Home / Browse projects / Thane, Maharashtra / Swaminarayan City Phase 1C

Registered No litigation declared Residential / Group Housing project

Swaminarayan City Phase 1C

By Swaminarayan Life Space LLP

RG-MH-34372 · RERA P51700049570 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 69%
129 of 592Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Swaminarayan City Phase 1C is a Residential / Group Housing project by Swaminarayan Life Space LLP in Thane, Maharashtra, registered with MahaRERA as P51700049570 on 15 Feb 2023. Possession is promised by 31 Dec 2029. 463 of the 592 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSwaminarayan City Phase 1C
  • TypeResidential / Group Housing
  • Location
    • Reti Bunder Road
    • Mothagon
    • Mauje
    • Thakurli
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049570
  • ReraGenie IDRG-MH-34372

Builder

  • NameSwaminarayan Life Space LLP
  • Entity typePartnership
  • LLPINAAF-1517
  • GSTIN27ACXFS8846B1ZF
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersPundalik Balu Mhatre, Jayesh Pundlik Mhatre, Dipesh Pundlik Mhatre, Dharmesh Ashok Joshi, Vishal Ashok Joshi, Rasiklal Doongershi Nisar, Hirji Laxman Patel, Sachin Mulchand Vaviya, Ashish Ramesh Manseta, Jeram Shamji Patel
  • Other registrations5 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed129 files

Current status

78%463 of 592 units booked
45.2%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADONIA Wing ENA423531319332
FIONA Wing FNA423524911260

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 69%.

ADONIA Wing E43%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)30%
Plinth100%
Stilt Floor100%
Slabs of Super Structure69%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
FIONA Wing F40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)30%
Plinth100%
Stilt Floor100%
Slabs of Super Structure63%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed450

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots450
Closed/Covered450
BuildingClosed/CoveredTotal
ADONIA Wing E200200
FIONA Wing F250250

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,703 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Priyanka Santosh BhoirDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Muncipal Corporation
Permissible FSI58989.22
Proposed, not sanctioned39,485 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRiddhi Siddhi Building, Malvia Road, Ram Nagar, Opp Bodas Mangal Karyalaya, Dombivli East
Estimated costRs 186.75 cr
Cost incurredRs 84.35 cr
Work done45.17%
BuildingWingEstimatedIncurred
FIONA Wing FNARs 94.28 crRs 41.33 cr
ADONIA Wing ENARs 87.80 crRs 43.02 cr
-NARs 4.67 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay Pathak
EngineerCity Engineering Services Manoj Ramakrishnan
EngineerAVG STRUCTURAL CONSULTANT
Chartered AccountantJignesh Dedhia And CO LLP
Chartered AccountantPratik N Pandya And Co
Chartered AccountantJDC And Associates LLP
PartnerRole in project
Swaminarayan Life Space LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000397407Avinashj Nivratirao SarpateSwaminarayan lifespaces09/09/2023
CC12502989Manoj AiyaSwaminarayan Life Space LLP24/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 4.pdf12 Jun 2026
Withdrawal Update Form 2File: Form 2 4.pdf12 Jun 2026
Withdrawal Update Form 3File: Form 3 4.pdf12 Jun 2026
Withdrawal Update Form 1File: Form 1 1.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 2.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 3.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 1.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 2.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 3.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 1.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 2.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 3.pdf15 May 2026
Form 1File: Form 1 4.pdf24 Dec 2025
Form 2File: Form 2 4.pdf24 Dec 2025
Form 3File: Form 3 4.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 4.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: form 5 Scan Swami Phase 1C.pdf30 Sep 2025
Form 1File: Form 1 3.pdf10 Jun 2025
Form 2File: Form 2 3.pdf10 Jun 2025
Form 3File: Form 3 3 Red.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold phase 1C.pdf10 Jun 2025
Disclosure of sold/ booked inventoryFile: 1C Sold Unsold Dec23.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: 1C Sold Unsold Mar 24.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: 1C Sold Unsold June 24.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: 1C Sold Unsold Sep 24.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 3.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 4.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 1.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 3 Reduced.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 4 Reduced.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1 Reduced.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2 Reduced.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 4.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 1.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2.pdf4 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Reup.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Letter Mar 23.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Letter Jun 23 1.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Sep 23.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Swaminarayan Life Space LLP Annual Report Phase 1C.pdf29 Sep 2023
Layout approvalFile: Plan 1.pdf1 Feb 2023
Layout approvalFile: 2.pdf1 Feb 2023
Layout approvalFile: 3.pdf1 Feb 2023
Layout approvalFile: 4.pdf1 Feb 2023
Layout approvalFile: 5.pdf1 Feb 2023
Layout approvalFile: 6.pdf1 Feb 2023
Layout approvalFile: 7.pdf1 Feb 2023
Layout approvalFile: 8.pdf1 Feb 2023
Layout approvalFile: 9.pdf1 Feb 2023
Layout approvalFile: 10.pdf1 Feb 2023
Layout approvalFile: 11.pdf1 Feb 2023
Layout approvalFile: 12.pdf1 Feb 2023
Layout approvalFile: 13.pdf1 Feb 2023
Layout approvalFile: 14.pdf1 Feb 2023
Building plan approvalFile: Plan 1.pdf1 Feb 2023
Building plan approvalFile: 2.pdf1 Feb 2023
Building plan approvalFile: 3.pdf1 Feb 2023
Building plan approvalFile: 4.pdf1 Feb 2023
Building plan approvalFile: 5.pdf1 Feb 2023
Building plan approvalFile: 6.pdf1 Feb 2023
Building plan approvalFile: 7.pdf1 Feb 2023
Building plan approvalFile: 8.pdf1 Feb 2023
Building plan approvalFile: 9.pdf1 Feb 2023
Building plan approvalFile: 10.pdf1 Feb 2023
Building plan approvalFile: 11.pdf1 Feb 2023
Building plan approvalFile: 12.pdf1 Feb 2023
Building plan approvalFile: 13.pdf1 Feb 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Swaminarayan City Phase 1DP51700055644Mothagon, Mauje, Thakurli, Thane272Apr 2024OngoingDec 2030Not due yet
Swaminarayan City Phase 1AP51700019326Mauje Thakurli, Thane-Jan 2019OngoingDec 2029Not due yet
Swaminarayan City Phase 1BP51700031749Mothagaon, Mauje Thakurli, Thane224Nov 2021OngoingDec 2028Not due yet
Swaminarayan City Phase IP51700018305Mothagaon, Thakurli, Thane583Oct 2018OngoingDec 2027Not due yet

How this compares with Thane

78%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swaminarayan City Phase 1C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mothagon, Mauje, Thakurli7,600+ in Thane

2 kmSwaminarayan City Phase Completed 32Lapsed / revoked 27Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 107 registered projects within 2 km.

Builder: Swaminarayan Life Space LLP

Swaminarayan Life Space LLP has 6 registrations on MahaRERA, including Swaminarayan City Phase I and Swaminarayan City Phase 1A. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Swaminarayan City Phase 1C is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swaminarayan City Phase 1C?

The registered promoter entity is Swaminarayan Life Space LLP, a partnership as per the filing. Its LLPIN AAF-1517 and GSTIN 27ACXFS8846B1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swaminarayan City Phase 1C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Swaminarayan City Phase 1C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Swaminarayan City Phase 1C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swaminarayan City Phase 1C?

The professionals named in the filing: Architect: Vijay Pathak; Engineer: City Engineering Services Manoj Ramakrishnan; Engineer: AVG STRUCTURAL CONSULTANT; Chartered Accountant: Jignesh Dedhia And CO LLP; Chartered Accountant: Pratik N Pandya And Co; Chartered Accountant: JDC And Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swaminarayan City Phase 1C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swaminarayan City Phase 1C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swaminarayan City Phase 1C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.