Completed No litigation declared Residential / Group Housing project

TRISHALA

By RAINBOW PROPERTIES

RG-MH-18793 · RERA P52100077604 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
32 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 163 documents Report an error

TRISHALA is a Residential / Group Housing project by RAINBOW PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100077604 on 15 Oct 2024. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 0 of the 32 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameTRISHALA
  • TypeResidential / Group Housing
  • Location
    • Pune Satara Road
    • Gultekadi
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411037
  • Pincode411037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077604
  • ReraGenie IDRG-MH-18793

Builder

  • NameRAINBOW PROPERTIES
  • Entity typePartnership
  • PartnersVilas Chhaganlal Rathod, Peenal Pritam Rathod

Key dates

this monthRegisteredOct 2024First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Oct 2024
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed163 files

Current status

0%0 of 32 units booked
100.0%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRISHALANA10832032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

TRISHALA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed156

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots156
Closed/Covered156

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,562 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025
LandownerVillageDistrict
MAHINDRA MANMAL KOTHARIPune (M Corp.)Pune
PRAVIN MANMAL KOTHARIPune (M Corp.)Pune
PUSHPA PRAVIN KOTHARIPune (M Corp.)Pune
ROHIT PRAVIN KOTHARIPune (M Corp.)Pune
SUCHETA ROHIT KOTHARIPune (M Corp.)Pune
NIRANJAN PRAVIN KOTHARIPune (M Corp.)Pune
SHWETA NIRANJAN KOTHARIPune (M Corp.)Pune
GAYATRI VIKASKUMAR SONIGARAPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI4328.87
Proposed, not sanctioned4,286 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD
Estimated costRs 21.37 cr
Cost incurredRs 21.37 cr
Work done100.0%
BuildingWingEstimatedIncurred
TRISHALANARs 20.19 crRs 20.19 cr
-NARs 1.18 crRs 1.18 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCrystal Arch
ArchitectAbhikalpan Architects and Planners
EngineerGanesh S Kadam S Kadam
Chartered AccountantCA Madhusudan Jhanwar Jhanwar
Chartered AccountantV A Dudhediya And Associates
PartnerRole in project
RAINBOW PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04022619712Dec 2025 → Jun 2026

Reason as filed by the promoterWe respectfully submit that the application along with requisite documents for issuance/obtaining of the Completion Certificate has already been submitted to the Pune Municipal Corporation. However, the said Completion Certificate has not yet been issued. Due to the Pune Municipal Corporation elections and the enforcement of the Model Code of Conduct (Achar Sanhita), several municipal employees were not available for official work, and the processing of files and approvals was consequently delayed. Despite timely submission of the file and regular follow-ups from our side, the approval remains

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed163

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 163 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Certificated.pdf19 Jun 2026
Occupational CertificateFile: Trishala Completion Verification SS.pdf19 Jun 2026
Occupational CertificateFile: Form 1 Trishala.pdf19 Jun 2026
Occupational CertificateFile: Form 2 Trishala.pdf19 Jun 2026
Occupational CertificateFile: Form 3 Trishala.pdf19 Jun 2026
Form 1File: Trishala Dec 2024 Form 1.pdf16 Jun 2026
Form 2File: Trishala Dec 2024 Form 2.pdf16 Jun 2026
Form 3File: Trishala Dec 2024 Form 3.pdf16 Jun 2026
Disclosure of Sold and Booked InventoryFile: Trishala Sold Unsold Dec 2024.pdf16 Jun 2026
Form 1File: Trishala Mar 2025 Form 1.pdf16 Jun 2026
Form 2File: Trishala Mar 2025 Form 2.pdf16 Jun 2026
Form 3File: Trishala Mar 2025 From3.pdf16 Jun 2026
Disclosure of Sold and Booked InventoryFile: Trishala mar 2025 Sold unsold.pdf16 Jun 2026
Form 2A (FY 2025-2026)File: Rainbow Properties - Form 2A (1).pdf16 Jun 2026
Withdrawal Update Form 1File: Rainbow Properties Form 1 (1).pdf22 Apr 2026
Withdrawal Update Form 2File: Trishila Form 2 s.pdf22 Apr 2026
Withdrawal Update Form 3File: Trishala Form 3 March 26_compressed.pdf22 Apr 2026
Form 2A (FY 2024-2025)File: Rainbow Properties Form 2 2024-2024 (1).pdf27 Mar 2026
Form 5 (FY 2024-2025)File: RAINBOW PROPERTIES FORM 5 (2).pdf21 Mar 2026
Withdrawal Update Form 14 Feb 2026
Withdrawal Update Form 24 Feb 2026
Withdrawal Update Form 34 Feb 2026
Withdrawal Update Form 1File: Form 1_Trishala_Sep-25.pdf15 Oct 2025
Withdrawal Update Form 1File: Form 1_Trishala_Sep-25.pdf15 Oct 2025
Withdrawal Update Form 2File: Form 2_Trishala_Sep-25.pdf15 Oct 2025
Withdrawal Update Form 2File: Form 2_Trishala_Sep-25.pdf15 Oct 2025
Withdrawal Update Form 3File: RERA Form 3_Trishala_Jun-25.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 3_Trishala_Sep-25.pdf15 Oct 2025
Withdrawal Update Form 1File: RERA Form 1_Trishala_Jun-25.pdf22 Jul 2025
Withdrawal Update Form 2File: RERA Form 2_Trishala_Jun-25.pdf22 Jul 2025
Withdrawal Update Form 3File: RERA Form 3_Trishala_Jun-25.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Trishala_Q4_24-25.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Trishala_Q4_24-25.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Trishala_Q4_24-25.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory_Trishala_March-25.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Trishala_Q3 24-25.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Trishala_Q3 24-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Trishala_Q3 24-25.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory_Trishala_Dec-24.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Trishala_Q3 24-25.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Trishala_Q3 24-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Trishala_Q3 24-25.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory_Trishala_Dec-24.pdf21 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Trishala.pdf7 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Trishala.pdf7 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Trishala.pdf7 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Trishala.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trishala_Form 1_Sep-24.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trishala_Form 1_Sep-24.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trishala_Form 1_Sep-24.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trishala_Form 1_Sep-24.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Trishala_Form 3_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 2_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 1_Sep-24.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Trishala_Form 2A.pdf26 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Trishala_Form 5.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Trishala_Form 3_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 2_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 1_Sep-24.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Trishala_Form 2A.pdf26 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Trishala_Form 5.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Trishala_Form 3_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 1_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 2_Sep-24.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Trishala_Form 2A.pdf26 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Trishala_Form 5.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Trishala_Form 3_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 1_Sep-24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trishala_Form 2_Sep-24.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Trishala_Form 2A.pdf26 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Trishala_Form 5.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: Trishala_Disclosure of Sold booked Inventory_Sep-24.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Trishala_Disclosure of Sold booked Inventory_Sep-24.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Trishala_Disclosure of Sold booked Inventory_Sep-24.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Trishala_Disclosure of Sold booked Inventory_Sep-24.pdf12 Nov 2024
Declaration in FORM BFile: FORM -B -Rainbow Properties.pdf10 Oct 2024
Declaration in FORM BFile: FORM - B - Mahindra Kothari.pdf10 Oct 2024
Declaration in FORM BFile: FORM - B -Pravin Kothari.pdf10 Oct 2024
Declaration in FORM BFile: FORM -B -Rainbow Properties.pdf10 Oct 2024
Declaration in FORM BFile: FORM - B - Mahindra Kothari.pdf10 Oct 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRISHALA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gultekadi13,700+ in Pune

2 kmTRISHALACompleted 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: RAINBOW PROPERTIES

RAINBOW PROPERTIES has 1 registration on MahaRERA, including TRISHALA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TRISHALA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRISHALA?

The registered promoter entity is RAINBOW PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRISHALA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRISHALA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRISHALA?

The professionals named in the filing: Architect: Crystal Arch; Architect: Abhikalpan Architects and Planners; Engineer: Ganesh S Kadam S Kadam; Chartered Accountant: CA Madhusudan Jhanwar Jhanwar; Chartered Accountant: V A Dudhediya And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRISHALA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRISHALA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRISHALA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.