Home / Browse projects / Pune, Maharashtra / VALORA TOWERS-B

Registration lapsed No litigation declared Residential / Group Housing project

VALORA TOWERS-B

By ABISKY RITKRITI PROJECTS KESHAVNAGAR LLP

RG-MH-10159 · RERA P52100001776 · Last updated on MahaRERA portal: 20 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 29 complaints at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken
  • Rs 25.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
32 of 126Units unsoldnot recorded sold or booked
29Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

VALORA TOWERS-B is a Residential / Group Housing project by ABISKY RITKRITI PROJECTS KESHAVNAGAR LLP in Pune, Maharashtra, registered with MahaRERA as P52100001776 on 29 Jul 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 42 months from the original filing. 94 of the 126 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 29 complaints are on record with the regulator.

At a glance

Project

  • NameVALORA TOWERS-B
  • TypeResidential / Group Housing
  • Location
    • -
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001776
  • ReraGenie IDRG-MH-10159

Builder

  • NameABISKY RITKRITI PROJECTS KESHAVNAGAR LLP
  • Entity typeOthers
  • GSTIN27AANFG8048H1ZZ
  • PartnersPRANAY PRAKASH SHINGI SHINGI, VINAY PRAKASH SHINGI SHINGI
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredJul 2017First promiseJun 2021Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jul 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed117 files

Current status

75%94 of 126 units booked

Figures as on 20 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER BNA27211260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

TOWER B: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed152

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots152
Closed/Covered111
Open Space41

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,143 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL CAPITAL LIMITED
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on3 Jul 2026
LandownerVillageDistrict
YOGESH BALASAHEB LONKARKeshavnagar-MundwaPune

Approvals and building plan

Sanctioning authorityPune Metropolitian Regional Development Authority Pune
Permissible FSI10280.96
Proposed, not sanctioned6,258 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSIGNATURE BUILDING,BHANDARKAR ROAD , PUNE-04

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGM Architects
EngineerBalasaheb Vishwanath Pandre
Chartered AccountantCA NIKHIL BHUTADA
PartnerRole in project
ABISKY RITKRITI PROJECTS KESHAVNAGAR LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009265Jun 2021 → May 2022

Reason as filed by the promoterNON AVAILABILITY OF LABOURS AND THE CONSTRUCTION MATERIAL DUE TO COVID 19 PANDEMIC.

EXT52100016831Jun 2021 → Dec 2024

Reason as filed by the promoterNON AVAILABILITY OF LABOUR AND CONSTRUCTION MATERIAL DUE TO COVID 19 PANDEMIC.

Complaints filed with MahaRERA29

Case no.ComplainantRespondentFiled
CC005000000106448Govind AgrawalAbhsky-Ritkriti Projects keshavnagar LLP30/01/2022
CC005000000127139Dhiraj Sharad ZawarARP Builder24/05/2022
CC005000000157269DNYANESHWAR BAYAJI BHISEPRANAY PRAKASH SHINGI24/12/2022
CC005000000167498Rupesh Bapurao SatputeABISKY RITKRITI PROJECTS KESHAVNAGAR LLP30/08/2022
CC005000000177791Pooja B KhandareAbisky Ritkriti Projects14/11/2022
CC005000000177758Mayur Shankarrao ShethePranay Shingi08/11/2022
CC005000000177777Prajwal ARABISKY RITKRITI PROJECTS09/11/2022
CC005000000177799SUNIL KUMARPranay Prakash Singhi14/11/2022
CC005000000177800Nishant Naresh PunjabiPranay Prakash Shingi14/11/2022
CC005000000177814Christopher Mathew FernandezPranay Prakash Shingi21/11/2022
CC005000000177833DEEPAK BAPU GANGURDEPranay Shingi21/11/2022
CC005000000177851Ankur VachherAbisky Ritkriti Projects26/11/2022
CC005000000177864Akanksha SharmaPranay Prakash Singhi29/11/2022
CC005000000177911Manish NairSaurabh Eknath Ghule23/12/2022
CC005000000197983Yogesh Parshuram DangeSushil Eknath Ghule24/12/2022
CC005000000197985Sandip Kalyan BhagatPranay Prakash Shingi24/12/2022
CC005000000197988Prashant Sarvottam ShelhalkarPRANAY PRAKASH SHINGI24/12/2022
CC005000000198074Rahul SahuPranay Prakash Shinghi06/12/2023
CC005000000198116Amar Singh KaithwarPranay Prakash Singhi14/01/2023
CC005000000198121Vinay KushwahaPranay Prakash Shingi16/01/2023
CC005000000198127Shrikesh Shivajirao kalePranay Prakash Shingi16/01/2023
CC005000000198151Arpit RathiPranay Prakash SInghi26/01/2023
CC005000000198152Akash BhagatPranay Prakash Singhi29/01/2023
CC005000000198160Swapnil Bhaskar NipanePRANAY PRAKASH SHINGI28/01/2023
CC005000000198177Azim Rashid ShaikhPranay Prakash Shingi01/02/2023
CC005000000198179Pankajkumar Chandulal BelaniPRANAY PRAKASH SHINGI26/01/2023
CC005000000228452Firdaus ShaikhPranay Prakash Shingi05/03/2023
CC005000000279828Ashish DeshmukhAbisky-Ritkriti Projects Keshavnagar LLP07/12/2023
CC005000000471455MANISH WAMANRAO PAWARABISKY RITKRITI PROJECTS KESHAVNAGAR09/08/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Feb 2025
Certificates of CA (Form 3)File: 30 Certificates of CA (Form 3).pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Feb 2025
Certificates of CA (Form 3)File: Form 3_Valora B_311223.pdf21 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf11 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf11 Mar 2024
Certificates of CA (Form 3)File: 28 Certificates of CA (Form 3)_organized.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf5 Mar 2024
Declaration in FORM BFile: Form B.pdf2 Mar 2024
Certificates of CA (Form 3)File: FORM - 3 - 31-12-20 - WING - B.pdf28 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31 03 23.pdf27 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate Mar23 B 11111111111111.pdf27 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B June 23.pdf27 Feb 2024
Certificates of CA (Form 3)File: Form 3 B 31 12 20 CA (2).pdf23 Feb 2024
Certificates of CA (Form 3)File: Form 3 B 31 12 22 CA (2).pdf23 Feb 2024
Certificates of CA (Form 3)File: Form 3 B 30 09 22 CA (2).pdf23 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 06 2019.pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - B - Wing.pdf16 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-12-17.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-03-20.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-03-21.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 21-12-21.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 30-06-22.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 30-09-22.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-12-22.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-03-23.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 30-06-23.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 30-09-23.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-12-23.pdf9 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B - 31-03-23.pdf9 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050418 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050118 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050119 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050419 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - B Wing - June 23.pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050719 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 051019 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050120 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050420 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050720 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 051020 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050121 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050421 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050721 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 051021 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050122 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 051022 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050123 ES (2).pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June 2023.pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sept 2023.pdf8 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B 050124 ES 01.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Engineer - 19-20 B Wing - 18-03-20.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Engineer -17-18 B Wing - 23-03-18.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Engineer - 20-21 B Wing - 23-03-21.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Engineer -21-22 B Wing - 19-03-22.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Engineer -22-23 B Wing - 20-03-23.pdf8 Feb 2024
Certificates of CA (Form 3)File: B 300917 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 311217 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 310318 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 311218 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 310319 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 311219 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 310320 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 300620 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 300920 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 311220 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 310321 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 300621 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 300921 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 311221 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 300922 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 311222 CA (2).pdf8 Feb 2024
Certificates of CA (Form 3)File: B 230124 CA 01_compressed.pdf8 Feb 2024
Layout approvalFile: Build B - VALORA LAYOUT.pdf31 Jan 2024
Copy of Layout Approval (in case of layout)File: Build B - VALORA LAYOUT.pdf31 Jan 2024
Certificates of CA (Form 3)File: Form 3- VALORA Towers B as on 30-06-2023.pdf4 Dec 2023

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VALORA TOWERS-B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmVALORA TOWERS-BCompleted 70Lapsed / revoked 18Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: ABISKY RITKRITI PROJECTS KESHAVNAGAR LLP

ABISKY RITKRITI PROJECTS KESHAVNAGAR LLP has 2 registrations on MahaRERA, including VALORA TOWERS-B and VALORA TOWERS-A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that VALORA TOWERS-B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VALORA TOWERS-B is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VALORA TOWERS-B?

The registered promoter entity is ABISKY RITKRITI PROJECTS KESHAVNAGAR LLP, an others as per the filing. Its GSTIN 27AANFG8048H1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VALORA TOWERS-B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VALORA TOWERS-B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VALORA TOWERS-B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VALORA TOWERS-B?

The professionals named in the filing: Architect: GM Architects; Engineer: Balasaheb Vishwanath Pandre; Chartered Accountant: CA NIKHIL BHUTADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VALORA TOWERS-B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VALORA TOWERS-B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VALORA TOWERS-B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.