Registered No litigation declared Residential / Group Housing project

Tulsi Aananta

By Shree Developers

RG-MH-34021 · RERA P51700048896 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 51 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
15 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 25%
177 of 277Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Tulsi Aananta is a Residential / Group Housing project by Shree Developers in Thane, Maharashtra, registered with MahaRERA as P51700048896 on 24 Jan 2023. Possession is promised by 31 Dec 2028. 100 of the 277 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.

At a glance

Project

  • NameTulsi Aananta
  • TypeResidential / Group Housing
  • Location
    • Kharvai
    • Badlapur
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048896
  • ReraGenie IDRG-MH-34021

Builder

  • NameShree Developers
  • Entity typePartnership
  • PartnersBipin Ambalal Patel, Deep Sanjay Patel, Dev Vallabh Patel, Gita Kirit Patel, Haresh Gopal Bhutak, Haribhai G Chandak, Hitesh Dhayabhai Patel, Hitesh Narsingh Patel, Jigarkumar Ravibhai Patel, Kanubhai Gangaram Patel, Meet Dinesh Patel, Miten Premji Patel and 7 more
  • Other registrations51 more →
  • Completed21 of 52
  • No longer live19 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredJan 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

36%100 of 277 units booked
69.6%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA12111250125
Wing BNA15141520152

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 25%.

Wing A48%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes50%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered2
Open Space88
BuildingClosed/CoveredOpen SpaceTotal
Wing A14041
Wing B14849

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,030 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jan 2026
LandownerVillageDistrict
Raj GroupBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKBMC
Permissible FSI16119.45
Proposed, not sanctioned16,119 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKharvai, Badlapur
Estimated costRs 46.59 cr
Cost incurredRs 32.41 cr
Work done69.56%
BuildingWingEstimatedIncurred
Wing BNARs 22.21 crRs 22.21 cr
Wing ANARs 19.90 crRs 7.96 cr
-NARs 4.47 crRs 2.24 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRaj Associates (Ar. S R Khambayat)
ArchitectRaj Associates
EngineerER. Kamlesh R Patel
EngineerAadhar Engineers
Chartered AccountantCA Rajendra Chaplot
Chartered AccountantCA Ganapath jain
PartnerRole in project
Shree Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM_1 31-03-2026 Aananta.pdf5 May 2026
Withdrawal Update Form 2File: FORM-2 31-03-2026 Aananta.pdf5 May 2026
Withdrawal Update Form 3File: Form 3 Shree Developers Tulsi Anantha Q4_compressed (1).pdf5 May 2026
Withdrawal Update Form 1File: FORM 1 Aananta 31_12_2025.pdf27 Mar 2026
Withdrawal Update Form 2File: FORM 2 Aananta.pdf27 Mar 2026
Withdrawal Update Form 3File: Form 3 _SRD_compressed.pdf27 Mar 2026
Withdrawal Update Form 1File: FORM-1 Q1 Aananta.pdf16 Jan 2026
Withdrawal Update Form 1File: Form-1 Tulsi Aananta Q2.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2 Aananta.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2 Aananta.pdf16 Jan 2026
Withdrawal Update Form 3File: Signed Form 3 Q4 Shree Developers_compressed.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Tulasi aananta Q2_compressed.pdf16 Jan 2026
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory 31_03_2025.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 31_03_2025 Aananta_11zon.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31_03_2025 Tulsi Aananta.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aananta 31_03_2025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 Aananta.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 Aananta.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory Q3 Aananta.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 Aananta.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A Aananta.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory Aananta_11zon.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Tulsi Aanantha.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062024 Aananta.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- 30062024 Aananta.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold -unsold inventory 30062024 (Aananta).pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 30062024 (Aananta)_compressed.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062024 Aananta.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 30062024 (Aananta)_compressed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- 30062024 Aananta.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold -unsold inventory 30062024 (Aananta).pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Aananta.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Aananta.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Unsold Inventory Tulsi Aanantha PH 8_compressed.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Q4 Shree Developers_compressed.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q1-Aananta.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q2-Aananta.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Shree Developers-Q3_compressed.pdf3 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5-31MARCH2023 Aananta.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-Tulsi Aananta PH 8_Apr23 To Jun23_compressed.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-Tulsi Aanata PH 8_Jul23 To Sep23_Compressed.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30092023 Aananta.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulsi Aananta - Form 2.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 JUN-2023 (Aananta)_compressed.pdf16 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JUN-2023 (Tulsi Aananta).pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 DATED 31-03-2023.pdf3 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Tulsi Aananta 31-03-2023.pdf3 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf3 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Letter_compressed (1).pdf17 Jan 2023
Building plan approvalFile: B-wing PLAN COPY.pdf21 Dec 2022
Building plan approvalFile: A-wing PLAN COPY.pdf21 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: B-wing PLAN COPY.pdf21 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: A-wing PLAN COPY.pdf21 Dec 2022
Copy of the legal title reportFile: Titile Report Tulsi Aananta_compressed.pdf9 Dec 2022
Details of encumbrances concerned to FinanceFile: SHREE RERA CERTIFICATE.pdf9 Dec 2022
Details of encumbrances concerned to LegalFile: SHREE RERA CERTIFICATE.pdf9 Dec 2022
Proforma of Allotment letterFile: AFS.pdf9 Dec 2022
Other - LegalFile: SHREE RERA LETTER.pdf9 Dec 2022
Layout approvalFile: Layout Plan_compressed.pdf15 Nov 2022
Building plan approvalFile: Layout Plan_compressed.pdf15 Nov 2022
PAN CardFile: PAN-Shree Developers.pdf15 Nov 2022
Copy of the legal title reportFile: Rera Titile PH-8_compressed.pdf15 Nov 2022
Copy of the legal title reportFile: Search Report_merged_compressed.pdf15 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf15 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf15 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf15 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan_compressed.pdf15 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf15 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf15 Nov 2022
Declaration about Commencement CertificateFile: Form D.pdf15 Nov 2022
Declaration in FORM BFile: Form B-Revised.pdf15 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200254362123_For_Asset_Based_Search_09_12_2022_11_32_20_779.pdf15 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Rera.pdf15 Nov 2022
Proforma of Agreement for saleFile: Rera Sale Agreement.pdf15 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SHREE RERA BANK AC DECLERATION.pdf15 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf15 Nov 2022

How this compares with Thane

36%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tulsi Aananta on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Badlapur7,600+ in Thane

2 kmTulsi AanantaCompleted 77Lapsed / revoked 32Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 177 registered projects within 2 km.

Builder: Shree Developers

SHREE DEVELOPERS has 52 registrations on MahaRERA, including SHRISHRI LAKE CASTLE and MAYURESHWAR COMPLEX. Its filings disclose 9 earlier MahaRERA projects: declares 6 of 8 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Tulsi Aananta is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tulsi Aananta?

The registered promoter entity is Shree Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tulsi Aananta?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tulsi Aananta?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tulsi Aananta?

The professionals named in the filing: Architect: Raj Associates (Ar. S R Khambayat); Architect: Raj Associates; Engineer: ER. Kamlesh R Patel; Engineer: Aadhar Engineers; Chartered Accountant: CA Rajendra Chaplot; Chartered Accountant: CA Ganapath jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tulsi Aananta?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tulsi Aananta. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tulsi Aananta to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.