Home / Browse projects / Mumbai Suburban, Maharashtra / Uptown Wing B

Registration lapsed No litigation declared Residential / Group Housing project

Uptown Wing B

By RUCHI PRIYA DEVELOPERS PRIVATE LIMITED

RG-MH-24384 · RERA P51800006008 · Last updated on MahaRERA portal: 11 Oct 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 12 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
12Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

Uptown Wing B is a Residential / Group Housing project by RUCHI PRIYA DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006008 on 14 Aug 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 12 complaints are on record with the regulator.

At a glance

Project

  • NameUptown Wing B
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006008
  • ReraGenie IDRG-MH-24384

Builder

  • NameRUCHI PRIYA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredAug 2017PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Oct 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Wing B: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Oct 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,733 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8124.06
Proposed, not sanctioned8,124 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHarbajjan Building CST Road Kalina

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGrit Architecural Consultancy Pvt Ltd
PartnerRole in project
RUCHI PRIYA DEVELOPERS PRIVATE LIMITED-

Litigation declared2

CaseCourtStatus
1269/2017High Court MumbaiPending
PIL104/2013High Court MumbaiPending

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000000246SHAMALA SURESH BAHETIruchi priya developers private limited02/10/2017
CC006000000012019SUDHIR RAGHUNATH MARATHERUCHI PRIYA DEVELOPERS PVT. LTD.25/09/2018
CC006000000055835MRS SHAMALA SURESH BAHETIRUCHI PRIYA DEVELOPERS PRIVATE LIMITED04/09/2018
CC006000000054774KETAN PATELM/S. RUCHI PRIYA DEVELOPERS PVT. LTD.16/08/2018
CC006000000171544Mr. Satyen K. Pandey and Mrs. Seema S. PandeyRuchi Priya Developers Pvt Ltd.14/11/2019
CC006000000055837RAMESHWAR KASHINATH SANKHEM/S. RUCHI PRIYA DEVELOPERS PVT. LTD.17/08/2018
CC006000000055889SHIVRAM RANGE GOWDARuchi Priya Developers Pvt Ltd23/08/2018
CC006000000056942MR. VIKAS VISHNU NARSALERUCHI PRIYA DEVELOPERS PVT. LTD.17/11/2018
CC006000000057104VENKITARAMAN RAMANANPRIYANK KIRAN HEMANI04/12/2018
CC006000000194236MR PANKAJ AND MRS YOGITA THORATRUCHI-PRIYA DEVELOPERS PRIVATE LIMITED12/10/2020
CC006000000303713Vishal Lalit ParekhM/s Ruchi Priya Developers Pvt Ltd18/12/2022
CC006000000303706Sanjaykumar NavinchandraM/s. Ruchi Priya Developers Pvt. Ltd.,17/12/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5)File: RPDPL-FORM-V-WING-B-O.pdf11 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Declaration_B.pdf7 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Uptown_wingB_Arch_Q3.pdf23 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Uptown_wingB_Rehab_Eng_Q3.pdf23 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Uptown_wingB_Sale_Eng_Q3.pdf23 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate-Uptown Wing-B.pdf30 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Uptown Wing-B.pdf30 Dec 2017
Certificates of CA (Form 3)File: UPTOWN-C RERA CERTIFICATE.pdf30 Dec 2017
Building plan approvalFile: IOD sale bldg letter.PDF29 Jul 2017
Layout approvalFile: Copy of layout dwg.pdf29 Jul 2017
Layout approvalFile: Copy of Layout approval.pdf29 Jul 2017
Copy of the legal title reportFile: Declaration For TC.pdf29 Jul 2017
Details of encumbrancesFile: Details Of Encumbrances 50CR.pdf29 Jul 2017
Details of encumbrancesFile: Details Of Encumbrances 100CR.PDF29 Jul 2017
Details of encumbrancesFile: Encumbrances list.pdf29 Jul 2017
Details of encumbrancesFile: Order PIL.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of Layout approval.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy of layout dwg.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD sale bldg letter.PDF29 Jul 2017
Declaration in FORM BFile: Decleration in Form B Wing-B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Copy of Arch Certificate-Wing-B.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate B wing.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE UPTOWN B WING.pdf29 Jul 2017
Proforma of Allotment letterFile: Declaration - MOFA.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Uptown Wing B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmUptown Wing BCompleted 136Lapsed / revoked 74Other 181Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: RUCHI PRIYA DEVELOPERS PRIVATE LIMITED

RUCHI PRIYA DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including Uptown Wing C and Uptown Wing B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Uptown Wing B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Uptown Wing B is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Uptown Wing B?

The registered promoter entity is RUCHI PRIYA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Uptown Wing B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Uptown Wing B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Uptown Wing B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Uptown Wing B?

The professionals named in the filing: Architect: Grit Architecural Consultancy Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Uptown Wing B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Uptown Wing B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Uptown Wing B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.