ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Vaishno Neelkanth Apartment

Registration lapsed No litigation declared Residential / Group Housing project

Vaishno Neelkanth Apartment

By Shree Vaishno Homes Pvt. ltd.

RG-MH-93782 · RERA P51800051076 · Last updated on MahaRERA portal: 18 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
2 of 11Construction stages donefurthest along: Basement (if any), 95%
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

Vaishno Neelkanth Apartment is a Residential / Group Housing project by Shree Vaishno Homes Pvt. ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051076 on 22 May 2023. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameVaishno Neelkanth Apartment
  • TypeResidential / Group Housing
  • Location
    • Rani Sati Marg
    • Malad - East
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051076
  • ReraGenie IDRG-MH-93782

Builder

  • NameShree Vaishno Homes Pvt. ltd.
  • Entity typeCompany
  • DirectorsNISHANT MANOJ SINGH, ANKUR VINOD SINGH, MANOJKUMAR LALCHAND SINGH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

16 months past promisethis monthRegisteredMay 2023First promiseDec 2024Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 May 2023
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vaishno Neelkanth ApartmentNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

Vaishno Neelkanth Apartment: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered31
Open Space10

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area928 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Shree Vaishno Homes Private LimitedMaladMumbai Suburban
Quarry Road Co- operative Societies LimitedMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1158.72
Proposed, not sanctioned1,159 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUpper Govind Nagar , Malad - East, Mumbai - 400097

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNiten Premchand Dedhia
EngineerNeel N Dholia
Chartered AccountantNilesh B Patel
PartnerRole in project
Shree Vaishno Homes Pvt. ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025593Dec 2024 → Jun 2025

Reason as filed by the promoterWe, the promoters of the Vaishno Neelkanth Apartment project, registered under MahaRERA with registration number P51800051076, hereby submit this explanatory note seeking an extension of the completion deadline for our project until June 2025. Status of Project Completion: We have already received a Full Occupancy Certificate for Wing A and Partial Occupancy Certificate for Wing B on 16th December 2024 for the following components: 1. Wing- ‘A’ Ground (pt.) for Shops + Stilt (pt.) for Pit & Stack Parking + 1st for Office + 2nd to 9th upper Residential floors (Full Occupancy) 2. Wing- ‘B’ Stilt

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Dec 2024

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf16 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 9597 OC_signed.pdf17 Dec 2024
Declaration in FORM BFile: Affidavit Cum Declaration.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 0924.pdf14 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 September 2024.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf14 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf13 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Vaishno Homes Pvt Ltd.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf2 Feb 2024
Layout approvalFile: Drawing (1).pdf25 Jan 2024
Copy of Layout Approval (in case of layout)File: Drawing (1).pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC signed.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf25 Jan 2024
Other - FinanceFile: Form 3.pdf2 May 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (2).pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (2).pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Quarrry Road Architect Certificate.pdf18 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quarrry Road Engineer Certificate.pdf18 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex Nishant Singh.pdf20 Mar 2023
Building plan approvalFile: IOD.pdf15 Mar 2023
PAN CardFile: Pan.pdf15 Mar 2023
Copy of the legal title reportFile: Legal Title Report (1).pdf15 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf15 Mar 2023
Declaration about Commencement CertificateFile: Declaration About CC.pdf15 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vaishno Neelkanth Apartment Form 3 Scan Copy (1).pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf15 Mar 2023
Details of encumbrances concerned to FinanceFile: Declaration about encumberance.pdf14 Mar 2023
Details of encumbrances concerned to LegalFile: Declaration about encumberance.pdf14 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Mar 2023
Declaration in FORM BFile: Form B Developer.pdf14 Mar 2023
CERSAI detailsFile: CERSAI Search Report.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf14 Mar 2023
Proforma of Allotment letterFile: Allotment Letter Format.pdf14 Mar 2023
Proforma of Agreement for saleFile: Vaishno Neelkant Rera Agreement Draft (1).pdf14 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf14 Mar 2023
Deviation Report with respect to Allotment letterFile: Declartion model allotment.pdf14 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Declaration Model Agreement.pdf14 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE GANESH VAISHNO DEVELOPERSSia Apartment Mantri Wadi Malad West Mumbai 40006452CompletedDec 2017Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vaishno Neelkanth Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad - East6,700+ in Mumbai Suburban

2 kmVaishno Neelkanth ApartmCompleted 106Lapsed / revoked 70Other 131Dot size: filed unitsN

Filed coordinates, straight-line distance. 307 registered projects within 2 km.

Builder: Shree Vaishno Homes Pvt. ltd.

Shree Vaishno Homes Pvt. ltd. has 2 registrations on MahaRERA, including Vaishno Neelkanth Apartment and Vaishno Sky. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Vaishno Neelkanth Apartment shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vaishno Neelkanth Apartment is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vaishno Neelkanth Apartment?

The registered promoter entity is Shree Vaishno Homes Pvt. ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vaishno Neelkanth Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vaishno Neelkanth Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vaishno Neelkanth Apartment?

The professionals named in the filing: Architect: Niten Premchand Dedhia; Engineer: Neel N Dholia; Chartered Accountant: Nilesh B Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vaishno Neelkanth Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vaishno Neelkanth Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vaishno Neelkanth Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.