Home / Browse projects / Raigarh, Maharashtra / VANSH HEIGHTS

Registered No litigation declared Residential / Group Housing project

VANSH HEIGHTS

By NAVKAR DEVELOPERS

RG-MH-39049 · RERA P52000049810 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 26 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 26 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
42 of 51Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

VANSH HEIGHTS is a Residential / Group Housing project by NAVKAR DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000049810 on 24 Feb 2023. Possession is promised by 31 Mar 2028. The completion date has moved by 26 months from the original filing. 9 of the 51 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameVANSH HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • PADA GATE
    • GANGANAGAR
    • Neral
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000049810
  • ReraGenie IDRG-MH-39049

Builder

  • NameNAVKAR DEVELOPERS
  • Entity typePartnership
  • PartnersNISHA SATISH OSWAL, PIYUSH PRAVIN OSWAL
  • Other registrations10 more →
  • Completed3 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2023First promiseJan 2026Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 9 Jan 2026)
  • Buildings1 building record
  • Documents filed81 files

Current status

18%9 of 51 units booked
92.1%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VANSH HEIGHTSNA7745651

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

VANSH HEIGHTS: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered1
Open Space34

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area993 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2025

Approvals and building plan

Sanctioning authorityRAIGAD ZILLA PARISHAD
Permissible FSI2232.65
Proposed, not sanctioned2,233 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBMT RESIDENCY SHOP NO 3 GROUND FLOOR AMRAI ROAD KARJAT 410201
Estimated costRs 4.25 cr
Cost incurredRs 3.92 cr
Work done92.13%
BuildingWingEstimatedIncurred
VANSH HEIGHTSNARs 3.97 crRs 3.89 cr
-NARs 28.34 lakhRs 2.83 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECT RAHUL SHRIKHANDE & ASSOCIATES
EngineerATUL KUDTARKAR & ASSOCIATES
EngineerAKON REALTY
Chartered AccountantNIRAJ OSWAL AND CO
PartnerRole in project
NAVKAR DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16072621777Jan 2026 → Mar 2028

Reason as filed by the promoterDear Sir, I, Mr. Piyush P. Oswal (Partner), hereby request you to grant extension of completion date for project " VANSH HEIGHTS ". situated at Plot Bearing 380/3 380/4 at Neral, Karjat, Raigarh, 410101, registered with "The Maharashtra Real Estate Regulatory Authority" vide project registration certificate bearing no. "P52000049810" for a further period of 27 months from 10th January 2026 to 31st March 2028. I respectfully submit that the extension for a period of 27 months is necessitated due to a combination of regulatory, financial and market factors that affected our ability to continue c

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q1 26-27.pdf6 Aug 2026
Withdrawal Update Form 2File: FORM 2 Q1 26-27.pdf6 Aug 2026
Withdrawal Update Form 3File: FORM 3 Q1 26-27.pdf6 Aug 2026
Form 2A (FY 2026-2027)File: FORM 2A NAVKAR.pdf5 Aug 2026
Form 2A (FY 2022-2023)File: FORM 2A NAVKAR.pdf16 Jul 2026
Form 2A (FY 2023-2024)File: FORM 2A NAVKAR.pdf16 Jul 2026
Form 2A (FY 2024-2025)File: FORM 2A NAVKAR.pdf16 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A NAVKAR.pdf16 Jul 2026
Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf16 Jul 2026
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf16 Jul 2026
Form 5 (FY 2024-2025)File: FORM 5 24-25.pdf16 Jul 2026
Withdrawal Update Form 1File: FORM 1 25-26.pdf24 Jun 2026
Withdrawal Update Form 2File: FORM 2 25-26.pdf24 Jun 2026
Withdrawal Update Form 3File: form 3 25-26.pdf24 Jun 2026
Withdrawal Update Form 1File: FORM 1 Q2 2025-26.pdf2 Feb 2026
Withdrawal Update Form 1File: FORM 1 Q3 2025-26.pdf2 Feb 2026
Withdrawal Update Form 2File: FORM 2 Q2 2025-26.pdf2 Feb 2026
Withdrawal Update Form 2File: FORM 2 Q3 2025-26.pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 Q2 25-26.pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 Q3 25-26.pdf2 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf12 Aug 2025
Withdrawal Update Form 2File: FORM 2.pdf12 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf12 Aug 2025
Form 1File: FORM 1 Q3 24-25.pdf28 May 2025
Form 2File: FORM 2 Q3 24-25.pdf28 May 2025
Form 3File: CA CERT Q3 24-25.pdf28 May 2025
Form 1File: FORM 1 Q4 24-25.pdf28 May 2025
Form 2File: FORM 2 Q4 24-25.pdf28 May 2025
Form 3File: FORM 3 Q4 24-25.pdf28 May 2025
Withdrawal Update Form 1File: FORM 1 Q4 24-25.pdf28 May 2025
Withdrawal Update Form 2File: FORM 2 Q4 24-25.pdf28 May 2025
Withdrawal Update Form 3File: FORM 1 Q4 24-25.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERT NO 101 FORM 1 NAVKAR DEVELOPERS AS ON 30-09-2024 (1)_rotated.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate Q2 24-25.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT Q2 24-25.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT Q4.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT Q4.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate Q4 2023-24.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM 3 Q3.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT Q3 .pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate Q4 2023-24.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT MARCH 2023.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT JUNE 23.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT SEPT 23.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEEER CERT MARCH 2023.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEEER CERT JUNE 2023.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEEER CERT SEPT 23.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate june 2023.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate SEPT 23.pdf20 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate 271123.pdf28 Nov 2023
Copy of the legal title reportFile: SEARCH TITLE FINAL.pdf18 Feb 2023
Proforma of Agreement for saleFile: AGREEMENT OF SALE final.pdf18 Feb 2023
Details of encumbrances concerned to FinanceFile: financial encumbraces.pdf13 Feb 2023
Details of encumbrances concerned to LegalFile: financial encumbraces.pdf13 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLUSRE 1.pdf13 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE 2.pdf13 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER PLOT (1).pdf13 Feb 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf13 Feb 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT.pdf13 Feb 2023
Declaration in FORM BFile: FORM B.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_certificate 15012022.pdf4 Feb 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRACES.pdf27 Jan 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRACES.pdf27 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT.pdf27 Jan 2023
Declaration about Commencement CertificateFile: DECLARATION cc.pdf27 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERT NO 60 Revised.pdf27 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NAVKAR DEVELOPERS .pdf27 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT ANNEX A.pdf27 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACC.pdf27 Jan 2023
Other - LegalFile: Navkar developers INDEX 2.pdf27 Jan 2023
Layout approvalFile: scan0801.pdf13 Jan 2023
Building plan approvalFile: PLAN 2.pdf13 Jan 2023
Building plan approvalFile: PLAN 1.pdf13 Jan 2023
Copy of Layout Approval (in case of layout)File: scan0801.pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf13 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf13 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257391866_For_Asset_Based_Search_12_01_2023_11_29_41_333.pdf13 Jan 2023

How this compares with Raigarh

18%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 26 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VANSH HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANGANAGAR5,900+ in Raigarh

2 kmVANSH HEIGHTSCompleted 79Lapsed / revoked 47Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: NAVKAR DEVELOPERS

Navkar developers has 11 registrations on MahaRERA, including Tulsi Centre Point and NAVKAR CITY. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if VANSH HEIGHTS is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VANSH HEIGHTS?

The registered promoter entity is NAVKAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VANSH HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VANSH HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VANSH HEIGHTS?

The professionals named in the filing: Architect: ARCHITECT RAHUL SHRIKHANDE & ASSOCIATES; Engineer: ATUL KUDTARKAR & ASSOCIATES; Engineer: AKON REALTY; Chartered Accountant: NIRAJ OSWAL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VANSH HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VANSH HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VANSH HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.