Home / Browse projects / Mumbai Suburban, Maharashtra / Vaikunth Dham CHS Ltd

Registration lapsed No litigation declared Residential / Group Housing project

Vaikunth Dham CHS Ltd

By Shivshankar Singh & Others

RG-MH-24398 · RERA P51800006275 · Last updated on MahaRERA portal: 24 Feb 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
59 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 166 documents Report an error

Vaikunth Dham CHS Ltd is a Residential / Group Housing project by Shivshankar Singh & Others in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006275 on 14 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date.

At a glance

Project

  • NameVaikunth Dham CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006275
  • ReraGenie IDRG-MH-24398

Builder

  • NameShivshankar Singh & Others
  • Entity typeOthers
  • GSTIN27AAAAS5080P1ZZ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • MembersShardadevi Shivram Singh Singh, Randhir Shivram Singh Singh, Sachin Shivram Singh Singh, Shivshankar Shivram Singh Singh
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live3 lapsed, de-registered or revoked

Key dates

46 months past promisethis monthRegisteredAug 2017PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings7 building records
  • Documents filed166 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA200000
WING BNA200000
WING CNA210000
WING D - SRANA150000
WING ENA130000
WING FNA130000
Building No 2 Rehab WingNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 24 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

59 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 95%.

Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
WING C87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WING D - SRA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 2 Rehab Wing73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75
BuildingClosed/CoveredTotal
Wing A2525
WING B2121
WING C2424
Building No 2 Rehab Wing55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,199 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15251.45
Proposed, not sanctioned14,715 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJ M Road Bhandup west

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhavsar Consultants
PartnerRole in project
Shivshankar Singh & Others-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Sep 2021

Documents filed166

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1.pdf24 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (1).pdf13 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sachdev.pdf11 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate- Sachdev colmplex.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2- A Sachdev Complex.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Discloser of sold A - Wing.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Discloser of sold B -wing.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Discloser of sold C -wing.pdf13 Feb 2023
CERSAI detailsFile: SHIVSHANKAR CERSAI.pdf21 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SACHDEV COMPLEX FORM 5.pdf4 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SACHDEV COMPLEX FORM 5.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SACHDEV ENGINEER CERTIFICATE.pdf29 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SACHDEV ENGINEER CERTIFICATE.pdf29 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SACHDEV ENGINEER CERTIFICATE.pdf29 Sep 2021
Certificates of CA (Form 3)File: FORM 3 SACHDEV COMPLEX.pdf29 Sep 2021
Certificates of CA (Form 3)File: FORM 3 SACHDEV COMPLEX.pdf29 Sep 2021
Certificates of CA (Form 3)File: FORM 3 SACHDEV COMPLEX.pdf29 Sep 2021
Declaration about Commencement CertificateFile: Form D Declaration of CC Sachdev Complex.pdf23 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Quality Assurance Certificate Sachdev.pdf23 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance Certificate Sachdev.pdf23 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC COPY SACHDEV.pdf14 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Unsold Inventory Sachdev Wing A.pdf14 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Unsold Inventory Sachdev Wing B.pdf14 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Unsold Inventory Sachdev Wing C.pdf14 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sachdev Complex.pdf1 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf1 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf1 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf7 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE.pdf7 Oct 2019
Certificates of CA (Form 3)File: FORM 3.pdf7 Oct 2019
Certificates of CA (Form 5)File: Form 5 Vaikunth Dham Chs Ltd.pdf8 Oct 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration of Society Vaikunth Dham CHS.pdf16 May 2018
Status of ConveyanceFile: Declaration of Conveyance Vaikunth Dham CHS.pdf16 May 2018
Building plan approvalFile: Building Plan Approval (IOD).pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 7.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 8.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 9.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 10.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 11.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 12.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 13.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 14.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 15.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 16.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 17.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 18.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 2.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 3.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 4.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 5.pdf26 Apr 2018
Building plan approvalFile: Building Plan Approval (IOD) 6.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD).pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 2.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 3.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 4.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 5.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 6.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 7.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 8.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 9.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 10.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 11.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 12.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 13.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 14.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 15.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 16.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 17.pdf26 Apr 2018
Building Plan Approval (IOD)File: Building Plan Approval (IOD) 18.pdf26 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf26 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate of Sachdev Complex.pdf26 Apr 2018
Certificates of CA (Form 5)File: C A Certificate Sachdev Complex.pdf26 Apr 2018
OtherFile: annexure-F--pr-card-cts-164-1-to-7-1-5 other.pdf26 Apr 2018
OtherFile: annexure-F--pr-card-cts-164-1-to-7-6-10 other.pdf26 Apr 2018
OtherFile: annexure-F--pr-card-cts-164-1-to-7-11-15 other.pdf26 Apr 2018
OtherFile: Intimation of Approval-164-1-2.pdf26 Apr 2018
OtherFile: Intimation of Approval-164-3-4.pdf26 Apr 2018
OtherFile: Intimation of Approval-164-5-6.pdf26 Apr 2018
OtherFile: Intimation of Approval-164-7-9.pdf26 Apr 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vaikunth Dham CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmVaikunth Dham CHS LtdCompleted 56Lapsed / revoked 27Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 163 registered projects within 2 km.

Builder: Shivshankar Singh & Others

Shivshankar Singh & Others has 5 registrations on MahaRERA, including Gaodevi Krupa Darshan SRA CHS Ltd and Vaikunth Dham CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Vaikunth Dham CHS Ltd shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vaikunth Dham CHS Ltd is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vaikunth Dham CHS Ltd?

The registered promoter entity is Shivshankar Singh & Others, an others as per the filing. Its GSTIN 27AAAAS5080P1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vaikunth Dham CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vaikunth Dham CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vaikunth Dham CHS Ltd?

The professionals named in the filing: Architect: Bhavsar Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vaikunth Dham CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vaikunth Dham CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vaikunth Dham CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.