Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 72 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 72 months from the original
13 of 88Construction stages doneacross 8 buildings; furthest along: Stilt Floor, 70%
1 of 1Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

TULSI NISARG is a Others project by PRISTINE GROUP in Raigarh, Maharashtra, registered with MahaRERA as P52000005986 on 14 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 72 months from the original filing. 0 of the 1 unit on this registration is recorded sold or booked, and 13 of 88 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameTULSI NISARG
  • TypeOthers
  • Location
    • neral
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005986
  • ReraGenie IDRG-MH-11520

Builder

  • NamePRISTINE GROUP
  • Entity typeOthers
  • PartnersBHAVIN RAMESHCHANDRA PATEL, CHIRAG KANUBHAI PATEL, KETAN PRALHADBHAI SURANI, VIJAY ASHOK JESWANI, VAIBHAV PURUSHOTTAM AGRAWAL, DEEPAK AWATRAM VALECHA, MONICA KVINJAL PATEL, JIGNESH DINESH SANGHVI
  • Named personsMANGAL PYARELAL PARMAR, RAJAN SHRIRAMDAYAL KAKKAR, RADHA MOHAN MISHRA, SANJAY UTTAMCHAND SHETIYA, SHRIRAM DAJI RANE, NITESH MAHENDRAKUMAR SHAH

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2021)
  • Buildings8 building records
  • Documents filed63 files

Current status

0%0 of 1 units booked

Figures as on 6 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1 WING ANA91101
BUILDING 1 WING BNA90000
BUILDIND 1 WING CNA90000
BUILDING 2 WING DNA90000
BUILDING NO 2 WING ENA90000
BUILDING NO 2 WING FNA90000
BUILDING NO 3 WING GNA60000
BUILDING NO 3 WING HNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Stilt Floor, at 70%.

BUILDING 1 WING A41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 1 WING B37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDIND 1 WING C27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 2 WING D22%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 WING E18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 WING F9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
BUILDING 1 WING A11
BUILDING 1 WING B11
BUILDIND 1 WING C11
BUILDING 2 WING D11
BUILDING NO 2 WING E11
BUILDING NO 2 WING F11
BUILDING NO 3 WING G11
BUILDING NO 3 WING H11

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,320 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
NITESH MAHENDRAKUMAR SHAHNeralRaigarh
MANGAL PYARELAL PARMARKarjatRaigarh
RAJKUMAR SHRIRAMDAYAL KAKKARPune (M Corp.)Pune
SANJAY UTTAMCHAND SHETIYAPune (M Corp.)Pune
RADHA MOHAN MISHRAPune (M Corp.)Pune
SHRIRAM DAJI RANENeralRaigarh

Approvals and building plan

Sanctioning authorityRaigad Zilla Parishad
Permissible FSI16606.8
Proposed, not sanctioned12,392 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNERAL 410101

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAISINGH AHUJA AND ASSOCIATES
EngineerS VPATEL AND ASSOCIATES
Chartered AccountantCA MAYUR PADEKAR
PartnerRole in project
PRISTINE GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000009708Jun 2021 → Dec 2026

Reason as filed by the promoterDue to Covid-19 , non availability of workers and business stress.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000303140ABBAS SHIKARISIDDHIVINAYAK REALTORS26/10/2022
CC006000000303152ABBAS SHIKARISIDDHIVINAYAK REALTORS26/10/2022
CC006000000303260Vilas Bhaga DalviSiddhivinayak Realtors09/11/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - March 2022.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - June 2022.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 2022.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 2022.pdf6 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Form 2 - Mar 25.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-2023.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-2024.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - Jun 23.pdf26 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 - Sep 23.pdf26 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 - Dec 23.pdf26 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 - Mar 24.pdf26 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 - Jun 24.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 0 Form 2 - Mar 23.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 - Jun 23_organized.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - Sep 23_organized.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Form 2 - Dec 23_organized.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Form 2 - Mar 24_organized.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2 - Jun 24.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Form 2 - Sep 24.pdf26 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Form 2 - Dec 24.pdf26 Mar 2025
Certificates of CA (Form 3)File: Form for Withdrawl.pdf16 Feb 2024
Certificates of CA (Form 3)File: Form for Withdrawl 2_11zon (1).pdf16 Feb 2024
Certificates of CA (Form 5)File: Form 5 - FY 22-23.pdf4 Feb 2024
Proforma of Agreement for saleFile: Customer Agreement Pristine.pdf27 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1)form 1-1-4-2022.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2)Form 1 -1-7-2022.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3)form 1-30-9-22.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4)form 1-1-1-23.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5)form 1-1-4-23.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold inventory_compressed.pdf5 Jan 2023
Proforma of Agreement for saleFile: 2 Proforma of Allotment letter.pdf4 Jan 2023
Declaration about Commencement CertificateFile: circular 32.pdf30 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - SR 19-20.pdf23 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A - SR 20-21.pdf23 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - SR 21-22.pdf23 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Siddhivinayak Realtors Form 5.pdf26 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Siddhivinayak Realtors.pdf10 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1 Siddhivinayak Realtors_Tulsi Nisarg _DT100321.pdf10 Mar 2021
Certificates of CA (Form 5)File: CA CERT.pdf22 Dec 2018
Details of encumbrancesFile: Tulsi_Nisarg_No_Ecumbrance_Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Tulsi Nisarg Affidavit_ TN.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tulsi Nisarg Architect Cetificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tulsi Nisarg Engineer's Certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: IMG_20170725_204730__1_.pdf28 Jul 2017
Certificates of CA (Form 3)File: Tulsi Nisarg CA Certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: Allotment letter Tulsi Nisarg.pdf28 Jul 2017
Proforma of Allotment letterFile: AGREEMENT FOR SALE NEW RERA NISARG.pdf28 Jul 2017
Building plan approvalFile: 1Nisarg CC.pdf19 Jul 2017
Layout approvalFile: MYSCAN_0004.PDF19 Jul 2017
Layout approvalFile: MYSCAN_0005.pdf19 Jul 2017
Layout approvalFile: MYSCAN_0006.PDF19 Jul 2017
Layout approvalFile: MYSCAN_0007.pdf19 Jul 2017
Layout approvalFile: MYSCAN_0008.pdf19 Jul 2017
PAN CardFile: Siddhivinayak Realtors Pan Card.pdf19 Jul 2017
Copy of the legal title reportFile: 2Title search 107.pdf19 Jul 2017
Copy of the legal title reportFile: 3Title search 108.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_0004.PDF19 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_0005.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_0006.PDF19 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_0007.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_0008.pdf19 Jul 2017
Building Plan Approval (IOD)File: 1Nisarg CC.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 1Nisarg CC.pdf19 Jul 2017

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 72 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TULSI NISARG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near neral5,900+ in Raigarh

2 kmTULSI NISARGCompleted 17Lapsed / revoked 16Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: PRISTINE GROUP

PRISTINE GROUP has 1 registration on MahaRERA, including TULSI NISARG. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if TULSI NISARG is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TULSI NISARG?

The registered promoter entity is PRISTINE GROUP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TULSI NISARG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TULSI NISARG?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TULSI NISARG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TULSI NISARG?

The professionals named in the filing: Architect: RAISINGH AHUJA AND ASSOCIATES; Engineer: S VPATEL AND ASSOCIATES; Chartered Accountant: CA MAYUR PADEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TULSI NISARG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TULSI NISARG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TULSI NISARG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.