ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Unitas TownHomes Wing A

Registered No litigation declared Others project

Unitas TownHomes Wing A

By UNITET DEVELOPERS PRIVATE LIMITED

RG-MH-19073 · RERA P52100078108 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2032Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 70%
103 of 122Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Unitas TownHomes Wing A is a Others project by UNITET DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100078108 on 25 Nov 2024. Possession is promised by 1 Jan 2032. 19 of the 122 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameUnitas TownHomes Wing A
  • TypeOthers
  • Location
    • Survey No.-37 Hissa No.-39
    • Kondhwa Khurd
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • RERA no.P52100078108
  • ReraGenie IDRG-MH-19073

Builder

  • NameUNITET DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations1 more →

Key dates

this monthRegisteredNov 2024PromisedJan 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion1 Jan 2032
  • Revised completionNone
  • Buildings2 building records
  • Documents filed54 files

Current status

16%19 of 122 units booked
30.9%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA8848452
Wing ANA44224870

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.

Wing B6%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed274

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots274
Closed/Covered78
Open Space196
BuildingClosed/CoveredOpen SpaceTotal
Wing B3476110
Wing A44120164

Land and ownership18

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,496 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
LandownerVillageDistrict
MR.DHAWALJEET VAMAN PARGEkondhwa khurdPune
MRS.SARIKA SATPAL PARGEkondhwa khurdPune
MRS.MONALI VAMAN PARGEkondhwa khurdPune
MRS.ASHWINI ROHIT DEREkondhwa khurdPune
SGURRENERGY INDIA PRIVATE LIMITEDkondhwa khurdPune
MR.RAMCHANDRA SHRIPATI PARGEkondhwa khurdPune
MR.RANJEET LAXMAN PARGEkondhwa khurdPune
MISS.DALINI LAXMAN PARGEkondhwa khurdPune
MRS.MONALI AMIT BHELKEkondhwa khurdPune
MRS.SHALINI LAXMAN PARGEkondhwa khurdPune
MR. LAXMAN SHRIPATI PARGEkondhwa khurdPune
MASTER RISHI SATPAL PARGEkondhwa khurdPune
MASTER MANJEET SATPAL PARGEkondhwa khurdPune
MASTER KULJEET SATPAL PARGEkondhwa khurdPune
MASTER VISHWAJIT VAMAN PARGEkondhwa khurdPune
MR. SATPAL RAMCHANDRA PARGEkondhwa khurdPune
MR. VAMAN RAMCHANDRA PARGEkondhwa khurdPune
MRS LATA RAMCHANDRA PARGEkondhwa khurdPune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI31981.68
Proposed, not sanctioned7,982 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop 45 C2 Brahma Estate Kondhwa Khurd 411048
Estimated costRs 37.70 cr
Cost incurredRs 11.66 cr
Work done30.93%
BuildingWingEstimatedIncurred
Wing BNARs 14.50 crRs 1.52 cr
Wing ANARs 14.50 crRs 1.52 cr
-NARs 8.70 crRs 8.62 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSayed Shaqib Taufiq Ali
EngineerSK CONSULTANTS & ENGINEERS
Chartered AccountantN B Sayed & Associates
Chartered AccountantDBT & Associates
PartnerRole in project
TINGRE BIZCORP PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jan 2032

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1) Form - 1 Architect Certificate - Wing A (apr-june).pdf29 May 2026
Withdrawal Update Form 1File: 1) Form - 1 Architect Certificate -Wing A(jul to sep).pdf29 May 2026
Withdrawal Update Form 1File: 1) FORM - 1 ARCHITECT CERTIFICATE - WING A.pdf29 May 2026
Withdrawal Update Form 1File: 1) Architech Certificate - Wing - A.pdf29 May 2026
Withdrawal Update Form 2File: 2) Form - 2 Engineers Certificate wing A( apr-june 25).pdf29 May 2026
Withdrawal Update Form 2File: 2) Form - 2 Engineers Certificate Wing A (July-sept 25).pdf29 May 2026
Withdrawal Update Form 2File: 2) FORM - 2 ENGINEERS CERTIFICATE - WING -A.pdf29 May 2026
Withdrawal Update Form 2File: 2) Engineers Certificate - Wing A.pdf29 May 2026
Withdrawal Update Form 3File: 3) Form - 3 CA Certificate wing A( Apr-June-25).pdf29 May 2026
Withdrawal Update Form 3File: 3) Form - 3 CA Certificate -Wing - A ( jul-sept-25) (1).pdf29 May 2026
Withdrawal Update Form 3File: 3) FORM - 3 CA CERTIFICATE WING -A.pdf29 May 2026
Withdrawal Update Form 3File: 3) CA Certificate Wing A_compressed.pdf29 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Unitas TownHomes Wing -A Form 1 March (1).pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unitas TownHomes Wing A March 2025.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Unitas Town Homes Wing -A March Engineer Cerificate.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Unitas TownHomes Wing -A.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Unitas TownHomes Wing -A Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Unitas TownHomes Wing -A Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Unitet DPL Unitas Townhomes Wing- form 2 Engineer Certificate.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Unitas Townhomes wing A.pdf16 Apr 2025
Other - FinanceFile: Wing - A (1).pdf19 Nov 2024
Other - FinanceFile: POA 1 UNITET.pdf19 Nov 2024
Other - FinanceFile: POA 2 UNITET.pdf19 Nov 2024
Other - FinanceFile: Declaration of Total Unit count ( 14-11-24 ) (1).pdf19 Nov 2024
Other - TechnicalFile: 4 Other - Technical (1).pdf19 Nov 2024
Other - TechnicalFile: Declaration of Total Unit count ( 14-11-24 ) (1).pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Unitas Townhomes Wind -A.pdf12 Nov 2024
Other - TechnicalFile: cc verification (2).pdf12 Nov 2024
Building plan approvalFile: scan 24.pdf11 Nov 2024
Building plan approvalFile: 11zon_merged-PDF (2)_11zon.pdf11 Nov 2024
Layout approvalFile: scan 19.pdf11 Nov 2024
Copy of the legal title reportFile: Vibhute mam_11zon.pdf11 Nov 2024
Copy of Layout Approval (in case of layout)File: scan 19.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 11zon_merged-PDF (2)_11zon.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 24.pdf11 Nov 2024
Other - TechnicalFile: ilovepdf_merged (19).pdf11 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure finance wing - A- unitet (1).pdf11 Nov 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER FINANCE.pdf6 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance letter legal.pdf6 Nov 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (1) (1).pdf6 Nov 2024
Declaration in FORM BFile: form - B Unitas Townhomes Wing A.pdf6 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf6 Nov 2024
Declaration about Commencement CertificateFile: Format - D wing A.pdf6 Nov 2024
CERSAI detailsFile: Cersai Declaration.pdf6 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format - A Wing -A.pdf6 Nov 2024
Deviation Report with respect to Allotment letterFile: 5 (1).pdf6 Nov 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER FINANCE.pdf6 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrance letter legal.pdf6 Nov 2024
Other - TechnicalFile: Order 50.pdf6 Nov 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (1) (1).pdf6 Nov 2024
Proforma of Agreement for saleFile: Final AFS-Unitet Wing A.pdf6 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (2).pdf6 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Wing A.pdf6 Nov 2024
PAN CardFile: Unitet _PAN .pdf5 Nov 2024

How this compares with Pune

16%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Unitas TownHomes Wing A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa Khurd13,700+ in Pune

Builder: UNITET DEVELOPERS PRIVATE LIMITED

UNITET DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including Unitas TownHomes Wing D and Unitas TownHomes Wing A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Unitas TownHomes Wing A is delayed beyond 1 Jan 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Unitas TownHomes Wing A?

The registered promoter entity is UNITET DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Unitas TownHomes Wing A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Unitas TownHomes Wing A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Unitas TownHomes Wing A?

The professionals named in the filing: Architect: Sayed Shaqib Taufiq Ali; Engineer: SK CONSULTANTS & ENGINEERS; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: DBT & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Unitas TownHomes Wing A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Unitas TownHomes Wing A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Unitas TownHomes Wing A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.