Home / Browse projects / TULSI HERITAGE

Registered No litigation declared Residential / Group Housing project

TULSI HERITAGE

By BLUE STONE DEVELOPERS LLP

RG-MH-18007 · RERA P51900066485 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of AU SMALL FINANCE BANK
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
23 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

TULSI HERITAGE is a Residential / Group Housing project by BLUE STONE DEVELOPERS LLP in DADAR MUMBAI, 400014, registered with MahaRERA as P51900066485 on 11 Jun 2024. Possession is promised by 30 Sep 2028. 15 of the 38 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameTULSI HERITAGE
  • TypeResidential / Group Housing
  • Location
    • HINDU COLONY ROAD NO 3
    • DADAR MUMBAI
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900066485
  • ReraGenie IDRG-MH-18007

Builder

  • NameBLUE STONE DEVELOPERS LLP
  • Entity typePartnership
  • PartnerARSHAD USMAN MERCHANT

Key dates

this monthRegisteredJun 2024PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion30 Sep 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

39%15 of 38 units booked
22.4%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TULSI HERITAGENA171538038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

TULSI HERITAGE: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33

Land and ownership4

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area381 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on14 May 2026
LandownerVillageDistrict
JAYANT TULSIDAS MISTRY-Mumbai City
ROHIT TULSIDAS MISTRY-Mumbai City
RAMESH TULSIDAS-Mumbai City
GAUTAM TULSIDAS MISTRY-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2035.64
Proposed, not sanctioned1,988 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Ground Floor, Kanakia Zillion, LBS-CST Road, Junction,BKC Annexe, Kurla(W),Mumbai,Maharashtra-400070
Estimated costRs 14.65 cr
Cost incurredRs 3.29 cr
Work done22.43%
BuildingWingEstimatedIncurred
TULSI HERITAGENARs 10.26 crRs 3.29 cr
-NARs 4.39 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA P DHARIA & ASSOCIATES
ArchitectVIVEK BHOLE ARCHITECTS PVT LTD
EngineerGMB CONSULTING SRUCTURAL & CIVIL ENGINEER
EngineerDinesh Salunkhe
Chartered AccountantMOHAN L GUPTA & ASSOCIATES
Chartered AccountantB N KUMAWAT AND ASSOCIATES
Chartered AccountantSNH & Associates
PartnerRole in project
BLUE STONE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2028

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf1 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf1 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf1 Jul 2026
Form 1File: NEW Form 1.pdf15 May 2026
Form 2File: Form 2.pdf15 May 2026
Form 3File: Q2 FORM 3.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf15 May 2026
Form 1File: Form 1.pdf15 May 2026
Form 2File: Form 2.pdf15 May 2026
Form 3File: Form 3.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf15 May 2026
Form 1File: Form 1.pdf15 May 2026
Form 2File: Form 2.pdf15 May 2026
Form 3File: Form 3 rera.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf15 May 2026
Form 1File: Form 1.pdf15 May 2026
Form 2File: Form2.pdf15 May 2026
Form 3File: Form3.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf15 May 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf15 May 2026
Form 2A (FY 2025-2026)File: form 2A.pdf15 May 2026
Form 1File: form1.pdf13 May 2026
Form 2File: Form 2.pdf13 May 2026
Form 3File: Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD-UNSOLD.pdf13 May 2026
Form 1File: Form 1.pdf13 May 2026
Form 2File: Form 2.pdf13 May 2026
Form 3File: Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD-UNSOLD.pdf13 May 2026
Form 1File: Form 1.pdf13 May 2026
Form 2File: Form 2.pdf13 May 2026
Form 3File: Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD-UNSOLD INVENTORY.pdf13 May 2026
Form 1File: Form 1.pdf13 May 2026
Form 2File: Form 2.pdf13 May 2026
Form 3File: Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD-UNSOLD.pdf13 May 2026
Form 5 (FY 2025-2026)File: Form 5.pdf13 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate TULSI HERITAGE.pdf11 Jul 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 30062025.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT Dec 24.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Marc 25 .pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on March 2025.pdf12 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 25_compressed.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD March 2025.pdf12 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A March 25.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC.pdf29 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD REVISED Q3.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Site Supervisor Certificate.pdf29 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: GetUserDocumentFileContent.pdf29 May 2025
Layout approvalFile: APPROVED PLAN REVISED.pdf21 May 2025
Copy of Layout Approval (in case of layout)File: APPROVED PLAN REVISED.pdf21 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF UNSOLD INVENTORY Dec 2024.pdf21 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF UNSOLD INVENTORY Mar 2025.pdf21 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM - A - Bank Account Declaration.pdf16 Apr 2025
Other - FinanceFile: FORM - A - Bank Account Declaration.pdf16 Apr 2025
Proforma of Agreement for saleFile: Draft Agreement.pdf2 Apr 2025
Details of encumbrances concerned to FinanceFile: ENCUBRANCE LETTER FINANCE.pdf27 Mar 2025
Details of encumbrances concerned to LegalFile: ENCUBRANCE LETTER FINANCE.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate 2.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FORM 3.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 SOLD UNSOLD INVENTORY.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 3.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate 1 - FORM 1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Jul 2024
Proforma of Agreement for saleFile: Agreement for Sale Draft.pdf8 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report (1).pdf8 Jun 2024
Copy of the legal title reportFile: Title Certificate10052024.pdf1 Jun 2024
Other - LegalFile: TULSI BHAVAN - PROPERTY CARD_compressed.pdf1 Jun 2024
Other - LegalFile: LEASE DEED_TULSIDAS MISTRY_ESTATE.pdf1 Jun 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_.pdf27 Apr 2024
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf27 Apr 2024
Other - TechnicalFile: ANNEXURE A - DECLARATION CUM UNDERTAKING OF AUM.pdf15 Apr 2024
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf9 Apr 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES-LEGAL - 07032024.pdf3 Apr 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES-LEGAL - 07032024.pdf3 Apr 2024

Keep TULSI HERITAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR MUMBAI

2 kmTULSI HERITAGECompleted 19Lapsed / revoked 10Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: BLUE STONE DEVELOPERS LLP

BLUE STONE DEVELOPERS LLP has 1 registration on MahaRERA, including TULSI HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if TULSI HERITAGE is delayed beyond 30 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TULSI HERITAGE?

The registered promoter entity is BLUE STONE DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TULSI HERITAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TULSI HERITAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TULSI HERITAGE?

The professionals named in the filing: Architect: A P DHARIA & ASSOCIATES; Architect: VIVEK BHOLE ARCHITECTS PVT LTD; Engineer: GMB CONSULTING SRUCTURAL & CIVIL ENGINEER; Engineer: Dinesh Salunkhe; Chartered Accountant: MOHAN L GUPTA & ASSOCIATES; Chartered Accountant: B N KUMAWAT AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TULSI HERITAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TULSI HERITAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TULSI HERITAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.