Home / Browse projects / Pune, Maharashtra / UTSAV BUSINESS CENTER

Registration lapsed No litigation declared Commercial project

UTSAV BUSINESS CENTER

By ROYAL DEVELOPERS

RG-MH-78580 · RERA P52100018719 · Last updated on MahaRERA portal: 26 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 75%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

UTSAV BUSINESS CENTER is a Commercial project by ROYAL DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100018719 on 28 Nov 2018. Possession was promised by 30 Mar 2024 and is now 31 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameUTSAV BUSINESS CENTER
  • TypeCommercial
  • Location
    • AWALAWADI ROAD
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100018719
  • ReraGenie IDRG-MH-78580

Builder

  • NameROYAL DEVELOPERS
  • Entity typePartnership
  • PartnersZENITH LANDMARKS PVT LTD, PRAVIN BANSILAL RAISONI, KUNNANPARTH ABDUL RAMEES, SURENDRA BAPUSAHEB PATHARE, PIYUSH PRAVIN RAISONI, DEEPALI RAHUL GAVHANE, VARSHA MAHESH KARPE, JYOTI RAVINDRA BHUJABAL, SANKET SAMPAT KHARPUDE
  • Other registrations16 more →
  • Completed5 of 17
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

31 months past promisethis monthRegisteredNov 2018First promiseMar 2022Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Nov 2018
  • Promised completion30 Mar 2024
  • Revised completionRevised to 30 Mar 2024 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UTSAV BUSINESS CENTRENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

UTSAV BUSINESS CENTRE: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Open Space117

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,389 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SANGITA RAMDAS SATAVWAGHOLIPune
RAMESH RAMDAS SATAVWAGHOLIPune
AMOL RAMDAS SATAVWAGHOLIPune

Approvals and building plan

Permissible FSI1388.6
Proposed, not sanctioned1,389 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHARADI, PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARVEZ JAMADAR & ASSOCIATES
EngineerR K RANDHAVE CONSULTANT
PartnerRole in project
ROYAL DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011592Mar 2022 → Mar 2023

Reason as filed by the promoterDUE TO PANDEMIC SITUATION LABOUR ,MATERIAL PROBLEMS BECOMES HURDLE AND ALSO NEW BOOKINGS NOT DONE THATS WHY CASH FLOW ALSO HAMPERED THE SPEED OF WORK.

EXT52100015141Mar 2022 → Mar 2024

Reason as filed by the promoterREVISED PLAN SUBMITED TO PMRDA FOR SANCTIONING. AND ALSO REQUIRED LATEST MOJNI CERTIFICATE FROM GOVT. AGENCY, IT'S TAKE TOO MUCH TIME AND THEN ONLY FILE WILL BE SUBMITTED FOR COMPLETION.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Nov 2024

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: UTSAV BUSINESS CENTER FORM 4 ,.pdf26 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: UTSAV Business Center Completion Certificate.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate 29022024 Business Center.pdf18 Jun 2024
Certificates of CA (Form 3)File: Form 3 Business Center 29022024.pdf18 Jun 2024
Declaration in FORM BFile: FROM 3 AMINITY .pdf11 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 BC Royal Developers FY 22-23.pdf12 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Business Center 30092022.pdf15 Feb 2023
Certificates of CA (Form 3)File: CA Certificate Utsav Business Center 30092022.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: UTSAV Business Center Form 5 21-22.pdf29 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Business Center 31032022.pdf30 Jul 2022
Disclosure of sold/ booked inventoryFile: Circular 29 Business Center 31032022.pdf30 Jul 2022
Certificates of CA (Form 3)File: Form 3 Business Center 31032022.pdf30 Jul 2022
Declaration about Commencement CertificateFile: Circular_32_Declaration.pdf31 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Amenity_form-1_Architect_sign.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality_Assurance_2022.pdf31 Mar 2022
CERSAI detailsFile: Undertaking_non_Application_2022.pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Inventory_2022.pdf31 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate 31032021 Business Center.pdf21 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- Busines Amenity Center FY 2020-21.pdf21 Feb 2022
Declaration about Commencement CertificateFile: Amenity_Circular_32.pdf4 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Business Center.pdf14 Aug 2021
Certificates of CA (Form 3)File: UTSAV BUSINESS CENTRE ( FORM-3) 20032021.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Utsav Business Center Engineer Certificate 31032020.pdf17 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Utsav Business Centre 19-20.pdf17 May 2021
Certificates of CA (Form 3)File: Utsav Business Center 20032020.pdf10 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: COMMERCIAL_ENGINEER_CERTIFICATE_10th_March.pdf15 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AMENITY_ENGINEER_CERTIFICATE.pdf11 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: commercial.pdf7 Jul 2020
Details of Restarting of Construction work post lockdownFile: Utsav BC.pdf7 Jul 2020
Certificates of CA (Form 3)File: Form 3 Royal Utsav Business Center 31122019.pdf4 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Business Center FY 18-19.pdf4 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng_certificate_com.pdf3 Feb 2020
Form 2AFile: quality_comm.pdf3 Feb 2020
Certificates of CA (Form 3)File: FORM 3 ROYAL BUSINESS CENTRE SIGNED.pdf11 Jun 2019
Form 2AFile: ENGINEER_CERTIFICATE_FORM_2A_COMMERCIAL.pdf8 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA_engineer_certificate_commercial.pdf11 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf21 Nov 2018
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf21 Nov 2018
Details of encumbrancesFile: NO ENCUMBRANCE REPORT.pdf19 Nov 2018
Proforma of Allotment letterFile: AMENITY-SPACE_Agreement_Draft_Utsav.pdf19 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Arch Certificate Amenity.pdf30 Oct 2018
Declaration in FORM BFile: Rahul_Gavhane_B-Form_5982__1_.pdf25 Oct 2018
Layout approvalFile: 1111.pdf24 Oct 2018
Building plan approvalFile: 3.pdf24 Oct 2018
Building plan approvalFile: 4.pdf24 Oct 2018
Building plan approvalFile: 1111.pdf24 Oct 2018
PAN CardFile: Royal Pan Card.pdf24 Oct 2018
Copy of the legal title reportFile: Title_report.pdf24 Oct 2018
Copy of the legal title reportFile: Search_report__1_.pdf24 Oct 2018
Copy of Layout Approval (in case of layout)File: 1111.pdf24 Oct 2018
Building Plan Approval (IOD)File: 3.pdf24 Oct 2018
Building Plan Approval (IOD)File: 4.pdf24 Oct 2018
Building Plan Approval (IOD)File: 1111.pdf24 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Amenity Commencement Certificate.pdf24 Oct 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
UTSAV RESIDENCYGAT NO 1127 AVHALVADI ROAD WAGHOLI PUNE174CompletedJun 2019Apr 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UTSAV BUSINESS CENTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

Builder: ROYAL DEVELOPERS

ROYAL DEVELOPERS has 17 registrations on MahaRERA, including UTSAV RESIDENCY and Gurukripa Appartment. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that UTSAV BUSINESS CENTER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if UTSAV BUSINESS CENTER is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UTSAV BUSINESS CENTER?

The registered promoter entity is ROYAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UTSAV BUSINESS CENTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UTSAV BUSINESS CENTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UTSAV BUSINESS CENTER?

The professionals named in the filing: Architect: PARVEZ JAMADAR & ASSOCIATES; Engineer: R K RANDHAVE CONSULTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UTSAV BUSINESS CENTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UTSAV BUSINESS CENTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UTSAV BUSINESS CENTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.