Home / Browse projects / Thane, Maharashtra / Trinity - Shashank Saptshrung

Registered No litigation declared Others project

Trinity - Shashank Saptshrung

By RADHIKA CONSTRUCTION COMPANY

RG-MH-07221 · RERA P51700055300 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 45%
57 of 85Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Trinity - Shashank Saptshrung is a Others project by RADHIKA CONSTRUCTION COMPANY in Thane, Maharashtra, registered with MahaRERA as P51700055300 on 14 Mar 2024. Possession is promised by 31 Aug 2028. 28 of the 85 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameTrinity - Shashank Saptshrung
  • TypeOthers
  • Location
    • DEVI CHOWK SHASHTRI NAGAR
    • dombivli west
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055300
  • ReraGenie IDRG-MH-07221

Builder

  • NameRADHIKA CONSTRUCTION COMPANY
  • Entity typePartnership
  • GSTIN27ABDFR2279J1ZU
  • PartnerRADHIKA SHRIKRISHNA MARATHE

Key dates

this monthRegisteredMar 2024PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Aug 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

33%28 of 85 units booked

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRINITY - SHASHANK SAPTASHRUNGNA111179685

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

TRINITY - SHASHANK SAPTASHRUNG: 31% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
SHASHANK CO.OP. HSG SCTY LTDDOMBIVLIThane
SAPTASHRUNG CO.OP HSG. SCTY LTDDOMBIVLIThane

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI9667.32
Proposed, not sanctioned5,845 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchP-78, MIDC RESIDENTIAL AREA , NEXT TO MAMTA HOSPITAL DOMBIVLI EAST, 421203

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE ENVIRO ARCHITECTS
EngineerENTECH ENGINEERS
Chartered Accountantankur sangoi & associates
Chartered AccountantNIKITA
PartnerRole in project
RADHIKA CONSTRUCTION COMPANY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2028

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: (Form 1)_Architect Certificate_Trinity_31 Dec 2025.pdf2 May 2026
Form 2File: Form 2 Engimeer Certificate_Merged for Soc and Salable.pdf2 May 2026
Form 3File: (Form 3)_Trinity_Dec 2025_Final_signed.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory as on 31 Dec 2025.pdf2 May 2026
OthersFile: Unsold Inventory as on 31 Dec 2025.pdf2 May 2026
Form 1File: Architect's Certificate FOR 30 JUNE 2024.pdf20 Nov 2025
Form 2File: ENGINEERS CERTIFICATE 15-07-24.pdf20 Nov 2025
Form 3File: Form 3 Trinity for june 2024Signed.pdf20 Nov 2025
OthersFile: ENGINEERS CERTIFICATE F-2 15-07-24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold_merged.pdf20 Nov 2025
Form 1File: FORM -1 TRINITY 30 SEPT 24.pdf20 Nov 2025
Form 2File: Form 2 merged.pdf20 Nov 2025
Form 3File: FORM 3 TRINITY 11 NOV_Signed.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Merged.pdf20 Nov 2025
OthersFile: Trinity Society member new flat allotment1 (1).pdf20 Nov 2025
Form 3File: TRINITY FORM 3.pdf20 Nov 2025
Form 1File: Form 1 Architect's Certificate.pdf20 Nov 2025
Form 2File: Form 2Merged.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Merged.pdf20 Nov 2025
Form 1File: Form -1 as on 31-3-25.pdf20 Nov 2025
Form 3File: Form 3 Signed.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory as on 31-3-25.pdf20 Nov 2025
OthersFile: Form 2A as on 31-3-25.pdf20 Nov 2025
Form 2File: Form 2 Merged.pdf20 Nov 2025
Form 1File: Trinity Architect Certificate 30sept 2025.pdf8 Nov 2025
Form 2File: trinity Engineer Certificate Saleable Area 30 sept 2025.pdf8 Nov 2025
OthersFile: Trinity Form 2 Society Members 30 sept 2025.pdf8 Nov 2025
Form 3File: Form 3 Trinity Sep 2025_Final Signed.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Final Trinity Sold Inventory 30 sept 2025.pdf8 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: 6 Disclosure of sold booked inventory_compressed.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2024-25).pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TRINITY FORM 3 FOR DEC 24.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 trinity Dec 24.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Saleble area Trinity dec24.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Society - trinity dec 24.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: TRINITY SOLD INVENTORY AS ON DEC24.pdf3 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A' Trinity.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Trinity for june 2024Signed_compressed.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 TRINITY FOR MARCH 2024.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TRINITY 11 NOV_Signed.pdf11 Nov 2024
Details of encumbrances concerned to FinanceFile: final Encumbrance Regarding Finance trinity.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Trinity Inventary certificate on 30sept 2024.pdf9 Nov 2024
CERSAI detailsFile: CERSAI_Search_Report_200327050394_For_Debtor_Based_Search_09_11_2024_15_48_55_637.pdf9 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format -A Bank Declaration.pdf9 Nov 2024
Details of encumbrances concerned to LegalFile: final Encumbrance Regarding Finance trinity.pdf9 Nov 2024
Deviation Report with respect to model copy of AgreementFile: RERA DRAFT OF TRINITY PROJECT.pdf9 Nov 2024
Deviation Report with respect to model copy of AgreementFile: trinity RERA AGREEMENT daviation.pdf9 Nov 2024
Proforma of Agreement for saleFile: RERA DRAFT OF TRINITY PROJECT.pdf9 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: ICICI Format B.pdf9 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: final Disclosure for Secured finance aviled for Trinity.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 TRINITY 30 SEPT 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 TRINITY Society Member 30SEPT 2024.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 TRINITY Saleable Area 30 SEPT 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: tRINITYFORM 1 FOR MARCH 2024.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: tRINITY Architect's Certificate FOR 30 JUNE 2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 FOR SALEABLE AREA AVAILABLE FOR TRINITY.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 FOR OLD SCTY MEMBERS TRINITY.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 TRINITY FOR FLAT ALLOTED TO OLDMEMBERS FOR MARCH 2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: tRINITY fORM 2 fOR SALEABLE AREA TO TRINITY FOR mARCH 2024.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF UNSOLD INVENTORY TRINITY.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY AS ON 30 JUNE 2024.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A TRINITY 31 MARCH 2024.pdf11 Oct 2024
Copy of the legal title reportFile: Title ReporT SHASHANK NEW.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration Regarding Encumbrances_Finance.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration Regarding Encumbrances_Legal.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration Regarding Encumbrances_Finance.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration Regarding Encumbrances_Legal.pdf22 Feb 2024
Declaration in FORM BFile: FORM B OF TRINITY.pdf22 Feb 2024
CERSAI detailsFile: CERSAI UNDERTAKING.pdf22 Feb 2024
CERSAI detailsFile: Asset Based Search trinity 22 feb 2024.pdf22 Feb 2024
CERSAI detailsFile: cersai mail extract.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 signed and scanned (1).pdf22 Feb 2024
Proforma of Agreement for saleFile: TRNITY SALE AGREEMENT.pdf22 Feb 2024
Deviation Report with respect to model copy of AgreementFile: DAVIATION AFFIDAVIT FINAL.pdf22 Feb 2024
Other - LegalFile: Radhika Construction Co Partnership Deed.pdf22 Feb 2024
Other - TechnicalFile: trinity Declaration Cum Undertaking as per order 50-2024.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ( COST FOR SALEABLE AREA).pdf3 Feb 2024

How this compares with Thane

33%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Trinity - Shashank Saptshrung on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near dombivli west7,600+ in Thane

2 kmTrinity - Shashank SaptsCompleted 82Lapsed / revoked 76Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: RADHIKA CONSTRUCTION COMPANY

RADHIKA CONSTRUCTION COMPANY has 1 registration on MahaRERA, including Trinity - Shashank Saptshrung. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Trinity - Shashank Saptshrung is delayed beyond 31 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Trinity - Shashank Saptshrung?

The registered promoter entity is RADHIKA CONSTRUCTION COMPANY, a partnership as per the filing. Its GSTIN 27ABDFR2279J1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Trinity - Shashank Saptshrung?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Trinity - Shashank Saptshrung?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Trinity - Shashank Saptshrung?

The professionals named in the filing: Architect: SPACE ENVIRO ARCHITECTS; Engineer: ENTECH ENGINEERS; Chartered Accountant: ankur sangoi & associates; Chartered Accountant: NIKITA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trinity - Shashank Saptshrung?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trinity - Shashank Saptshrung. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trinity - Shashank Saptshrung to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.