ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Swaminarayan City Phase 1D

Registered No litigation declared Residential / Group Housing project

Swaminarayan City Phase 1D

By Swaminarayan Life Space LLP

RG-MH-06722 · RERA P51700055644 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 85%
129 of 272Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Swaminarayan City Phase 1D is a Residential / Group Housing project by Swaminarayan Life Space LLP in Thane, Maharashtra, registered with MahaRERA as P51700055644 on 5 Apr 2024. Possession is promised by 31 Dec 2030. 143 of the 272 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSwaminarayan City Phase 1D
  • TypeResidential / Group Housing
  • Location
    • Reti Bunder Road
    • Mothagon
    • Mauje
    • Thakurli
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055644
  • ReraGenie IDRG-MH-06722

Builder

  • NameSwaminarayan Life Space LLP
  • Entity typePartnership
  • LLPINAAF-1517
  • GSTIN27ACXFS8846B1ZF
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersPundalik Balu Mhatre, Jayesh Pundlik Mhatre, Dipesh Pundlik Mhatre, Dharmesh Ashok Joshi, Vishal Ashok Joshi, Rasiklal Doongershi Nisar, Hirji Laxman Patel, Sachin Mulchand Vaviya, Ashish Ramesh Manseta, Jeram Shamji Patel
  • Other registrations5 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

53%143 of 272 units booked
18.2%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CalistaNA27232720272

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 85%.

Calista: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)85%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks1%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed152

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots152
Closed/Covered152

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,577 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
Manda Pradip SalviDOMBIVLIThane
Kalpana Vishnu GaikwadDOMBIVLIThane
Pratiksha Vikas JadhavDOMBIVLIThane
Rakshda Nitin JadhavDOMBIVLIThane
Kajal Rahul KambleKhoni (CT)Thane
Vishakha Sumit UghadeMhasaThane
Suraj Pradip SalviDOMBIVLIThane
Karan Pradip SalviDOMBIVLIThane
Pranay Pradip SalviDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Muncipal Corporation, Kalyan
Permissible FSI20138.8
Proposed, not sanctioned12,805 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCSB bank Limited Mulund Goregaon Link Road 400080
Estimated costRs 75.09 cr
Cost incurredRs 13.67 cr
Work done18.2%
BuildingWingEstimatedIncurred
CalistaNARs 73.40 crRs 13.67 cr
-NARs 1.69 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay Pathak
EngineerSR Consultants
Chartered AccountantPratik Pandya & CO
Chartered AccountantJDC And Associates LLP
PartnerRole in project
Swaminarayan Life Space LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504096ASHOK KUMAR LALWANISwaminarayan Life Space LLP20/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 4.pdf11 Jun 2026
Withdrawal Update Form 2File: Form 2 4.pdf11 Jun 2026
Withdrawal Update Form 3File: Form 3 4.pdf11 Jun 2026
Commencement certificateFile: CC.pdf24 Apr 2026
Commencement certificateFile: declaration.pdf24 Apr 2026
Building plan approvalFile: Plan 1 07102025.pdf24 Apr 2026
Building plan approvalFile: Plan 2 07102025.pdf24 Apr 2026
Building plan approvalFile: Plan 3 07102025.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 2.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 2.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 3.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 1.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 2.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 1.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 1.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 2.pdf21 Apr 2026
Form 1File: Form 1.pdf24 Dec 2025
Form 2File: Form 2.pdf24 Dec 2025
Form 3File: Form 3 4.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Letter.pdf24 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 4.pdf24 Dec 2025
Layout approvalFile: New Plan 1.pdf13 Oct 2025
Building plan approvalFile: New Plan 2.pdf13 Oct 2025
Building plan approvalFile: New Plan 3.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: form 5 Scan Swami Phase 1D.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 1.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 3.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1 Red.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 3 Reduced.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 3.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 1.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: 1D Sold Unsold June 24.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: ID Sold Unsold 2.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: 1D Sold Unsold 3.pdf5 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf4 Apr 2024
Copy of the legal title reportFile: Legal Title report.pdf28 Mar 2024
Copy of the legal title reportFile: Flow Of the title.pdf28 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest.pdf6 Jan 2024
Other - LegalFile: sale deed 48 4.pdf4 Dec 2023
Other - LegalFile: sale deed 61 17.pdf4 Dec 2023
Other - LegalFile: sale deed 61 18.pdf4 Dec 2023
Details of encumbrances concerned to FinanceFile: encumbrances finance.pdf2 Dec 2023
Details of encumbrances concerned to LegalFile: encumbrances finance.pdf2 Dec 2023
CERSAI detailsFile: Cresai Report.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Scan.pdf2 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seprate bank account.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 swaminarayan.pdf11 Nov 2023
Proforma of Agreement for saleFile: model form of agreement.pdf11 Nov 2023
Proforma of Allotment letterFile: model form of allotment letter.pdf11 Nov 2023
Layout approvalFile: Plan 1.pdf21 Oct 2023
Layout approvalFile: Plan 2.pdf21 Oct 2023
Building plan approvalFile: Plan 1.pdf21 Oct 2023
Building plan approvalFile: Plan 2.pdf21 Oct 2023
PAN CardFile: 1 PAN Card.pdf21 Oct 2023
Details of encumbrances concerned to FinanceFile: encumbrances legal matter.pdf21 Oct 2023
Details of encumbrances concerned to LegalFile: encumbrances legal matter.pdf21 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan 1.pdf21 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan 2.pdf21 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf21 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf21 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Oct 2023
Declaration in FORM BFile: Partners Affidavit.pdf21 Oct 2023
Deviation Report with respect to Allotment letterFile: deviation report allotment letter.pdf21 Oct 2023
Deviation Report with respect to model copy of AgreementFile: deviation report agreement for sales.pdf21 Oct 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Swaminarayan City Phase 1CP51700049570Mothagon, Mauje, Thakurli, Thane592Feb 2023OngoingDec 2029Not due yet
Swaminarayan City Phase 1AP51700019326Mauje Thakurli, Thane-Jan 2019OngoingDec 2029Not due yet
Swaminarayan City Phase 1BP51700031749Mothagaon, Mauje Thakurli, Thane224Nov 2021OngoingDec 2028Not due yet
Swaminarayan City Phase IP51700018305Mothagaon, Thakurli, Thane583Oct 2018OngoingDec 2027Not due yet

How this compares with Thane

53%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swaminarayan City Phase 1D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mothagon, Mauje, Thakurli7,600+ in Thane

2 kmSwaminarayan City Phase Completed 32Lapsed / revoked 27Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 107 registered projects within 2 km.

Builder: Swaminarayan Life Space LLP

Swaminarayan Life Space LLP has 6 registrations on MahaRERA, including Swaminarayan City Phase I and Swaminarayan City Phase 1A. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Swaminarayan City Phase 1D is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swaminarayan City Phase 1D?

The registered promoter entity is Swaminarayan Life Space LLP, a partnership as per the filing. Its LLPIN AAF-1517 and GSTIN 27ACXFS8846B1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swaminarayan City Phase 1D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Swaminarayan City Phase 1D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Swaminarayan City Phase 1D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swaminarayan City Phase 1D?

The professionals named in the filing: Architect: Vijay Pathak; Engineer: SR Consultants; Chartered Accountant: Pratik Pandya & CO; Chartered Accountant: JDC And Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swaminarayan City Phase 1D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swaminarayan City Phase 1D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swaminarayan City Phase 1D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.