Home / Browse projects / Pune, Maharashtra / Trump World Center Pune

Registered No litigation declared Commercial project

Trump World Center Pune

By Enbrick Properties LLP

RG-MH-18897 · RERA P52100077843 · Last updated on MahaRERA portal: 5 Sep 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2032Possession promisedmoved 4 months by MahaRERA order
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 80%
170 of 170Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

Trump World Center Pune is a Commercial project by Enbrick Properties LLP in Pune, Maharashtra, registered with MahaRERA as P52100077843 on 7 Nov 2024. Possession is promised by 1 Apr 2032. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 0 of the 170 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameTrump World Center Pune
  • TypeCommercial
  • Location
    • Mundhawa
    • Mundhwa North
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077843
  • ReraGenie IDRG-MH-18897

Builder

  • NameEnbrick Properties LLP
  • Entity typeOthers

Key dates

this monthRegisteredNov 2024First promiseDec 2031Revised toApr 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion1 Apr 2032
  • Revised completionRevised to 1 Apr 2032 (originally 1 Dec 2031)
  • Buildings2 building records
  • Documents filed139 files

Current status

0%0 of 170 units booked
6.5%Work done, per cost certificate

Figures as on 5 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA40000
Tower 2NA39260170170

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 80%.

Tower 17%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 27%
ActivityProgress
Excavation73%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed3765

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3,765
Closed/Covered3,765
BuildingClosed/CoveredTotal
Tower 11,7001,700
Tower 22,0652,065

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,216 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
KARTIK NANDKUMAR KODREPune (M Corp.)Pune
KUNAL NANDKUMAR KODREPune (M Corp.)Pune
DEEPALI NANDKUMAR KODREPune (M Corp.)Pune
DHRUV ANAND KODREPune (M Corp.)Pune
SAKSHI ANAND KODREPune (M Corp.)Pune
POOJA ANAND KODREPune (M Corp.)Pune
ANAD PRAKASH KODREPune (M Corp.)Pune
PRAKASH DNYANOBA KODREPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI51378.37
Proposed, not sanctioned51,376 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 1 2, Ram Darshan, S. No. 46/D/1A, Aundh Road, Kirkee Pune Dist., Maharashtra.411003
Estimated costRs 396.67 cr
Cost incurredRs 25.59 cr
Work done6.45%
BuildingWingEstimatedIncurred
Tower 1NARs 187.90 crRs 11.16 cr
Tower 2NARs 187.90 crRs 11.16 cr
-NARs 20.88 crRs 3.27 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNishant Mehta
EngineerDeepak Bore
EngineerNalin Harbhare
EngineerMS GA BHILLARE Consultants Pvt Ltd
Chartered AccountantA S A K and Co Chartered Accountants
Chartered AccountantRahul Sarawgi
Chartered AccountantPatel & Sharma
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantDipali Shelar & Company
PartnerRole in project
Enbrick Properties LLP-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2031 → Apr 2032

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Apr 2032

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 TWC 2025-26 Signed Copy.pdf5 Sep 2026
Withdrawal Update Form 1File: form1.pdf7 Aug 2026
Withdrawal Update Form 2File: Form 2 June 26.pdf7 Aug 2026
Withdrawal Update Form 3File: Form 3 Dsc.pdf7 Aug 2026
Layout approvalFile: 01-Layout.pdf4 Aug 2026
Building plan approvalFile: 02 Basement.pdf4 Aug 2026
Building plan approvalFile: 03 Basement 2.pdf3 Aug 2026
Building plan approvalFile: 04 Basement 1.pdf3 Aug 2026
Building plan approvalFile: 05-Ground_rotated.pdf3 Aug 2026
Building plan approvalFile: 06 Upper Parking 1 st and 2nd.pdf3 Aug 2026
Building plan approvalFile: 07 1st 2nd 3rd 4th parking.pdf3 Aug 2026
Building plan approvalFile: 08 5th Prking.pdf3 Aug 2026
Building plan approvalFile: 09 6th Parking.pdf3 Aug 2026
Building plan approvalFile: 10-7th Parking.pdf3 Aug 2026
Building plan approvalFile: 11-8th Parking.pdf3 Aug 2026
Building plan approvalFile: 12-1st Floor.pdf3 Aug 2026
Building plan approvalFile: 13 2nd to 12th.pdf3 Aug 2026
Building plan approvalFile: 14 5th 7th14th.pdf3 Aug 2026
Building plan approvalFile: 15 15th and 16th.pdf3 Aug 2026
Building plan approvalFile: 16-17th and 18th.pdf3 Aug 2026
Building plan approvalFile: 17-19th and 20th.pdf3 Aug 2026
Building plan approvalFile: 18-21st and 22nd.pdf3 Aug 2026
Building plan approvalFile: 19-23rd 24th 25th and26th.pdf3 Aug 2026
Building plan approvalFile: 20-Comm bldg.pdf3 Aug 2026
Building plan approvalFile: 21-Comm bldg.pdf3 Aug 2026
Building plan approvalFile: 22-Comm bldg.pdf3 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf3 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf3 Aug 2026
Withdrawal Update Form 1File: form1.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2 June 26.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3 June 26.pdf30 Jul 2026
Withdrawal Update Form 1File: TWC Form 1.pdf25 May 2026
Withdrawal Update Form 2File: TWC Form 2.pdf25 May 2026
Withdrawal Update Form 3File: TWC - Form 3Sign.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 - TWC - Dec 25.pdf13 Feb 2026
Withdrawal Update Form 2File: TWC Form 2 Dec 25 Signed.pdf13 Feb 2026
Withdrawal Update Form 3File: TWC - Form 3 - Dec 25.pdf13 Feb 2026
Withdrawal Update Form 1File: Form 1 - TWC - Dec 25.pdf9 Feb 2026
Withdrawal Update Form 2File: TWC Form 2 Dec 25 Signed.pdf9 Feb 2026
Withdrawal Update Form 3File: TWC - Form 3 - Dec 25.pdf9 Feb 2026
Withdrawal Update Form 1File: Form-1 TWC Sept-25.pdf8 Dec 2025
Withdrawal Update Form 2File: Form-2 TWC Sept-25.pdf8 Dec 2025
Withdrawal Update Form 3File: Form-3 TWC Sept-25.pdf8 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_TWC Signed.pdf23 Sep 2025
Withdrawal Update Form 1File: Form 1 TWC JUNE 25.pdf19 Jul 2025
Withdrawal Update Form 1File: Form 1 TWC JUNE 25.pdf19 Jul 2025
Withdrawal Update Form 2File: TWC - Form 2 June 25.pdf19 Jul 2025
Withdrawal Update Form 2File: TWC - Form 2 June 25.pdf19 Jul 2025
Withdrawal Update Form 3File: TWC - Form 3 - June 25.pdf19 Jul 2025
Withdrawal Update Form 3File: TWC - Form 3 - June 25.pdf19 Jul 2025
Form 1File: Form 1.pdf16 Jul 2025
Form 1File: Form-1 march 25.pdf16 Jul 2025
Form 2File: Form 2 .pdf16 Jul 2025
Form 2File: Form-2 March 25.pdf16 Jul 2025
Form 3File: Form 3 dec 24.pdf16 Jul 2025
Form 3File: Form-3 mar 25 signed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: 04 Declaration for sold unsold format - Dec 24.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Declaration for sold unsold format - Mar 25.pdf16 Jul 2025
Disclosure of sold/ booked inventoryFile: Declaration for sold unsold format - Mar 25.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - TWC.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - TWC.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - TWC.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: Disl of sold unsold .pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: 04 Declaration for sold unsold format - Dec 24.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Mar 2025
Other - TechnicalFile: MUNDHWA-3_compressed_11zon.pdf28 Oct 2024
Other - FinanceFile: DECLARATION REGARDING NON ALLOCATION OF UNITS.pdf26 Oct 2024
Other - FinanceFile: 00 Declaration cum undertaking for No Bank AC.pdf26 Oct 2024
Other - TechnicalFile: CC Verification Mail.pdf26 Oct 2024
Other - TechnicalFile: DECLARATION REGARDING NON ALLOCATION OF UNITS.pdf26 Oct 2024
Other - TechnicalFile: 00 Declaration cum undertaking for No Bank AC.pdf26 Oct 2024
Declaration in FORM BFile: Form B - Promoter.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised compressed.pdf23 Oct 2024
Declaration about Commencement CertificateFile: Decl about CC Final.pdf23 Oct 2024
Other - TechnicalFile: Clarification regarding No Of Parking.pdf23 Oct 2024
Other - TechnicalFile: Order 50.pdf23 Oct 2024

How this compares with Pune

0%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 4 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Trump World Center Pune on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhawa14,000+ in Pune

2 kmTrump World Center PuneCompleted 78Lapsed / revoked 19Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 207 registered projects within 2 km.

Builder: Enbrick Properties LLP

Enbrick Properties LLP has 1 registration on MahaRERA, including Trump World Center Pune. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Trump World Center Pune is delayed beyond 1 Apr 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Trump World Center Pune?

The registered promoter entity is Enbrick Properties LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Trump World Center Pune?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Trump World Center Pune?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Trump World Center Pune?

The professionals named in the filing: Architect: Nishant Mehta; Engineer: Deepak Bore; Engineer: Nalin Harbhare; Engineer: MS GA BHILLARE Consultants Pvt Ltd; Chartered Accountant: A S A K and Co Chartered Accountants; Chartered Accountant: Rahul Sarawgi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trump World Center Pune?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trump World Center Pune. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trump World Center Pune to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.