Home / Browse projects / Raigarh, Maharashtra / VAASTU SANKALP

Registered No litigation declared Residential / Group Housing project

VAASTU SANKALP

By VAASTU ENTEPRISES

RG-MH-28780 · RERA P52000026957 · Last updated on MahaRERA portal: 22 Nov 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 30 months from the original
10 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 95%
51 of 97Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

VAASTU SANKALP is a Residential / Group Housing project by VAASTU ENTEPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000026957 on 7 Nov 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing. 46 of the 97 units on this registration are recorded sold or booked, and 10 of 33 construction stages are filed complete.

At a glance

Project

  • NameVAASTU SANKALP
  • TypeResidential / Group Housing
  • Location
    • PASHANE ROAD
    • AT PASHANE
    • Pashane
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000026957
  • ReraGenie IDRG-MH-28780

Builder

  • NameVAASTU ENTEPRISES
  • Entity typePartnership
  • PartnersBHASKAR ARUNKUMAR NIMBALKAR, DEVENDRA CHANDRAKANT GHUBE, MONIKA BHASKAR NIMBALKAR, NILESH GANGARAM BHOIR, VINOD JANARDAN GAIKAR, MANISHA VINOD GAIKAR, YASHODA SHAMRAO PAWAR, PRASHANT HASHA VAGE, ABHIJEET TULSHIRAM BHOIR

Key dates

this monthRegisteredNov 2020First promiseJun 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2024)
  • Buildings3 building records
  • Documents filed24 files

Current status

47%46 of 97 units booked

Figures as on 22 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA55241034
WING BNA5524529
WING CNA55241034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.

WING A70%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
WING B78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
WING C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
WING A11
WING B11

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2024
LandownerVillageDistrict
ASHOK SADANAND FARADVangani (CT)Thane
SANJAY SADANAND FARADVangani (CT)Thane
RAKESH NAMDEO FARADVangani (CT)Thane
SUJATA SANJAY FARADVangani (CT)Thane

Approvals and building plan

Sanctioning authorityThane
Permissible FSI2509.43
Proposed, not sanctioned2,509 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLR 10,11,12,15,16, ADJ TO SAGAR HOTEL, KALYAN SHIL ROAD, DOMBIVLI

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA AND K ASSOCIATES
EngineerATUL KURTADKAR AND ASSOCIATES
EngineerA
Chartered AccountantMAYUR SHINDE AND ASSOCIATES
Chartered AccountantMayur Gurunath Shinde
PartnerRole in project
VAASTU ENTEPRISES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024655Jun 2024 → Jun 2025

Reason as filed by the promoterWe declare that original proposed date of completion of the project was 30th June, 2024. However, due to the pandemic of Covid-19 causing lock down, real estate market in our area got heavily affected causing an increased constructions cost, non-availability of material and skilled labour which resulted in slowing down the construction progress. Also, it adversely affected the sales. As a result, we are not able to complete the project within proposed completion date and hence we are hereby extending the proposed date of completion to 29th June, 2025.

EA22112518408Jun 2024 → Dec 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project. The major portion of the work has been completed, including structural slabs as well as internal and external plastering. Only minor works such as flooring, sanitary fittings, and electrical fittings are pending. We are actively working to complete these remaining items at the earliest. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-12-2026, to complete the project and fulfil all regulatory requirements.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf22 Nov 2025
Withdrawal Update Form 2File: Form 2_compressed.pdf22 Nov 2025
Withdrawal Update Form 3File: 1_2_3_4_5_6_7_merged.pdf22 Nov 2025
Declaration in FORM BFile: DecB_compressed.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2)_compressed.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_2_3_4_5_6_7_merged.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf17 Oct 2024
OtherFile: FormE_compressed.pdf17 Oct 2024
OtherFile: Format-B_compressed.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A_compressed.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QAC-Q1-Vaastu Enterprises.pdf16 Oct 2021
OtherFile: SRO membership.pdf2 Nov 2020
Building plan approvalFile: Plan final 1.pdf30 Oct 2020
Layout approvalFile: Plan final 1.pdf30 Oct 2020
Copy of Layout Approval (in case of layout)File: Plan final 1.pdf30 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Plan final 1.pdf30 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert.pdf30 Oct 2020
PAN CardFile: VAASTU ENTERPRISES PAN.pdf29 Oct 2020
Copy of the legal title reportFile: Search Title_compressed.pdf29 Oct 2020
Details of encumbrancesFile: No Encumbrances signed.pdf29 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised CC_compressed.pdf29 Oct 2020
Declaration in FORM BFile: Ann B Notary_compressed.pdf29 Oct 2020
Proforma of Allotment letterFile: sample pashane nimbalkar PDF.pdf29 Oct 2020

How this compares with Raigarh

47%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 30 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VAASTU SANKALP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AT PASHANE5,900+ in Raigarh

2 kmVAASTU SANKALPCompleted 7Lapsed / revoked 14Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: VAASTU ENTEPRISES

VAASTU ENTEPRISES has 1 registration on MahaRERA, including VAASTU SANKALP. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if VAASTU SANKALP is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VAASTU SANKALP?

The registered promoter entity is VAASTU ENTEPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VAASTU SANKALP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VAASTU SANKALP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VAASTU SANKALP?

The professionals named in the filing: Architect: A AND K ASSOCIATES; Engineer: ATUL KURTADKAR AND ASSOCIATES; Engineer: A; Chartered Accountant: MAYUR SHINDE AND ASSOCIATES; Chartered Accountant: Mayur Gurunath Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VAASTU SANKALP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VAASTU SANKALP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VAASTU SANKALP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.