V Axis
RG-MH-22076 · RERA P52100030180 · Last updated on MahaRERA portal: 26 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
- Rs 15.00 crore secured on the land, in favour of Anand rathi global finance limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
V Axis is a Others project by Vikas Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100030180 on 5 Aug 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 111 of the 133 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameV Axis
- TypeOthers
- Location
- Ivy Estate Road
- Wagholi
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100030180
- ReraGenie IDRG-MH-22076
Builder
- NameVikas Buildcon
- Entity typePartnership
- PartnersAvinash Nandkishor Kale, Nilima Ganesh Thalur, Mukta Sahebrav Bhadale, Pratibha Avinash Kale, Narhari Rambhau Gavhane, Shantanu Sanjay Galande
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Aug 2021
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed142 files
Current status
Figures as on 26 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 9 | 9 | 71 | 9 | 80 |
| B Wing | NA | 5 | 5 | 0 | 53 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 85%.
A Wing58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
B Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 55% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 55% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 40% |
| Community Buildings | Yes | 20% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed859
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Wing | 80 | 387 | 467 |
| B Wing | 84 | 308 | 392 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Vikas Buildcon | WAGHOLI | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Wing | NA | Rs 18.22 cr | Rs 9.99 cr |
| B Wing | NA | Rs 15.00 cr | Rs 14.76 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashish Barat & Associates |
| Engineer | Tejas Bhosure |
| Chartered Accountant | SAC & CO LLP |
| Chartered Accountant | Shah Khandelwal Jain and Associates |
| Partner | Role in project |
|---|---|
| Vikas Buildcon | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have obtained a single RERA number for both Wing A and Wing B. Wing B, which is the commercial wing, has now been completed. Work on Wing A, which is the residential wing, has commenced and will require approximately two more years to be completed. Therefore, we are extending the RERA completion date to 31.12.2027. This extension will ensure adequate time to complete all construction activities and compliance procedures as per RERA requirements.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed142
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: From 1 31032026_compressed.pdf | 26 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 30062026_compressed.pdf | 26 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 31032026_compressed.pdf | 26 Aug 2026 |
| Withdrawal Update Form 2File: form 2 30062026_compressed.pdf | 26 Aug 2026 |
| Withdrawal Update Form 3File: Vikas Buildcon Form 3 31032026 signcompressed_compressed.pdf | 26 Aug 2026 |
| Withdrawal Update Form 3File: Vikas Buildcon Form 3 30 06 2026 sign_compressed.pdf | 26 Aug 2026 |
| Form 2A (FY 2025-2026)File: From 2A_compressed 2025-2026.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: form 1_compressed.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: form 2 sign_compressed.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Vikas Buildcon Form 3 31122025 sign_final.pdf | 30 Jan 2026 |
| Form 2A (FY 2024-2025)File: sign from 2_compressed.pdf | 6 Dec 2025 |
| Form 5 (FY 2024-2025)File: Vikas Buildcon-sign copy_compressed.pdf | 6 Dec 2025 |
| Withdrawal Update Form 1File: form 1_compressed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: form 1_compressed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate_compressed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Engineeru0027s Certificate 2_compressed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 30062025_compressed.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Vikas Buildcon Form 3 30092025 sign_compressed.pdf | 18 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2025.pdf | 23 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2025_compressed.pdf | 23 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 30062025_compressed.pdf | 23 Jul 2025 |
| CERSAI detailsFile: Cersai report.pdf | 23 Jul 2025 |
| Other - TechnicalFile: Annexure A notarised and stamp.pdf | 23 Jul 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: End Use Certificate.pdf | 23 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 3 Jun 2025 |
| Other - FinanceFile: Vikas Buildcon Secured Unsecured Certificate.pdf | 3 Jun 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B on Bank Letter head_new-ok.pdf | 3 Jun 2025 |
| Building plan approvalFile: 1_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 1_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 2_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 3_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 4_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 5_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 6.pdf | 17 May 2025 |
| Building plan approvalFile: 8_compressed.pdf | 17 May 2025 |
| Building plan approvalFile: 9.pdf | 17 May 2025 |
| Building plan approvalFile: 10.pdf | 17 May 2025 |
| Building plan approvalFile: C C 2502_2025_144dpi.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 8_compressed.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 9.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 17 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: C C 2502_2025_144dpi.pdf | 17 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vikas Buildcon 31032025 sign_compressed.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VAXIS Eng certificate 31032025.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032025 (on Letterhead).pdf | 28 Apr 2025 |
| Declaration about Commencement CertificateFile: Format D Commencement certificate declaration (Print on Letterhead).pdf | 28 Apr 2025 |
| CERSAI detailsFile: Undertaking CERSAI (Letter head).pdf | 28 Apr 2025 |
| Other - TechnicalFile: Annexure A (Print on Legal Page and Notery).PDF | 28 Apr 2025 |
| Declaration in FORM BFile: form B stamp paper to be notarised.PDF | 25 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: C C 2502_2025_144dpi.pdf | 25 Apr 2025 |
| Other - LegalFile: Annexure A (Print on Legal Page and Notery).PDF | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032025 (on Letterhead).pdf | 25 Apr 2025 |
| CERSAI detailsFile: Undertaking CERSAI (Letter head).pdf | 25 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Vikas Buildcon Secured Unsecured Certificate.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Status-Architect certificate-RERA 31122024.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-31122025-sign copy_compressed.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3112 2024.pdf | 12 Feb 2025 |
| Details of encumbrancesFile: Encumbrance Certificate As Finance sign_compress.pdf | 17 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Separate Bank Account sign_compress.pdf | 17 Dec 2024 |
| Other - TechnicalFile: Declaration Cum Undertaking with attached bank statement_compress.pdf | 17 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B on Bank Letter head_new.pdf | 17 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: New Format B Disclosure for Secured Unsecured Finance sign_compress.pdf | 17 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A F Y 23-24_compressed.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 202324 -Vikas Buildcon.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 V Axis 30-06-2024-sign copy_compressed.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 V Axis 30-09-2024 sign_compressed.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Status-Architect certificate-RERA 30092024.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sep 24_compressed.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect certificate - 30092023.pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Status-Architect certificate-RERA 30062024.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2_compressed.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 V Axis 31-03-2024-signed copy-compressed.pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Status-Architect certificate-RERA 31032024.pdf | 17 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 142 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep V Axis on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wagholi13,700+ in Pune
Filed coordinates, straight-line distance. 142 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: Vikas Buildcon
Vikas Buildcon has 1 registration on MahaRERA, including V Axis. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if V Axis is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of V Axis?
The registered promoter entity is Vikas Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in V Axis?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for V Axis?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at V Axis?
The professionals named in the filing: Architect: Ashish Barat & Associates; Engineer: Tejas Bhosure; Chartered Accountant: SAC & CO LLP; Chartered Accountant: Shah Khandelwal Jain and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in V Axis?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback