Home / Browse projects / Thane, Maharashtra / Tulsi Aananta
Tulsi Aananta
RG-MH-34021 · RERA P51700048896 · Last updated on MahaRERA portal: 5 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 51 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tulsi Aananta is a Residential / Group Housing project by Shree Developers in Thane, Maharashtra, registered with MahaRERA as P51700048896 on 24 Jan 2023. Possession is promised by 31 Dec 2028. 100 of the 277 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.
At a glance
Project
- NameTulsi Aananta
- TypeResidential / Group Housing
- Location
- Kharvai
- Badlapur
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700048896
- ReraGenie IDRG-MH-34021
Builder
- NameShree Developers
- Entity typePartnership
- PartnersBipin Ambalal Patel, Deep Sanjay Patel, Dev Vallabh Patel, Gita Kirit Patel, Haresh Gopal Bhutak, Haribhai G Chandak, Hitesh Dhayabhai Patel, Hitesh Narsingh Patel, Jigarkumar Ravibhai Patel, Kanubhai Gangaram Patel, Meet Dinesh Patel, Miten Premji Patel and 7 more
- Other registrations51 more →
- Completed21 of 52
- No longer live19 lapsed, de-registered or revoked
- Declared earlier projects9 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed81 files
Current status
Figures as on 5 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 12 | 11 | 125 | 0 | 125 |
| Wing B | NA | 15 | 14 | 152 | 0 | 152 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 25%.
Wing A48%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 50% |
Parking filed90
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A | 1 | 40 | 41 |
| Wing B | 1 | 48 | 49 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Raj Group | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing B | NA | Rs 22.21 cr | Rs 22.21 cr |
| Wing A | NA | Rs 19.90 cr | Rs 7.96 cr |
| - | NA | Rs 4.47 cr | Rs 2.24 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Raj Associates (Ar. S R Khambayat) |
| Architect | Raj Associates |
| Engineer | ER. Kamlesh R Patel |
| Engineer | Aadhar Engineers |
| Chartered Accountant | CA Rajendra Chaplot |
| Chartered Accountant | CA Ganapath jain |
| Partner | Role in project |
|---|---|
| Shree Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM_1 31-03-2026 Aananta.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: FORM-2 31-03-2026 Aananta.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Developers Tulsi Anantha Q4_compressed (1).pdf | 5 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Aananta 31_12_2025.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 Aananta.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 _SRD_compressed.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: FORM-1 Q1 Aananta.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: Form-1 Tulsi Aananta Q2.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 Aananta.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 Aananta.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Signed Form 3 Q4 Shree Developers_compressed.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Tulasi aananta Q2_compressed.pdf | 16 Jan 2026 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory 31_03_2025.pdf | 6 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 31_03_2025 Aananta_11zon.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31_03_2025 Tulsi Aananta.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aananta 31_03_2025.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 Aananta.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 Aananta.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory Q3 Aananta.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 Aananta.pdf | 31 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A Aananta.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory Aananta_11zon.pdf | 24 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Tulsi Aanantha.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 22 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062024 Aananta.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- 30062024 Aananta.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold -unsold inventory 30062024 (Aananta).pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 30062024 (Aananta)_compressed.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062024 Aananta.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 30062024 (Aananta)_compressed.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- 30062024 Aananta.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold -unsold inventory 30062024 (Aananta).pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Aananta.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Aananta.pdf | 23 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Unsold Inventory Tulsi Aanantha PH 8_compressed.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Q4 Shree Developers_compressed.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q1-Aananta.pdf | 3 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Q2-Aananta.pdf | 3 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Shree Developers-Q3_compressed.pdf | 3 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5-31MARCH2023 Aananta.pdf | 3 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-Tulsi Aananta PH 8_Apr23 To Jun23_compressed.pdf | 15 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-Tulsi Aanata PH 8_Jul23 To Sep23_Compressed.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30092023 Aananta.pdf | 1 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tulsi Aananta - Form 2.pdf | 1 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 JUN-2023 (Aananta)_compressed.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JUN-2023 (Tulsi Aananta).pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf | 4 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 DATED 31-03-2023.pdf | 3 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Tulsi Aananta 31-03-2023.pdf | 3 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 3 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Letter_compressed (1).pdf | 17 Jan 2023 |
| Building plan approvalFile: B-wing PLAN COPY.pdf | 21 Dec 2022 |
| Building plan approvalFile: A-wing PLAN COPY.pdf | 21 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: B-wing PLAN COPY.pdf | 21 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: A-wing PLAN COPY.pdf | 21 Dec 2022 |
| Copy of the legal title reportFile: Titile Report Tulsi Aananta_compressed.pdf | 9 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: SHREE RERA CERTIFICATE.pdf | 9 Dec 2022 |
| Details of encumbrances concerned to LegalFile: SHREE RERA CERTIFICATE.pdf | 9 Dec 2022 |
| Proforma of Allotment letterFile: AFS.pdf | 9 Dec 2022 |
| Other - LegalFile: SHREE RERA LETTER.pdf | 9 Dec 2022 |
| Layout approvalFile: Layout Plan_compressed.pdf | 15 Nov 2022 |
| Building plan approvalFile: Layout Plan_compressed.pdf | 15 Nov 2022 |
| PAN CardFile: PAN-Shree Developers.pdf | 15 Nov 2022 |
| Copy of the legal title reportFile: Rera Titile PH-8_compressed.pdf | 15 Nov 2022 |
| Copy of the legal title reportFile: Search Report_merged_compressed.pdf | 15 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 15 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 15 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf | 15 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Plan_compressed.pdf | 15 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf | 15 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf | 15 Nov 2022 |
| Declaration about Commencement CertificateFile: Form D.pdf | 15 Nov 2022 |
| Declaration in FORM BFile: Form B-Revised.pdf | 15 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200254362123_For_Asset_Based_Search_09_12_2022_11_32_20_779.pdf | 15 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Rera.pdf | 15 Nov 2022 |
| Proforma of Agreement for saleFile: Rera Sale Agreement.pdf | 15 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SHREE RERA BANK AC DECLERATION.pdf | 15 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf | 15 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 51 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Tulsi Aananta on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Badlapur7,600+ in Thane
Filed coordinates, straight-line distance. 177 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: Shree Developers
SHREE DEVELOPERS has 52 registrations on MahaRERA, including SHRISHRI LAKE CASTLE and MAYURESHWAR COMPLEX. Its filings disclose 9 earlier MahaRERA projects: declares 6 of 8 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Tulsi Aananta is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tulsi Aananta?
The registered promoter entity is Shree Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tulsi Aananta?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Tulsi Aananta?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tulsi Aananta?
The professionals named in the filing: Architect: Raj Associates (Ar. S R Khambayat); Architect: Raj Associates; Engineer: ER. Kamlesh R Patel; Engineer: Aadhar Engineers; Chartered Accountant: CA Rajendra Chaplot; Chartered Accountant: CA Ganapath jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tulsi Aananta?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback