Red flags

  • Rs 60.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
203 of 243Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Amar Galaxy Bldg No. 2 Wing B and C is a Others project by AMAR REALTY in Thane, Maharashtra, registered with MahaRERA as P51700079679 on 20 Mar 2025. Possession is promised by 31 Dec 2029. 40 of the 243 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameAmar Galaxy Bldg No. 2 Wing B and C
  • TypeOthers
  • Location
    • Shivaji Path No 2
    • Cholegaon
    • Near Raj Vaibhav Complex
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079679
  • ReraGenie IDRG-MH-31345

Builder

  • NameAMAR REALTY
  • Entity typePartnership
  • GSTIN27AATFA3657L1ZT
  • PartnersRANJAN ASHOK PATEL, DAMJI MURJI RAVAT, HARESH ANANDJI PATEL, PRADEEP MAHADU JOSHI, HARILAL MURJI RAVAT, MUKHTAR RASUL KHAN, ASHOK SHAMJI PATEL, ZAKIR MUKHTAR KHAN, KANTABEN ANANDJI PATEL, SHAILESH ANANDJI PATEL, HITESH PRADEEP JOSHI, DHIREN SHAMJI PATEL
  • Other registrations3 more →
  • Completed2 of 4
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed65 files

Current status

16%40 of 243 units booked
5.0%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amar Galaxy Bldg No 2 Wing BNA18161318139
Amar Galaxy Bldg No 2 Wing CNA16149212104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

Amar Galaxy Bldg No 2 Wing B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Amar Galaxy Bldg No 2 Wing C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed427

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots427
Closed/Covered427
BuildingClosed/CoveredTotal
Amar Galaxy Bldg No 2 Wing B257257
Amar Galaxy Bldg No 2 Wing C170170

Land and ownership142

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area17,310 sq m
Land owned byThe promoter, with other names on the file
Named landowners142
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on2 May 2026
LandownerVillageDistrict
Salil Tulshiram JoshiDOMBIVLIThane
Paresh Tulshiram JoshiDOMBIVLIThane
Arun Maruti JoshiDOMBIVLIThane
Atul Ramdas JoshiDOMBIVLIThane
Shalik Shantaram JoshiDOMBIVLIThane
Suresh Shantaram JoshiDOMBIVLIThane
Ashok Shantaram JoshiDOMBIVLIThane
Shridhar Shantaram JoshiDOMBIVLIThane
Anjan Shantaram JoshiDOMBIVLIThane
Krishna Gangaram KatheDOMBIVLIThane
Reshma Ramesh KatheDOMBIVLIThane
Gurunath Kalu ChoudhariDOMBIVLIThane
Prathamesh Harishchandra ChoudhariDOMBIVLIThane
Jeevan Tukaram JoshiDOMBIVLIThane
Jaywant Mukund JoshiDOMBIVLIThane
Nirmala Balkrishna JoshiDOMBIVLIThane
Satyawan Balkrishna JoshiDOMBIVLIThane
Nivruti Balkrishna JoshiDOMBIVLIThane
Amol Balkrishna JoshiDOMBIVLIThane
Sangita Hanuman JoshiDOMBIVLIThane
Jitendra Hanuman JoshiDOMBIVLIThane
Pramila Mohan JoshiDOMBIVLIThane
Somnath Mohan JoshiDOMBIVLIThane
Gurunath Mohan JoshiDOMBIVLIThane
Rajendra Kalu ChoudhariDOMBIVLIThane
Vijay Motiram JoshiDOMBIVLIThane
Ranjita A. Joshi (Bhoir)DOMBIVLIThane
Ravi Pundalik JoshiDOMBIVLIThane
Barkibai Gulab JoshiDOMBIVLIThane
Amrut Sadashiv JoshiDOMBIVLIThane
Krishna Sadashiv JoshiDOMBIVLIThane
Ramkrishna Sudam JoshiDOMBIVLIThane
Pramod Tukaram JoshiDOMBIVLIThane
Krushna Sadashiv JoshiDOMBIVLIThane
Shevantabai Kalu ChaudharyDOMBIVLIThane
Prabhakar Kisan ChaudharyDOMBIVLIThane
Sainath Kisan ChaudharyDOMBIVLIThane
Meghnath Kisan ChaudharyDOMBIVLIThane
Ratna Adesh BajiDOMBIVLIThane
Sonali Kisan ChaudharyDOMBIVLIThane
Hausa Harishchandra ChaudharyDOMBIVLIThane
Anita Sunil JoshiDOMBIVLIThane
Kavita Savan BhoirDOMBIVLIThane
NANUBAI BALIRAM JOSHIDOMBIVLIThane
RANJANA MANOHAR PISEKARBadlapur (M Cl)Thane
NANDA BHASKAR GAYKWADTisgaonThane
ANITA ABHIMANYU PATILDOMBIVLIThane
HAUSABAI SHANTARAM JOSHIDOMBIVLIThane
PUSHPA SUBHASH RANEDOMBIVLIThane
BABY JEEVAN KENEDOMBIVLIThane
VIJAYA BALARAM KATHEDOMBIVLIThane
BHAGUBAI GANGARAM KATHEDOMBIVLIThane
RAJESH BALARAM KATHEDOMBIVLIThane
DILIP SHANTARAM JOSHIDOMBIVLIThane
SARITA ARVIND BHOIRDOMBIVLIThane
RAVINDRA BALARAM KATHEDOMBIVLIThane
MAYURESH RAMESH KATHEDOMBIVLIThane
NIKITA RAMESH KATHEDOMBIVLIThane
MITESH RAMESH KATHEDOMBIVLIThane
ARCHANA KIRAN JAMDALKARDOMBIVLIThane
SHUBHAM HANUMAN JOSHIDOMBIVLIThane
DARSHANA CHARANDAS MHATREDOMBIVLIThane
HEMA UTTAM PATILDOMBIVLIThane
MEGHA MURLIDHAR BHOIRDOMBIVLIThane
ROHINI SUNIL RANEDOMBIVLIThane
DATTU GOPAL JOSHIDOMBIVLIThane
MANISHA MACCHINDRA JOSHIDOMBIVLIThane
RAJ MACCHINDRA JOSHIDOMBIVLIThane
BHASKAR GOPAL JOSHIDOMBIVLIThane
MOTIRAM GOPAL JOSHIDOMBIVLIThane
APARNA MANISH PATILDOMBIVLIThane
SHWETA AMIT PATILDOMBIVLIThane
MAYUR ABHIMANYU THAKURDOMBIVLIThane
INDIRABAI TUKARAM JOSHIDOMBIVLIThane
RAMAKANT TUKARAM JOSHIDOMBIVLIThane
Nirabai Sahadev MhatreDOMBIVLIThane
Devkibai Gopinath ChaudhariDOMBIVLIThane
Suresh Gopinath ChaudharyDOMBIVLIThane
Deepak Gopinath ChaudharyDOMBIVLIThane
Sunita Gopinath ChaudharyDOMBIVLIThane
Nirmala Bhagwan PatilDOMBIVLIThane
Ranjita Hemant PatilDOMBIVLIThane
Yogita Manoj PatilDOMBIVLIThane
Surekha Eknath PatilDOMBIVLIThane
Matubai Kundalik JoshiDOMBIVLIThane
Sharada Sharad BhopiDOMBIVLIThane
Pramila Alias Laxmi Gajanan BhavareNeralRaigarh
Suvarna Manish PatilThane (M Corp.)Thane
Rina Eknath WayaleKalyanThane
Sandeep Suresh ModakNeralRaigarh
Shakuntala Gajanan JoshiDOMBIVLIThane
Pandurang Gajajnan JoshiDOMBIVLIThane
Renuka Prakash JoshiDOMBIVLIThane
Tejas Prakash JoshiDOMBIVLIThane
Tejaswini Haridas MhatreDOMBIVLIThane
Sunil Gajanan JoshiDOMBIVLIThane
Lilbai Shanidas GaykarDOMBIVLIThane
Manisha Tulshiram DesaleDOMBIVLIThane
Sunanda Chandrasen MhatreDOMBIVLIThane
Bayabai Anant JoshiDOMBIVLIThane
Sangita Anant JoshiDOMBIVLIThane
Kavita Anant JoshiDOMBIVLIThane
Anusaya Waman JadhavDOMBIVLIThane
Venu Motiram JoshiDOMBIVLIThane
Dinesh Motiram JoshiDOMBIVLIThane
Harshada Bandu PatilDOMBIVLIThane
Balaram Mangalya JoshiDOMBIVLIThane
Dattu Manglya JoshiDOMBIVLIThane
MacchindraMangalya JoshiDOMBIVLIThane
Ramesh Manglya JoshiDOMBIVLIThane
Mukund Manglya JoshiDOMBIVLIThane
Anjani Gajanan MhatreDOMBIVLIThane
Surekha Ramesh JadhavDOMBIVLIThane
Anandibai Hari JoshiDOMBIVLIThane
Sangita Yuvraj JoshiDOMBIVLIThane
Karan Yuvraj JoshiDOMBIVLIThane
Bhushan Yuvraj JoshiDOMBIVLIThane
Jayant Hari JoshiDOMBIVLIThane
Shaila Yashodhar PusalkarDOMBIVLIThane
Nanda Chandrakant MhatreDOMBIVLIThane
Yamunabai Kundalik PatilDOMBIVLIThane
Manda Ramdas JoshiDOMBIVLIThane
Amit Ramdas JoshiDOMBIVLIThane
Vishakha Pravin PatilDOMBIVLIThane
Shevantabai Shantaram MhatreDOMBIVLIThane
Anita Baban PatilVeheleThane
Yogita Baban PatilVeheleThane
Dipa Baban PatilVeheleThane
Raju Baban PatilVeheleThane
Vijay Baban PatilVeheleThane
Dropadabai Alias Lilabai Maruti BhoirDOMBIVLIThane
Pramila Prakash Mhatrekon (CT)Thane
Laxmi Sopan MaliDOMBIVLIThane
Ashok Shnataram MhatreDOMBIVLIThane
Shyam Shnataram MhatreKalyanThane
Urmila Arjun MhatreDOMBIVLIThane
Kiran Shantaram MhatreDOMBIVLIThane
Vandana Dilip BhoirDOMBIVLIThane
Komal Karesh MhatreDOMBIVLIThane
Ganesh Dilip BhoirDOMBIVLIThane
Chirag Dilip BhoirDOMBIVLIThane
Dattatray Gulab JoshiDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan-Dombivli Municipal Corporation (KDMC)
Permissible FSI31864.33
Proposed, not sanctioned14,341 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREEJI ARCADE,PHADKE ROAD,DOMBIVALI -E,THANE DISTRICTDOMBIVALIMAHARASHTRA421201
Estimated costRs 66.40 cr
Cost incurredRs 3.35 cr
Work done5.05%
BuildingWingEstimatedIncurred
Amar Galaxy Bldg No 2 Wing BNARs 37.48 crRs 1.98 cr
Amar Galaxy Bldg No 2 Wing CNARs 25.23 crRs 1.37 cr
-NARs 3.69 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR K Associates
EngineerAssociate Structural Engineers LLP
Chartered AccountantV S KASLIWAL & CO
Chartered AccountantPATWARDHAN SHEKHAWAT & ASSOCIATES
Chartered AccountantSachin Maheshwari and Co
PartnerRole in project
AMAR REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4Form1.pdf9 Jul 2026
Withdrawal Update Form 2File: Q4Form2.pdf9 Jul 2026
Withdrawal Update Form 3File: Q4Form3.pdf9 Jul 2026
Withdrawal Update Form 1File: Q3Form1.pdf4 Jul 2026
Withdrawal Update Form 2File: Q3Form2.pdf4 Jul 2026
Withdrawal Update Form 3File: Q3Form3.pdf4 Jul 2026
Withdrawal Update Form 1File: Q2Form1.pdf2 Jul 2026
Withdrawal Update Form 2File: Q2Form2.pdf2 Jul 2026
Withdrawal Update Form 3File: Q2Form3.pdf2 Jul 2026
Withdrawal Update Form 1File: Q1Form1.pdf25 Jun 2026
Withdrawal Update Form 2File: Q1Form2.pdf25 Jun 2026
Withdrawal Update Form 3File: Q1Form3.pdf25 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 Amar Galaxy II.pdf6 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert_compressed.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert.pdf13 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold_compressed.pdf13 May 2025
Other - FinanceFile: 1 Other - Finance.pdf17 Mar 2025
Declaration in FORM BFile: Form B - Promoter.pdf9 Mar 2025
Copy of the legal title reportFile: 1 Legal Title 1.pdf24 Feb 2025
Copy of the legal title reportFile: 2 Legal Title 2.pdf24 Feb 2025
Copy of the legal title reportFile: 3 Legal Title 3.pdf24 Feb 2025
Copy of the legal title reportFile: 4 Legal Title 4.pdf24 Feb 2025
Copy of the legal title reportFile: 5 Legal Title 5.pdf24 Feb 2025
Other - LegalFile: 7-12 Extract Total.pdf24 Feb 2025
Other - FinanceFile: 5 Land Valuation.pdf14 Feb 2025
Other - TechnicalFile: 3 Parking and Flat Clarification.pdf13 Feb 2025
Other - TechnicalFile: COMMENCEMENT FORM D _0001.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30 Form 3 CA Certificate.pdf9 Dec 2024
Building plan approvalFile: Highlights Area.pdf7 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Highlights Area.pdf7 Dec 2024
Building plan approvalFile: Block Plan Layout.pdf8 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Block Plan Layout.pdf8 Nov 2024
Other - TechnicalFile: Annexure A.pdf8 Nov 2024
Other - TechnicalFile: Declaration Clarification.pdf8 Nov 2024
Other - TechnicalFile: KDMC Mail.pdf8 Nov 2024
Other - TechnicalFile: KDMC Website.pdf8 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrances.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16 Form 1 Arch.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 21 FORM 2 ENG.pdf6 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 41 Format A.pdf6 Nov 2024
Details of encumbrances concerned to LegalFile: Encumbrances.pdf6 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 27 Disclosure of Interest.pdf6 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 42 Format B.pdf6 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 23 Disclosure of Finance.pdf6 Nov 2024
Layout approvalFile: 5 Layout.pdf29 Oct 2024
Building plan approvalFile: 6 Building Plan 2.pdf29 Oct 2024
Building plan approvalFile: 6 Building Plan 3.pdf29 Oct 2024
Building plan approvalFile: 6 Building Plan 4.pdf29 Oct 2024
Building plan approvalFile: 6 Building Plan 5.pdf29 Oct 2024
Building plan approvalFile: 6 Building Plan 6.pdf29 Oct 2024
PAN CardFile: PAN.pdf29 Oct 2024
Copy of Layout Approval (in case of layout)File: 5 Layout.pdf29 Oct 2024
Proforma of Allotment letterFile: 36 Draft Allotment Letter.pdf29 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 12 Commencement Certificate.pdf29 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 6.pdf29 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 4.pdf29 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 3.pdf29 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 2.pdf29 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan 5.pdf29 Oct 2024
Declaration about Commencement CertificateFile: 13 Declaration for Commencement.pdf29 Oct 2024
CERSAI detailsFile: 25 Declaration for CERSAI.pdf29 Oct 2024
Deviation Report with respect to Allotment letterFile: 44 Deviation Report Allotment Letter.pdf29 Oct 2024
Deviation Report with respect to model copy of AgreementFile: 45 Deviation Report Agreement for Sale.pdf29 Oct 2024
Proforma of Agreement for saleFile: 35 Draft Agreement for Sale.pdf29 Oct 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
AMAR ELEGANCEP51700031419Ganesh Nagar, Dombivli West, Thane134Oct 2021OngoingDec 2025Not delivered
AMAR GALAXY PHASE - IP51700019634Ganesh Nagar, Thane-Feb 2019CompletedNov 2024Registered original: Dec 2023Nov 2024
RAJ VAIBHAV NXRAJU NAGAR DOMBIVLI WEST590-CompletedDec 2020Aug 2020
NANA VISHNU HEIGHTSRAJU NAGAR DOMBIVLI WEST160-CompletedDec 2019Nov 2019
AMAR ORCHIDRAJU NAGAR DOMBIVLI WEST50-CompletedJun 2018Jun 2018

How this compares with Thane

16%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Amar Galaxy Bldg No. 2 Wing B and C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Cholegaon, Near Raj Vaibhav Complex7,600+ in Thane

2 kmAmar Galaxy Bldg No. 2 WCompleted 52Lapsed / revoked 44Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: AMAR REALTY

AMAR REALTY has 4 registrations on MahaRERA, including AMAR ORCHID and AMAR GALAXY PHASE - I. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Amar Galaxy Bldg No. 2 Wing B and C is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Amar Galaxy Bldg No. 2 Wing B and C?

The registered promoter entity is AMAR REALTY, a partnership as per the filing. Its GSTIN 27AATFA3657L1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Amar Galaxy Bldg No. 2 Wing B and C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Amar Galaxy Bldg No. 2 Wing B and C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Amar Galaxy Bldg No. 2 Wing B and C?

The professionals named in the filing: Architect: R K Associates; Engineer: Associate Structural Engineers LLP; Chartered Accountant: V S KASLIWAL & CO; Chartered Accountant: PATWARDHAN SHEKHAWAT & ASSOCIATES; Chartered Accountant: Sachin Maheshwari and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Amar Galaxy Bldg No. 2 Wing B and C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Amar Galaxy Bldg No. 2 Wing B and C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Amar Galaxy Bldg No. 2 Wing B and C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.