Ultima Grandeur

By Tribute Victoria Realty LLP

RG-MH-07397 · RERA P52100056421 · Last updated on MahaRERA portal: 14 Oct 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedmoved 4 months by MahaRERA order
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
16 of 57Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Ultima Grandeur is a Others project by Tribute Victoria Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100056421 on 31 May 2024. Possession is promised by 31 Jul 2028. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 41 of the 57 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameUltima Grandeur
  • TypeOthers
  • Location
    • S No 64/1B
    • 64/1B/2
    • 64/1B/2A
    • 64/1B/3
    • Kondhwa Budruk
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056421
  • ReraGenie IDRG-MH-07397

Builder

  • NameTribute Victoria Realty LLP
  • Entity typePartnership
  • GSTIN27AAOFT4724E1Z0
  • PartnersPrayank Vikram Dhaddha, Swapnil Jalamchand Parakh
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2024First promiseMar 2028Revised toJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2024
  • Promised completion31 Jul 2028
  • Revised completionRevised to 31 Jul 2028 (originally 31 Mar 2028)
  • Buildings2 building records
  • Documents filed70 files

Current status

72%41 of 57 units booked
52.5%Work done, per cost certificate

Figures as on 14 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ultima Grandeur Wing ANA666915
Ultima Grandeur Wing BNA151442042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

Ultima Grandeur Wing A43%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ultima Grandeur Wing B43%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered118
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
Ultima Grandeur Wing A23831
Ultima Grandeur Wing B95095

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2026
LandownerVillageDistrict
Jalamchand Kesharchand ParakhGultekadiPune
Swapnil Jalamchand ParakhGultekadiPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI20182.57
Proposed, not sanctioned10,332 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKondhwa Khurd, Pune
Estimated costRs 47.65 cr
Cost incurredRs 25.03 cr
Work done52.52%
BuildingWingEstimatedIncurred
Ultima Grandeur Wing BNARs 23.13 crRs 13.42 cr
Ultima Grandeur Wing ANARs 19.76 crRs 11.46 cr
-NARs 4.77 crRs 15.22 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectImran Shaikh
Engineersuhas Baban Alhat
Chartered AccountantSAC & CO LLP
Chartered AccountantPriyanka chordiya
PartnerRole in project
Tribute Victoria Realty LLP-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Mar 2028 → Jul 2028

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Tribute Ph 30 09 2026.pdf14 Oct 2026
Withdrawal Update Form 2File: Form 2 Tribute Ph 30 09 2026.pdf14 Oct 2026
Withdrawal Update Form 3File: Form 3 Tribute Ph 30 09 2026 sign_compressed.pdf14 Oct 2026
Form 5 (FY 2024-2025)File: Form 5_Ultima Granduer FY 2024-2025 sign_compressed.pdf12 Sep 2026
Form 5 (FY 2025-2026)File: Form 5_Ultima Granduer FY 2025-2026 sign.pdf12 Sep 2026
Withdrawal Update Form 1File: FORM- 1 01042026_compressed.pdf13 Aug 2026
Withdrawal Update Form 1File: FORM- 1 Sign copy 01072026_compressed.pdf13 Aug 2026
Withdrawal Update Form 2File: FORM- 2 01042026_compressed.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 Sign copy 01072026_compressed.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 Tribute Ph 31032026 sign_compressed_compressed.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 Tribute Ph 30062026 Sign.pdf13 Aug 2026
Form 2A (FY 2024-2025)File: FORM- 2A.pdf13 Aug 2026
Form 2A (FY 2025-2026)File: FORM- 2A.pdf13 Aug 2026
Withdrawal Update Form 1File: FORM- 1.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 1102025.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 01012026.pdf12 Aug 2026
Withdrawal Update Form 2File: FORM-2.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 1102025.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 01012026.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 Tribute Ph 30062025 sign_compressed.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 Tribute Ph 30092025 sign_compressed.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 Tribute Ph 31122025 sign_compressed.pdf12 Aug 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tribute Ph 31032025 compressed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Ultima Grandeur 31-12-2024_compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 UItima Grandeur 30-09-2024_compressed.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TVRLLP.pdf13 Dec 2024
Proforma of Agreement for saleFile: Agreement.pdf25 May 2024
Other - TechnicalFile: CC.pdf25 May 2024
Details of encumbrances concerned to FinanceFile: 11 Financial Encumbrances Certificate Sign Copy.pdf23 May 2024
Details of encumbrances concerned to FinanceFile: 11 Legal Encumbrances Certificate Sign Copy.pdf23 May 2024
Details of encumbrances concerned to LegalFile: 11 Financial Encumbrances Certificate Sign Copy.pdf23 May 2024
Details of encumbrances concerned to LegalFile: 11 Legal Encumbrances Certificate Sign Copy.pdf23 May 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf23 May 2024
CERSAI detailsFile: Self Declaration for CERSAI Report Sign copy.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ultima Grandeur.pdf23 May 2024
Declaration in FORM BFile: FORM-B Sign Copy.pdf10 May 2024
Proforma of Allotment letterFile: Draft Allotment Letter.pdf10 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Account-Sign copy.pdf10 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter sign copy.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for sale Sign copy.pdf10 May 2024
Other - TechnicalFile: Declaration Order No- 50-Sign copy.pdf10 May 2024
Other - TechnicalFile: CC Verification.pdf10 May 2024
Layout approvalFile: 1_8 BP LAYOUT.pdf9 May 2024
Building plan approvalFile: 2_8 PARKING LAYOUT.pdf9 May 2024
Building plan approvalFile: 3_8 WING A GF MEZZ.pdf9 May 2024
Building plan approvalFile: 4_8 WING A 1ST 2ND FLOOR.pdf9 May 2024
Building plan approvalFile: 5_8 WING A 3RD 4TH 5TH FLOOR.pdf9 May 2024
Building plan approvalFile: 6_8 WING A SECTION ELEVATION.pdf9 May 2024
Building plan approvalFile: 7_8 WING B 1ST TO 14TH FLOOR.pdf9 May 2024
Building plan approvalFile: 8_8 WING B SECTION ELEVATION.pdf9 May 2024
PAN CardFile: Tribute Victoria Realy LLP- PAN Scan Copy.pdf9 May 2024
Copy of the legal title reportFile: TITLE SEARCH REPORT _compressed.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: 1_8 BP LAYOUT.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2_8 PARKING LAYOUT.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3_8 WING A GF MEZZ.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4_8 WING A 1ST 2ND FLOOR.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_8 WING A 3RD 4TH 5TH FLOOR.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 6_8 WING A SECTION ELEVATION.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_8 WING B 1ST TO 14TH FLOOR.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 8_8 WING B SECTION ELEVATION.pdf9 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 May 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf9 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Prayank Dhaddha.pdf9 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Swapnil Parakh.pdf9 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Ultima Business CenterP52100026963Kondhwa Budruk, PuneNov 2020Certificate SignedJun 2023Jun 2023

How this compares with Pune

72%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 4 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ultima Grandeur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa Budruk14,000+ in Pune

2 kmUltima GrandeurCompleted 3Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Tribute Victoria Realty LLP

Tribute Victoria Realty LLP has 3 registrations on MahaRERA, including Ultima Business Center and Ultima Grandeur. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Ultima Grandeur is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ultima Grandeur?

The registered promoter entity is Tribute Victoria Realty LLP, a partnership as per the filing. Its GSTIN 27AAOFT4724E1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ultima Grandeur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ultima Grandeur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ultima Grandeur?

The professionals named in the filing: Architect: Imran Shaikh; Engineer: suhas Baban Alhat; Chartered Accountant: SAC & CO LLP; Chartered Accountant: Priyanka chordiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ultima Grandeur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ultima Grandeur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ultima Grandeur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.