IDRG-MH-93014

Builder

  • NameSAMRAT DEVELOPERS
  • Entity typePartnership
  • PartnersHITESH KISHOR NAWALAKHA, RAJENDRA KESHARCHAND BORA

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed136 files

Current status

43%18 of 42 units booked
100.0%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VB RENAISSANCENA161642042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

VB RENAISSANCE: 94% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes40%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed263

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots263
Closed/Covered263

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,161 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
SAMRAT DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI8143.7
Proposed, not sanctioned7,767 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOSWAL BANDHU SAMAJ BUILDING, OPP HOTEL SEVEN LOVE, SHANKARSHETH ROAD, PUNE
Estimated costRs 28.00 cr
Cost incurredRs 28.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
VB RENAISSANCENARs 24.00 crRs 24.00 cr
-NARs 4.00 crRs 4.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGROUP CONSULTANTS
EngineerMADOLAPPA BIRADAR
Chartered AccountantCA. RAKESH B PARMAR
Chartered AccountantASHISH S OSWAL & CO
Chartered AccountantN V Dhadiwal & Associates LLP
PartnerRole in project
SAMRAT DEVELOPERS-

Litigation declared2

CaseCourtStatus
556/2017Hon'ble Civil Judge Senior Division, PuneClosed
3434/2019High Court Judicature at Bombay Civil Appellate JurisdictionClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600541Ram GawaliSAMRAT DEVELOPERS23/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2026.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2_June2026.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3_June 2026.pdf13 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 31 March 2026.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2026.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2026.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - March 2026.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Dec 2025.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Dec 2025.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - Dec 2025.pdf28 Jan 2026
Layout approvalFile: Layout Approval.pdf16 Oct 2025
Building plan approvalFile: Building Plan 1.pdf16 Oct 2025
Building plan approvalFile: Building Plan 2.pdf16 Oct 2025
Building plan approvalFile: Building Plan 3.pdf16 Oct 2025
Building plan approvalFile: Building Plan 4.pdf16 Oct 2025
Withdrawal Update Form 1File: FORM 1_Sept 2025.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2_Sept 2025.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate - September 2025- Signed.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 - VB Renaissance - signed.pdf12 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - June 2025.pdf25 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certifictae - June 2025.pdf25 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate - June 2025_Compressed.pdf25 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - March 2025_Signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March 2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory March 2025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 2024_11zon.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 2024_11zon.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 2024_11zon.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Dec 2024.pdf18 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf18 Jan 2025
Proforma of Agreement for saleFile: Agreement for sale draft.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_dt30092024_11zon.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samrat Developers Form 3_30092024_11zon.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samrat Developers_Form 2_30092024_11zon.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_30092024.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samrat Developers Form 3.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samrat Developers Form 2.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_FY2023-24.pdf18 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured AND Unsecured finance.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Qtr 30062024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30062024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_30-06-2024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30062024.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Qtr 30062024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_30-06-2024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q4.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q1.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q2.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q3.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q4.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q3_11zon (1).pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q4_11zon.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q3.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q4.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q3_11zon.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q4_11zon.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q2.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q3.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY 23-24_Q4.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4.pdf30 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Q4.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q3_11zon (2).pdf30 May 2024

How this compares with Pune

43%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VB RENAISSANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BIBWEWADI13,700+ in Pune

Builder: SAMRAT DEVELOPERS

SAMRAT DEVELOPERS has 1 registration on MahaRERA, including VB RENAISSANCE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VB RENAISSANCE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VB RENAISSANCE?

The registered promoter entity is SAMRAT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VB RENAISSANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VB RENAISSANCE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VB RENAISSANCE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VB RENAISSANCE?

The professionals named in the filing: Architect: GROUP CONSULTANTS; Engineer: MADOLAPPA BIRADAR; Chartered Accountant: CA. RAKESH B PARMAR; Chartered Accountant: ASHISH S OSWAL & CO; Chartered Accountant: N V Dhadiwal & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VB RENAISSANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VB RENAISSANCE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VB RENAISSANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.