VALENCIA RIVERSIDE APARTMENT

By VINAYAKA BUILDERS

RG-MH-15518 · RERA P51600034969 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
14 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
19 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

VALENCIA RIVERSIDE APARTMENT is a Others project by VINAYAKA BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600034969 on 28 Apr 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 6 months from the original filing. 9 of the 28 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameVALENCIA RIVERSIDE APARTMENT
  • TypeOthers
  • Location
    • Savarkar Nagar Daate Nagar
    • Gangapur Road
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600034969
  • ReraGenie IDRG-MH-15518

Builder

  • NameVINAYAKA BUILDERS
  • Entity typePartnership
  • PartnersRAJ PRAMOD SOMAIYA, KEWAL PRAMOD SOMAIYA

Key dates

1 months past promisethis monthRegisteredApr 2022First promiseMar 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2026)
  • Buildings2 building records
  • Documents filed122 files

Current status

32%9 of 28 units booked
90.0%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VALENCIA RIVERSIDE APARTMENT WING ANA1186814
VALENCIA RIVERSIDE APARTMENT WING BNA11714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

VALENCIA RIVERSIDE APARTMENT WING A87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
VALENCIA RIVERSIDE APARTMENT WING B87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38
BuildingClosed/CoveredTotal
VALENCIA RIVERSIDE APARTMENT WING A3737
VALENCIA RIVERSIDE APARTMENT WING B11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,073 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Nov 2025
LandownerVillageDistrict
VIKAS BHANUDAS BAGULNashikNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI4153.79
Proposed, not sanctioned4,154 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC AREA, TRIMBAK ROAD, NASHIK 422007
Estimated costRs 9.57 cr
Cost incurredRs 8.61 cr
Work done90.0%
BuildingWingEstimatedIncurred
VALENCIA RIVERSIDE APARTMENT WING ANARs 4.64 crRs 4.18 cr
VALENCIA RIVERSIDE APARTMENT WING BNARs 4.64 crRs 4.18 cr
-NARs 28.38 lakhRs 25.54 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SAMEER MADIYAR
EngineerAADHAR ENGINEERS
Chartered AccountantP H MEHTA & CO
Chartered AccountantHARSH M VADERA & CO
PartnerRole in project
VINAYAKA BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02052620812Mar 2026 → Sep 2026

Reason as filed by the promoterDue to procedural delay from the Competent Authority we have not received Full Occupancy Certificate, hence we would require 6 more Months to complete the project with CC from Competent Authority

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: 22-23.pdf2 May 2026
Form 2A (FY 2023-2024)File: 23-24.pdf2 May 2026
Form 2A (FY 2024-2025)File: 24-25.pdf2 May 2026
Form 2A (FY 2025-2026)File: 25-26.pdf2 May 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf2 May 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf2 May 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf2 May 2026
Form 5 (FY 2025-2026)File: Form 5 25-26.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 signed.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 signed.pdf29 Apr 2026
Withdrawal Update Form 2File: Form2 Signed.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 31122025.pdf29 Apr 2026
Withdrawal Update Form 3File: Form3 31032026.pdf29 Apr 2026
Form 1File: Form 1 30062022 reduced.pdf25 Apr 2026
Form 2File: Form 2 30062022 reduced.pdf25 Apr 2026
Form 3File: Form 3 30062022 reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 30062022.pdf25 Apr 2026
Form 1File: Form 1 30062022 reduced.pdf25 Apr 2026
Form 2File: Form 2 30062022 reduced.pdf25 Apr 2026
Form 3File: Form 3 30062022 reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 30062022.pdf25 Apr 2026
Form 1File: Form 1 31122022 reduced.pdf25 Apr 2026
Form 2File: Form 2 31122022 Reduced.pdf25 Apr 2026
Form 3File: Form 3 31122022 Reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31122022.pdf25 Apr 2026
Form 1File: Form 1 31032023 Reduced.pdf25 Apr 2026
Form 2File: Form 2 31032023 Reduced.pdf25 Apr 2026
Form 3File: Form 3 31032023 Reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31032023.pdf25 Apr 2026
Form 1File: Form 1 30062023 Reduced.pdf25 Apr 2026
Form 2File: Form 2 30062023 Reduced.pdf25 Apr 2026
Form 3File: Form 3 30062023 Reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 30062023.pdf25 Apr 2026
Form 1File: Form 1 30092023 Reduced.pdf25 Apr 2026
Form 2File: Form 2 30092023 Reduced.pdf25 Apr 2026
Form 3File: Form 3 30092023 Reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 30092023.pdf25 Apr 2026
Form 1File: Form 1 31122023 Reduced.pdf25 Apr 2026
Form 2File: Form 2 31122023 Reduced.pdf25 Apr 2026
Form 3File: Form 3 31122023 Reduced.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31122023.pdf25 Apr 2026
Form 1File: Form 1 31032024.pdf25 Apr 2026
Form 2File: Form 2 31032024.pdf25 Apr 2026
Form 3File: Form 3 31032024.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31032024.pdf25 Apr 2026
Form 1File: Form 1 30062024.pdf25 Apr 2026
Form 2File: Form 2 30062024.pdf25 Apr 2026
Form 3File: Form 3 - 30062024.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 30062024.pdf25 Apr 2026
Form 1File: Form 1 - 30092024.pdf25 Apr 2026
Form 2File: Form 2 - 30092024.pdf25 Apr 2026
Form 3File: Form 3 - 30092024.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 30092024.pdf25 Apr 2026
Form 1File: Form 1 31122024.pdf25 Apr 2026
Form 2File: Form 2 31122024.pdf25 Apr 2026
Form 3File: Form 3 - 31122024.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31122024.pdf25 Apr 2026
Form 1File: 31032025 Form 1 Signed.pdf30 Dec 2025
Form 2File: Withdrawal Application Form2 - 31032025.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31032025.pdf30 Dec 2025
Form 3File: Withdrawal Application Form3 - 31032025.pdf30 Dec 2025
Withdrawal Update Form 1File: 30062025 Form 1 Signed.pdf30 Dec 2025
Withdrawal Update Form 1File: 30092025 Form 1 Signed.pdf30 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 - 30062025.pdf30 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 - 30092025.pdf30 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 - 30062025.pdf30 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 - 30092025.pdf30 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 31032024.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 30062024.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 30092024.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Form 1 31122024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form 3 - 31032024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 - 30062024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form 3 - 30092024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 Form 3 - 31122024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 31032024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 30062024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 30092024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 31122024.pdf24 Feb 2025

How this compares with Nashik

32%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 6 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VALENCIA RIVERSIDE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gangapur Road4,100+ in Nashik

2 kmVALENCIA RIVERSIDE APARTCompleted 48Lapsed / revoked 20Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 121 registered projects within 2 km.

Builder: VINAYAKA BUILDERS

VINAYAKA BUILDERS has 1 registration on MahaRERA, including VALENCIA RIVERSIDE APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if VALENCIA RIVERSIDE APARTMENT is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VALENCIA RIVERSIDE APARTMENT?

The registered promoter entity is VINAYAKA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VALENCIA RIVERSIDE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VALENCIA RIVERSIDE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VALENCIA RIVERSIDE APARTMENT?

The professionals named in the filing: Architect: AR SAMEER MADIYAR; Engineer: AADHAR ENGINEERS; Chartered Accountant: P H MEHTA & CO; Chartered Accountant: HARSH M VADERA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VALENCIA RIVERSIDE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VALENCIA RIVERSIDE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VALENCIA RIVERSIDE APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.