Upper Thane Treetops A - C, C1, C2, D - F

By MACROTECH DEVELOPERS LIMITED

RG-MH-20315 · RERA P51700008449 · Last updated on MahaRERA portal: 16 May 2024

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2022Possession promisedregistration recorded completed
72 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 0%
7Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Upper Thane Treetops A - C, C1, C2, D - F is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700008449 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2022. 7 complaints are on record with the regulator.

At a glance

Project

  • NameUpper Thane Treetops A - C, C1, C2, D - F
  • TypeResidential / Group Housing
  • Location
    • .
    • Surai
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008449
  • ReraGenie IDRG-MH-20315

Builder

  • NameMACROTECH DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonsRAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA and 1 more
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017PromisedSep 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion30 Sep 2022
  • Revised completionNone
  • Buildings8 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TREETOPS ANA190000
TREETOPS BNA190000
TREETOPS CNA190000
TREETOPS DNA190000
TREETOPS FNA190000
TREETOPS ENA190000
TREETOPS C1NA190000
TREETOPS C2NA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 16 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.

TREETOPS A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS F82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS E82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS C182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TREETOPS C282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 16 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
ClubhouseYes0%
Cricket GroundYes0%
Football fieldYes0%
TempleYes0%

Parking filed896

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots896
Closed/Covered648
Open Space248
BuildingClosed/CoveredOpen SpaceTotal
TREETOPS A8131112
TREETOPS B8131112
TREETOPS C8131112
TREETOPS D8131112
TREETOPS F8131112
TREETOPS E8131112
TREETOPS C18131112
TREETOPS C28131112

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,451 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI52388.0
Proposed, not sanctioned47,625 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Industry House Opp Ramon House 159 HT Parekh Marg Churchgate Mumbai 400020

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000000837Veera Vincent DsaAjitnath Hi-Tech Buikders Pvt Ltd23/09/2017
CC006000000044358Shourav BanerjeeAjit nath Hi-Tech builders Pvt ltd ( Lodha developers Pvt Ltd)01/05/2018
CC006000000057042CHITRA MEENALODHA Developers26/12/2018
CC006000000195488Mrs. Arpita JainLODHA DEVELOPERS LIMITED26/04/2021
CC006000000251527Arpita jainLodha Developers Limited23/06/2022
CC006000000196116PrajaktaLodha developer26/03/2021
CC006000000375394MACROTECH DEVELOPERS LIMITEDSUJATA RAJIV HADKAR28/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Nov 2021

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold Unsold - UPPER THANE - TREETOPS - P51700008449 - March 24.pdf16 May 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate-Casa Treetops.pdf13 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Upper Thane.pdf19 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 86 UPPER THANE - TREETOPS.pdf18 Oct 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Treetops.pdf2 Sep 2021
Form 2AFile: Vipul Pandya Conso[076-078].pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 88 Upper Thane Treetops.pdf27 Oct 2020
Form 2AFile: Upper Thane Treetops A to C C1 C2, D to E.pdf25 Aug 2020
Certificates of CA (Form 5)File: Upper Thane Treetops.pdf30 Sep 2019
Form 2AFile: UT Treetops.pdf17 Jun 2019
OtherFile: LDL to MDL.pdf28 May 2019
Details of encumbrancesFile: UPPER THANE TREETOPS.pdf25 Feb 2019
Details of encumbrancesFile: Upper Thane Tretops.pdf16 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: CASA TREETOPS - A TO C.pdf13 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: CASA TREETOPS - C1 TO F.pdf13 Nov 2018
Certificates of CA (Form 5)File: UT TREETOPS.pdf1 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Treetops.pdf17 Aug 2018
Details of encumbrancesFile: UT Treetops.pdf13 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2 UT Treetops.pdf11 Aug 2018
Certificates of CA (Form 3)File: F3 UT Treetops.pdf11 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: CC ITP Bhiwandi_020718.pdf7 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC_Casa Treetop_dtd_06_04_2018.pdf19 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: UT TREETOPS.pdf6 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: UPEER THANE TREETOPS.pdf6 Apr 2018
Details of encumbrancesFile: TREETOPS.pdf30 Mar 2018
Certificates of CA (Form 3)File: Treetops.pdf29 Mar 2018
Certificates of CA (Form 3)File: upper thane treetops.pdf28 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Final.pdf24 Jan 2018
Proforma of Allotment letterFile: ATS_Upper Thane_v3_2 November 2017.pdf6 Nov 2017
Layout approvalFile: Approved Layout V1.pdf12 Oct 2017
Layout approvalFile: Approved Layout Letter A.pdf12 Oct 2017
Layout approvalFile: Approved Layout Letter B.pdf12 Oct 2017
Layout approvalFile: Approved Layout Letter C.pdf12 Oct 2017
Copy of Layout Approval (in case of layout)File: Approved Layout V1.pdf12 Oct 2017
Copy of Layout Approval (in case of layout)File: Approved Layout Letter A.pdf12 Oct 2017
Copy of Layout Approval (in case of layout)File: Approved Layout Letter B.pdf12 Oct 2017
Copy of Layout Approval (in case of layout)File: Approved Layout Letter C.pdf12 Oct 2017
Building plan approvalFile: IOD 2 and 6.pdf29 Jul 2017
Building plan approvalFile: IOD 2 and 8.pdf29 Jul 2017
Building plan approvalFile: IOD 2 and 4.pdf29 Jul 2017
Building plan approvalFile: IOD 3 and 5.pdf29 Jul 2017
Building plan approvalFile: IOD 3 and 7.pdf29 Jul 2017
Building plan approvalFile: IOD 3 and 9.pdf29 Jul 2017
Building plan approvalFile: IOD 1.pdf29 Jul 2017
Layout approvalFile: Layout 2.pdf29 Jul 2017
Layout approvalFile: Layout 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 2 and 4.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 2 and 6.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 2 and 8.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 3 and 5.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 3 and 7.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD 3 and 9.pdf29 Jul 2017
Copy of the legal title reportFile: Title Report one.pdf28 Jul 2017
Copy of the legal title reportFile: Title Report two.pdf28 Jul 2017
Details of encumbrancesFile: Lodha UT - Treetops Encumbrances.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: UT Treetops.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: UT - Treetops - Form 2.pdf28 Jul 2017
Certificates of CA (Form 3)File: Form3-Treetops.pdf28 Jul 2017
Proforma of Allotment letterFile: ATS_Final.pdf28 Jul 2017
PAN CardFile: Ajitnath Hi-tech Pan Card.pdf27 Jul 2017
Declaration in FORM BFile: Form B Upper Thane Treetops.pdf27 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LODHA PARKP51900001339.2,210Jul 2017CompletedDec 2023Registered original: Dec 2021Feb 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Upper Thane Treetops A - C, C1, C2, D - F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .7,600+ in Thane

2 kmUpper Thane Treetops A -Completed 8Lapsed / revoked 3Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: MACROTECH DEVELOPERS LIMITED

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Upper Thane Treetops A - C, C1, C2, D - F is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Upper Thane Treetops A - C, C1, C2, D - F?

The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Upper Thane Treetops A - C, C1, C2, D - F?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Upper Thane Treetops A - C, C1, C2, D - F?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Upper Thane Treetops A - C, C1, C2, D - F?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Upper Thane Treetops A - C, C1, C2, D - F?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Upper Thane Treetops A - C, C1, C2, D - F?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Upper Thane Treetops A - C, C1, C2, D - F. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Upper Thane Treetops A - C, C1, C2, D - F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.