Home / Browse projects / Thane, Maharashtra / Amar Galaxy Bldg No. 2 Wing B and C
Amar Galaxy Bldg No. 2 Wing B and C
By AMAR REALTY
RG-MH-31345 · RERA P51700079679 · Last updated on MahaRERA portal: 9 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 60.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amar Galaxy Bldg No. 2 Wing B and C is a Others project by AMAR REALTY in Thane, Maharashtra, registered with MahaRERA as P51700079679 on 20 Mar 2025. Possession is promised by 31 Dec 2029. 40 of the 243 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.
At a glance
Project
- NameAmar Galaxy Bldg No. 2 Wing B and C
- TypeOthers
- Location
- Shivaji Path No 2
- Cholegaon
- Near Raj Vaibhav Complex
- DOMBIVLI
- Kalyan
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700079679
- ReraGenie IDRG-MH-31345
Builder
- NameAMAR REALTY
- Entity typePartnership
- GSTIN27AATFA3657L1ZT
- PartnersRANJAN ASHOK PATEL, DAMJI MURJI RAVAT, HARESH ANANDJI PATEL, PRADEEP MAHADU JOSHI, HARILAL MURJI RAVAT, MUKHTAR RASUL KHAN, ASHOK SHAMJI PATEL, ZAKIR MUKHTAR KHAN, KANTABEN ANANDJI PATEL, SHAILESH ANANDJI PATEL, HITESH PRADEEP JOSHI, DHIREN SHAMJI PATEL
- Other registrations3 more →
- Completed2 of 4
- Past their filed date1
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Mar 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings2 building records
- Documents filed65 files
Current status
Figures as on 9 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Amar Galaxy Bldg No 2 Wing B | NA | 18 | 16 | 131 | 8 | 139 |
| Amar Galaxy Bldg No 2 Wing C | NA | 16 | 14 | 92 | 12 | 104 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
Amar Galaxy Bldg No 2 Wing B9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Amar Galaxy Bldg No 2 Wing C9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed427
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Amar Galaxy Bldg No 2 Wing B | 257 | 257 |
| Amar Galaxy Bldg No 2 Wing C | 170 | 170 |
Land and ownership142
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Salil Tulshiram Joshi | DOMBIVLI | Thane |
| Paresh Tulshiram Joshi | DOMBIVLI | Thane |
| Arun Maruti Joshi | DOMBIVLI | Thane |
| Atul Ramdas Joshi | DOMBIVLI | Thane |
| Shalik Shantaram Joshi | DOMBIVLI | Thane |
| Suresh Shantaram Joshi | DOMBIVLI | Thane |
| Ashok Shantaram Joshi | DOMBIVLI | Thane |
| Shridhar Shantaram Joshi | DOMBIVLI | Thane |
| Anjan Shantaram Joshi | DOMBIVLI | Thane |
| Krishna Gangaram Kathe | DOMBIVLI | Thane |
| Reshma Ramesh Kathe | DOMBIVLI | Thane |
| Gurunath Kalu Choudhari | DOMBIVLI | Thane |
| Prathamesh Harishchandra Choudhari | DOMBIVLI | Thane |
| Jeevan Tukaram Joshi | DOMBIVLI | Thane |
| Jaywant Mukund Joshi | DOMBIVLI | Thane |
| Nirmala Balkrishna Joshi | DOMBIVLI | Thane |
| Satyawan Balkrishna Joshi | DOMBIVLI | Thane |
| Nivruti Balkrishna Joshi | DOMBIVLI | Thane |
| Amol Balkrishna Joshi | DOMBIVLI | Thane |
| Sangita Hanuman Joshi | DOMBIVLI | Thane |
| Jitendra Hanuman Joshi | DOMBIVLI | Thane |
| Pramila Mohan Joshi | DOMBIVLI | Thane |
| Somnath Mohan Joshi | DOMBIVLI | Thane |
| Gurunath Mohan Joshi | DOMBIVLI | Thane |
| Rajendra Kalu Choudhari | DOMBIVLI | Thane |
| Vijay Motiram Joshi | DOMBIVLI | Thane |
| Ranjita A. Joshi (Bhoir) | DOMBIVLI | Thane |
| Ravi Pundalik Joshi | DOMBIVLI | Thane |
| Barkibai Gulab Joshi | DOMBIVLI | Thane |
| Amrut Sadashiv Joshi | DOMBIVLI | Thane |
| Krishna Sadashiv Joshi | DOMBIVLI | Thane |
| Ramkrishna Sudam Joshi | DOMBIVLI | Thane |
| Pramod Tukaram Joshi | DOMBIVLI | Thane |
| Krushna Sadashiv Joshi | DOMBIVLI | Thane |
| Shevantabai Kalu Chaudhary | DOMBIVLI | Thane |
| Prabhakar Kisan Chaudhary | DOMBIVLI | Thane |
| Sainath Kisan Chaudhary | DOMBIVLI | Thane |
| Meghnath Kisan Chaudhary | DOMBIVLI | Thane |
| Ratna Adesh Baji | DOMBIVLI | Thane |
| Sonali Kisan Chaudhary | DOMBIVLI | Thane |
| Hausa Harishchandra Chaudhary | DOMBIVLI | Thane |
| Anita Sunil Joshi | DOMBIVLI | Thane |
| Kavita Savan Bhoir | DOMBIVLI | Thane |
| NANUBAI BALIRAM JOSHI | DOMBIVLI | Thane |
| RANJANA MANOHAR PISEKAR | Badlapur (M Cl) | Thane |
| NANDA BHASKAR GAYKWAD | Tisgaon | Thane |
| ANITA ABHIMANYU PATIL | DOMBIVLI | Thane |
| HAUSABAI SHANTARAM JOSHI | DOMBIVLI | Thane |
| PUSHPA SUBHASH RANE | DOMBIVLI | Thane |
| BABY JEEVAN KENE | DOMBIVLI | Thane |
| VIJAYA BALARAM KATHE | DOMBIVLI | Thane |
| BHAGUBAI GANGARAM KATHE | DOMBIVLI | Thane |
| RAJESH BALARAM KATHE | DOMBIVLI | Thane |
| DILIP SHANTARAM JOSHI | DOMBIVLI | Thane |
| SARITA ARVIND BHOIR | DOMBIVLI | Thane |
| RAVINDRA BALARAM KATHE | DOMBIVLI | Thane |
| MAYURESH RAMESH KATHE | DOMBIVLI | Thane |
| NIKITA RAMESH KATHE | DOMBIVLI | Thane |
| MITESH RAMESH KATHE | DOMBIVLI | Thane |
| ARCHANA KIRAN JAMDALKAR | DOMBIVLI | Thane |
| SHUBHAM HANUMAN JOSHI | DOMBIVLI | Thane |
| DARSHANA CHARANDAS MHATRE | DOMBIVLI | Thane |
| HEMA UTTAM PATIL | DOMBIVLI | Thane |
| MEGHA MURLIDHAR BHOIR | DOMBIVLI | Thane |
| ROHINI SUNIL RANE | DOMBIVLI | Thane |
| DATTU GOPAL JOSHI | DOMBIVLI | Thane |
| MANISHA MACCHINDRA JOSHI | DOMBIVLI | Thane |
| RAJ MACCHINDRA JOSHI | DOMBIVLI | Thane |
| BHASKAR GOPAL JOSHI | DOMBIVLI | Thane |
| MOTIRAM GOPAL JOSHI | DOMBIVLI | Thane |
| APARNA MANISH PATIL | DOMBIVLI | Thane |
| SHWETA AMIT PATIL | DOMBIVLI | Thane |
| MAYUR ABHIMANYU THAKUR | DOMBIVLI | Thane |
| INDIRABAI TUKARAM JOSHI | DOMBIVLI | Thane |
| RAMAKANT TUKARAM JOSHI | DOMBIVLI | Thane |
| Nirabai Sahadev Mhatre | DOMBIVLI | Thane |
| Devkibai Gopinath Chaudhari | DOMBIVLI | Thane |
| Suresh Gopinath Chaudhary | DOMBIVLI | Thane |
| Deepak Gopinath Chaudhary | DOMBIVLI | Thane |
| Sunita Gopinath Chaudhary | DOMBIVLI | Thane |
| Nirmala Bhagwan Patil | DOMBIVLI | Thane |
| Ranjita Hemant Patil | DOMBIVLI | Thane |
| Yogita Manoj Patil | DOMBIVLI | Thane |
| Surekha Eknath Patil | DOMBIVLI | Thane |
| Matubai Kundalik Joshi | DOMBIVLI | Thane |
| Sharada Sharad Bhopi | DOMBIVLI | Thane |
| Pramila Alias Laxmi Gajanan Bhavare | Neral | Raigarh |
| Suvarna Manish Patil | Thane (M Corp.) | Thane |
| Rina Eknath Wayale | Kalyan | Thane |
| Sandeep Suresh Modak | Neral | Raigarh |
| Shakuntala Gajanan Joshi | DOMBIVLI | Thane |
| Pandurang Gajajnan Joshi | DOMBIVLI | Thane |
| Renuka Prakash Joshi | DOMBIVLI | Thane |
| Tejas Prakash Joshi | DOMBIVLI | Thane |
| Tejaswini Haridas Mhatre | DOMBIVLI | Thane |
| Sunil Gajanan Joshi | DOMBIVLI | Thane |
| Lilbai Shanidas Gaykar | DOMBIVLI | Thane |
| Manisha Tulshiram Desale | DOMBIVLI | Thane |
| Sunanda Chandrasen Mhatre | DOMBIVLI | Thane |
| Bayabai Anant Joshi | DOMBIVLI | Thane |
| Sangita Anant Joshi | DOMBIVLI | Thane |
| Kavita Anant Joshi | DOMBIVLI | Thane |
| Anusaya Waman Jadhav | DOMBIVLI | Thane |
| Venu Motiram Joshi | DOMBIVLI | Thane |
| Dinesh Motiram Joshi | DOMBIVLI | Thane |
| Harshada Bandu Patil | DOMBIVLI | Thane |
| Balaram Mangalya Joshi | DOMBIVLI | Thane |
| Dattu Manglya Joshi | DOMBIVLI | Thane |
| MacchindraMangalya Joshi | DOMBIVLI | Thane |
| Ramesh Manglya Joshi | DOMBIVLI | Thane |
| Mukund Manglya Joshi | DOMBIVLI | Thane |
| Anjani Gajanan Mhatre | DOMBIVLI | Thane |
| Surekha Ramesh Jadhav | DOMBIVLI | Thane |
| Anandibai Hari Joshi | DOMBIVLI | Thane |
| Sangita Yuvraj Joshi | DOMBIVLI | Thane |
| Karan Yuvraj Joshi | DOMBIVLI | Thane |
| Bhushan Yuvraj Joshi | DOMBIVLI | Thane |
| Jayant Hari Joshi | DOMBIVLI | Thane |
| Shaila Yashodhar Pusalkar | DOMBIVLI | Thane |
| Nanda Chandrakant Mhatre | DOMBIVLI | Thane |
| Yamunabai Kundalik Patil | DOMBIVLI | Thane |
| Manda Ramdas Joshi | DOMBIVLI | Thane |
| Amit Ramdas Joshi | DOMBIVLI | Thane |
| Vishakha Pravin Patil | DOMBIVLI | Thane |
| Shevantabai Shantaram Mhatre | DOMBIVLI | Thane |
| Anita Baban Patil | Vehele | Thane |
| Yogita Baban Patil | Vehele | Thane |
| Dipa Baban Patil | Vehele | Thane |
| Raju Baban Patil | Vehele | Thane |
| Vijay Baban Patil | Vehele | Thane |
| Dropadabai Alias Lilabai Maruti Bhoir | DOMBIVLI | Thane |
| Pramila Prakash Mhatre | kon (CT) | Thane |
| Laxmi Sopan Mali | DOMBIVLI | Thane |
| Ashok Shnataram Mhatre | DOMBIVLI | Thane |
| Shyam Shnataram Mhatre | Kalyan | Thane |
| Urmila Arjun Mhatre | DOMBIVLI | Thane |
| Kiran Shantaram Mhatre | DOMBIVLI | Thane |
| Vandana Dilip Bhoir | DOMBIVLI | Thane |
| Komal Karesh Mhatre | DOMBIVLI | Thane |
| Ganesh Dilip Bhoir | DOMBIVLI | Thane |
| Chirag Dilip Bhoir | DOMBIVLI | Thane |
| Dattatray Gulab Joshi | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Amar Galaxy Bldg No 2 Wing B | NA | Rs 37.48 cr | Rs 1.98 cr |
| Amar Galaxy Bldg No 2 Wing C | NA | Rs 25.23 cr | Rs 1.37 cr |
| - | NA | Rs 3.69 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R K Associates |
| Engineer | Associate Structural Engineers LLP |
| Chartered Accountant | V S KASLIWAL & CO |
| Chartered Accountant | PATWARDHAN SHEKHAWAT & ASSOCIATES |
| Chartered Accountant | Sachin Maheshwari and Co |
| Partner | Role in project |
|---|---|
| AMAR REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Q4Form1.pdf | 9 Jul 2026 |
| Withdrawal Update Form 2File: Q4Form2.pdf | 9 Jul 2026 |
| Withdrawal Update Form 3File: Q4Form3.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Q3Form1.pdf | 4 Jul 2026 |
| Withdrawal Update Form 2File: Q3Form2.pdf | 4 Jul 2026 |
| Withdrawal Update Form 3File: Q3Form3.pdf | 4 Jul 2026 |
| Withdrawal Update Form 1File: Q2Form1.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: Q2Form2.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Q2Form3.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Q1Form1.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Q1Form2.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: Q1Form3.pdf | 25 Jun 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Amar Galaxy II.pdf | 6 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert_compressed.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold_compressed.pdf | 13 May 2025 |
| Other - FinanceFile: 1 Other - Finance.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: Form B - Promoter.pdf | 9 Mar 2025 |
| Copy of the legal title reportFile: 1 Legal Title 1.pdf | 24 Feb 2025 |
| Copy of the legal title reportFile: 2 Legal Title 2.pdf | 24 Feb 2025 |
| Copy of the legal title reportFile: 3 Legal Title 3.pdf | 24 Feb 2025 |
| Copy of the legal title reportFile: 4 Legal Title 4.pdf | 24 Feb 2025 |
| Copy of the legal title reportFile: 5 Legal Title 5.pdf | 24 Feb 2025 |
| Other - LegalFile: 7-12 Extract Total.pdf | 24 Feb 2025 |
| Other - FinanceFile: 5 Land Valuation.pdf | 14 Feb 2025 |
| Other - TechnicalFile: 3 Parking and Flat Clarification.pdf | 13 Feb 2025 |
| Other - TechnicalFile: COMMENCEMENT FORM D _0001.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30 Form 3 CA Certificate.pdf | 9 Dec 2024 |
| Building plan approvalFile: Highlights Area.pdf | 7 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Highlights Area.pdf | 7 Dec 2024 |
| Building plan approvalFile: Block Plan Layout.pdf | 8 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Block Plan Layout.pdf | 8 Nov 2024 |
| Other - TechnicalFile: Annexure A.pdf | 8 Nov 2024 |
| Other - TechnicalFile: Declaration Clarification.pdf | 8 Nov 2024 |
| Other - TechnicalFile: KDMC Mail.pdf | 8 Nov 2024 |
| Other - TechnicalFile: KDMC Website.pdf | 8 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances.pdf | 6 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16 Form 1 Arch.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 21 FORM 2 ENG.pdf | 6 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 41 Format A.pdf | 6 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances.pdf | 6 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 27 Disclosure of Interest.pdf | 6 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 42 Format B.pdf | 6 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: 23 Disclosure of Finance.pdf | 6 Nov 2024 |
| Layout approvalFile: 5 Layout.pdf | 29 Oct 2024 |
| Building plan approvalFile: 6 Building Plan 2.pdf | 29 Oct 2024 |
| Building plan approvalFile: 6 Building Plan 3.pdf | 29 Oct 2024 |
| Building plan approvalFile: 6 Building Plan 4.pdf | 29 Oct 2024 |
| Building plan approvalFile: 6 Building Plan 5.pdf | 29 Oct 2024 |
| Building plan approvalFile: 6 Building Plan 6.pdf | 29 Oct 2024 |
| PAN CardFile: PAN.pdf | 29 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: 5 Layout.pdf | 29 Oct 2024 |
| Proforma of Allotment letterFile: 36 Draft Allotment Letter.pdf | 29 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 12 Commencement Certificate.pdf | 29 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 6.pdf | 29 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 4.pdf | 29 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 3.pdf | 29 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 2.pdf | 29 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 5.pdf | 29 Oct 2024 |
| Declaration about Commencement CertificateFile: 13 Declaration for Commencement.pdf | 29 Oct 2024 |
| CERSAI detailsFile: 25 Declaration for CERSAI.pdf | 29 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: 44 Deviation Report Allotment Letter.pdf | 29 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: 45 Deviation Report Agreement for Sale.pdf | 29 Oct 2024 |
| Proforma of Agreement for saleFile: 35 Draft Agreement for Sale.pdf | 29 Oct 2024 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| AMAR ELEGANCEP51700031419 | Ganesh Nagar, Dombivli West, Thane | 134 | Oct 2021 | Ongoing | Dec 2025 | Not delivered |
| AMAR GALAXY PHASE - IP51700019634 | Ganesh Nagar, Thane | - | Feb 2019 | Completed | Nov 2024Registered original: Dec 2023 | Nov 2024 |
| RAJ VAIBHAV NX | RAJU NAGAR DOMBIVLI WEST | 590 | - | Completed | Dec 2020 | Aug 2020 |
| NANA VISHNU HEIGHTS | RAJU NAGAR DOMBIVLI WEST | 160 | - | Completed | Dec 2019 | Nov 2019 |
| AMAR ORCHID | RAJU NAGAR DOMBIVLI WEST | 50 | - | Completed | Jun 2018 | Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Amar Galaxy Bldg No. 2 Wing B and C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Cholegaon, Near Raj Vaibhav Complex7,600+ in Thane
Filed coordinates, straight-line distance. 175 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
Vaishnavi Garden
Vaishnavi Infra Developers
See every Thane project, with the district possession charts
Builder: AMAR REALTY
AMAR REALTY has 4 registrations on MahaRERA, including AMAR ORCHID and AMAR GALAXY PHASE - I. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Amar Galaxy Bldg No. 2 Wing B and C is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amar Galaxy Bldg No. 2 Wing B and C?
The registered promoter entity is AMAR REALTY, a partnership as per the filing. Its GSTIN 27AATFA3657L1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amar Galaxy Bldg No. 2 Wing B and C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Amar Galaxy Bldg No. 2 Wing B and C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amar Galaxy Bldg No. 2 Wing B and C?
The professionals named in the filing: Architect: R K Associates; Engineer: Associate Structural Engineers LLP; Chartered Accountant: V S KASLIWAL & CO; Chartered Accountant: PATWARDHAN SHEKHAWAT & ASSOCIATES; Chartered Accountant: Sachin Maheshwari and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amar Galaxy Bldg No. 2 Wing B and C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback