Red flags

  • Completion date moved by 28 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 28 months from the original
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
19 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

UJWAL TOWER is a Residential / Group Housing project by SHREYAS KORAD ASSOCIATE in Pune, Maharashtra, registered with MahaRERA as P52100080621 on 23 Jun 2025. Possession is promised by 30 Apr 2028. The completion date has moved by 28 months from the original filing. 0 of the 19 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameUJWAL TOWER
  • TypeResidential / Group Housing
  • Location
    • LANE 4
    • MUNJABAWASTI DHANORI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080621
  • ReraGenie IDRG-MH-33268

Builder

  • NameSHREYAS KORAD ASSOCIATE
  • Entity typePartnership

Key dates

this monthRegisteredJun 2025First promiseDec 2025Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed51 files

Current status

0%0 of 19 units booked
59.5%Work done, per cost certificate

Figures as on 11 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UJWAL TOWERNA6419019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

UJWAL TOWER: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 11 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes90%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered73

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area620 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Dec 2025
LandownerVillageDistrict
SHREYAS KORAD ASSOCIATEPune (M Corp.)Pune
Sanjay KoradPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3070.23
Proposed, not sanctioned628 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSunanda Apartment, Shop No 1 2 4 Vishrantwadi Pune - 411015
Estimated costRs 2.69 cr
Cost incurredRs 1.60 cr
Work done59.51%
BuildingWingEstimatedIncurred
UJWAL TOWERNARs 2.69 crRs 1.60 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHAWAL DESHMUKH
EngineerPRAVIN KADAM
EngineerSitaram Lahanu Sanap
Chartered AccountantSCT & COMPANY
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
SHREYAS KORAD ASSOCIATE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25072621869Dec 2025 → Dec 2027

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

P52100080621/WarDec 2025 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26.pdf11 Sep 2026
Withdrawal Update Form 1File: Form 1_Jun 26.pdf11 Sep 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf11 Sep 2026
Withdrawal Update Form 2File: Form 2_Jun 26.pdf11 Sep 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf11 Sep 2026
Withdrawal Update Form 3File: Form 3_Jun 26.pdf11 Sep 2026
Form 5 (FY 2025-2026)File: RERA Audit Report_FY 2025-26.pdf4 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf25 Jul 2026
Withdrawal Update Form 1File: Architect Certificate Sep 25.pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Sep 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf13 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Sep 25.pdf13 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Dec 25.pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Certificate June 25.pdf12 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate June 25.pdf12 Mar 2026
Withdrawal Update Form 3File: CA Certificate_Jun 25.pdf12 Mar 2026
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B.pdf19 Jun 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf19 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 May 2025
Other - LegalFile: FORMAT B.pdf22 May 2025
Other - LegalFile: FORMAT A.pdf22 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf22 May 2025
Other - TechnicalFile: Annexure A.pdf15 Apr 2025
Declaration in FORM BFile: 01.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf13 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf13 Mar 2025
Copy of the legal title reportFile: LEGAL SEACH REPORT.pdf7 Jun 2024
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal (1).pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf7 Jun 2024
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal (1).pdf7 Jun 2024
Layout approvalFile: SanctionPlan.pdf2 Mar 2024
Layout approvalFile: SanctionPlan1.pdf2 Mar 2024
Building plan approvalFile: SanctionPlan.pdf2 Mar 2024
Building plan approvalFile: SanctionPlan1.pdf2 Mar 2024
PAN CardFile: Shreyas Korad Associate pancard .pdf2 Mar 2024
Copy of Layout Approval (in case of layout)File: SanctionPlan.pdf2 Mar 2024
Copy of Layout Approval (in case of layout)File: SanctionPlan1.pdf2 Mar 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf2 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate _.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SanctionPlan.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SanctionPlan1.pdf2 Mar 2024
Other - LegalFile: DocScanner Feb 26, 2024 5-25 PM.pdf2 Mar 2024
Other - LegalFile: PartnershipDeed.pdf2 Mar 2024
Declaration about Commencement CertificateFile: Declaration to Commencement Certificate.pdf2 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report_200299035552_For_Asset_Based_Search_02_03_2024_17_08_30_128.pdf2 Mar 2024
Deviation Report with respect to Allotment letterFile: 20240129095101 (1).pdf2 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf2 Mar 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (3) (1).pdf2 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SHREYAS KORAD DECLARATION OF INTEREST.pdf2 Mar 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 28 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UJWAL TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNJABAWASTI DHANORI13,700+ in Pune

2 kmUJWAL TOWERCompleted 53Lapsed / revoked 21Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: SHREYAS KORAD ASSOCIATE

SHREYAS KORAD ASSOCIATE has 1 registration on MahaRERA, including UJWAL TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if UJWAL TOWER is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UJWAL TOWER?

The registered promoter entity is SHREYAS KORAD ASSOCIATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UJWAL TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UJWAL TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UJWAL TOWER?

The professionals named in the filing: Architect: DHAWAL DESHMUKH; Engineer: PRAVIN KADAM; Engineer: Sitaram Lahanu Sanap; Chartered Accountant: SCT & COMPANY; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UJWAL TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UJWAL TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UJWAL TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.