Home / Browse projects / Pune, Maharashtra / Trustfort Icon
Trustfort Icon
By Trustfort realty and Infra LLP
RG-MH-19363 · RERA P52100078450 · Last updated on MahaRERA portal: 4 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Trustfort Icon is a Residential / Group Housing project by Trustfort realty and Infra LLP in Pune, Maharashtra, registered with MahaRERA as P52100078450 on 12 Dec 2024. Possession is promised by 31 Aug 2028. 21 of the 70 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameTrustfort Icon
- TypeResidential / Group Housing
- Location
- Keshavnagar
- Mundhwa
- Keshavnagar-Mundwa
- Pune City
- Pune
- 411036
- Pincode411036
- RERA no.P52100078450
- ReraGenie IDRG-MH-19363
Builder
- NameTrustfort realty and Infra LLP
- Entity typeOthers
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Dec 2024
- Promised completion31 Aug 2028
- Revised completionNone
- Buildings1 building record
- Documents filed151 files
Current status
Figures as on 4 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 23 | 20 | 70 | 0 | 70 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Building A: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed192
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Rajendra Kishan Pathare | Keshavnagar-Mundwa | Pune |
| Swati Nagesh Sawant | Keshavnagar-Mundwa | Pune |
| Sunita Kailash Kamate | Pune (M Corp.) | Pune |
| Parvati Dhondiba Pathare | Keshavnagar-Mundwa | Pune |
| Manoj Dhondiba Pathare | Keshavnagar-Mundwa | Pune |
| Ashok Dhondiba Pathare | Keshavnagar-Mundwa | Pune |
| Surekha Kailash Devkar | Keshavnagar-Mundwa | Pune |
| Anita Rajeev Kavade | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building A | NA | Rs 38.30 cr | Rs 11.50 cr |
| - | NA | Rs 9.57 cr | Rs 2.87 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anish Nawathe |
| Engineer | Ganesh Sadashiv Kulkarni |
| Engineer | Jitendra Borle |
| Chartered Accountant | Patel & Sharma |
| Chartered Accountant | Patel and Sharma Chartered Accountants |
| Chartered Accountant | R K KOTHAWALE & ASSOCIATES CHARTERED ACCOUNTANTS |
| Partner | Role in project |
|---|---|
| Trustfort realty and Infra LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2028
Documents filed151
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Trustfort Mar 26.pdf | 4 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Trustfort March 2026.pdf | 4 Jun 2026 |
| Withdrawal Update Form 3File: FORM3_MAR26_ Sign Copy.pdf | 4 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Architect certificate Dec 25.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Trustfort Dec 25.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Trustfort - Dec 25 -signed_11zon.pdf | 14 Apr 2026 |
| Layout approvalFile: 01 layout plan-hi.pdf | 29 Dec 2025 |
| Building plan approvalFile: 02 Basement 2nd Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 03 Basement 1st Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 04 Ground Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 05 Second Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 06 Sevent Refuge Floor and Sixth Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 07 Eleventh Floor and Typical Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 08 Sixteenth Floor and Twelfth Refuge Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 09 Eighteenth Floor and Seventeenth Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 10 Twentieth Floor and nine Teenth Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 11 Terracen Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 12 Elevation.pdf | 29 Dec 2025 |
| Building plan approvalFile: 13 Section AT B-B.pdf | 29 Dec 2025 |
| Layout approvalFile: 01 layout plan-hig.pdf | 29 Dec 2025 |
| Building plan approvalFile: 02 Basement 2nd Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 03 Basement 1st Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 04 Ground Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 05 Second Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 06 Sevent Refuge Floor and Sixth Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 07 Eleventh Floor and Typical Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 08 Sixteenth Floor and Twelfth Refuge Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 09 Eighteenth Floor and Seventeenth Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 10 Twentieth Floor and nine Teenth Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 11 Terracen Floor.pdf | 29 Dec 2025 |
| Building plan approvalFile: 12 Elevation.pdf | 29 Dec 2025 |
| Building plan approvalFile: 13 Section AT B-B.pdf | 29 Dec 2025 |
| Form 1File: 03 Form 1 Dec 24.pdf | 29 Dec 2025 |
| Form 2File: 02 Form 2 - dec 24.pdf | 29 Dec 2025 |
| Form 3File: 02 Form 3 - Dec 24.pdf | 29 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold - Dec 24 Signed.pdf | 29 Dec 2025 |
| Form 1File: 02 Form 1 Mar 25.pdf | 29 Dec 2025 |
| Form 2File: 03 Form 2 - Mar 25.pdf | 29 Dec 2025 |
| Form 3File: 03 Form 3 - Mar 25.pdf | 29 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold - March 25 signed.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Trustfort Sept 25.pdf | 29 Dec 2025 |
| Withdrawal Update Form 2File: Form 2- Engineer Certificate.pdf | 29 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Trustfort Sept 25.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Trustfort Sept 25.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: Form 2- Engineer Certificate.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Trustfort Sept 25.pdf | 16 Dec 2025 |
| Form 2A (FY 2024-2025)File: Engineer certificate FY 24-25.pdf | 17 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form-5 Trustfort FY 24-25.pdf | 1 Oct 2025 |
| Form 1File: Form 1 june 25.pdf | 24 Jul 2025 |
| Form 2File: Form 2 June 25.pdf | 24 Jul 2025 |
| Form 3File: Form-3 june 25.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold June 25.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mar 25.pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 25_compressed.pdf | 10 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trustfort Engg certificate.pdf | 10 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TRUSTFORT REALTY FORM 3_31_12_2024_compressed.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Rera Certificate (Trustfort Realty).pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 00 Revised Form 3 Signed_0001_Uploaded.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 00 Revised Form 3 Signed_0001_Uploaded.pdf | 10 Dec 2024 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 4 Dec 2024 |
| Other - FinanceFile: Order 61 [1].pdf | 4 Dec 2024 |
| Other - FinanceFile: Order 61 [2].pdf | 4 Dec 2024 |
| Other - TechnicalFile: Order 61 [1].pdf | 4 Dec 2024 |
| Other - TechnicalFile: Order 61 [2].pdf | 4 Dec 2024 |
| Other - TechnicalFile: Order 45 SS.pdf | 4 Dec 2024 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 4 Dec 2024 |
| Other - FinanceFile: Order 61 [1].pdf | 4 Dec 2024 |
| Other - FinanceFile: Order 61 [2].pdf | 4 Dec 2024 |
| Other - TechnicalFile: Order 61 [1].pdf | 4 Dec 2024 |
| Other - TechnicalFile: Order 61 [2].pdf | 4 Dec 2024 |
| Other - TechnicalFile: Order 45 SS.pdf | 4 Dec 2024 |
| Other - TechnicalFile: TrustFort Declaration cum Undertaking for Order 50 Uploaded.pdf | 29 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 29 Nov 2024 |
| Other - TechnicalFile: TrustFort Declaration cum Undertaking for Order 50 Uploaded.pdf | 29 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 29 Nov 2024 |
| Other - LegalFile: Document Upload List.pdf | 27 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A bank decla Ok.pdf | 27 Nov 2024 |
| Proforma of Agreement for saleFile: Trustfort Model Agreement For Sale Final.pdf | 27 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 151 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Trustfort Icon on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mundhwa13,700+ in Pune
Godrej Aqua Vista
Oxford Realty LLP
Godrej Elaris
Godrej Properties Limited
Sukhwani Hermosa Casa
Sukhwani Associates
Basil Mondale
velx constructions llp
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Builder: Trustfort realty and Infra LLP
Trustfort realty and Infra LLP has 1 registration on MahaRERA, including Trustfort Icon. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Trustfort Icon is delayed beyond 31 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Trustfort Icon?
The registered promoter entity is Trustfort realty and Infra LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Trustfort Icon?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Trustfort Icon?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Trustfort Icon?
The professionals named in the filing: Architect: Anish Nawathe; Engineer: Ganesh Sadashiv Kulkarni; Engineer: Jitendra Borle; Chartered Accountant: Patel & Sharma; Chartered Accountant: Patel and Sharma Chartered Accountants; Chartered Accountant: R K KOTHAWALE & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Trustfort Icon?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback