Home / Browse projects / Pune, Maharashtra / TRIDENT

Completed No litigation declared Residential / Group Housing project

TRIDENT

By PARANJAPE SCHEMES (CONSTRUCTION) LTD

RG-MH-07952 · RERA P52100004511 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 70%
1Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

TRIDENT is a Residential / Group Housing project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100004511 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Jul 2024. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTRIDENT
  • TypeResidential / Group Housing
  • Location
    • New wakad - Hinjewadi Link road
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004511
  • ReraGenie IDRG-MH-07952

Builder

  • NamePARANJAPE SCHEMES (CONSTRUCTION) LTD
  • Entity typeCompany
  • ChairpersonSHRIKANT PURUSHOTTAM PARANJAPE
  • Managing DirectorSHASHANK PURUSHOTTAM PARANJAPE
  • Other registrations28 more →
  • Completed15 of 29
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

this monthRegisteredAug 2017First promiseJul 2023Revised toJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion30 Jul 2024
  • Revised completionRevised to 30 Jul 2024 (originally 31 Jul 2023)
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA230000
BNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 70%.

A93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)65%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swimming PoolYes0%
Club HouseYes0%

Parking filed348

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots348
Closed/Covered348
BuildingClosed/CoveredTotal
A174174
B174174

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,387 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Rajendra Shankar KalatePimpri Chinchawad (M Corp.)Pune
Sanjay Shankar KalatePimpri Chinchawad (M Corp.)Pune
Dnyanoba Pandurang KalateWakadPune
Subhdra Dnyanoba KalateWakadPune
Tukaram Dnyanoba KalateWakadPune
Rupali Tukaram KalateWakadPune

Approvals and building plan

Permissible FSI16808.9
Proposed, not sanctioned16,809 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHLAND ARCHITECTS PVT LTD
EngineerS W MONE ASSOCIATES
PartnerRole in project
PARANJAPE SCHEMES (CONSTRUCTION) LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016535Jul 2023 → Jul 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000269479Paranjape Schemes Construction Limited Paranjape Schemes Construction LimitedBIMAL KUMAR25/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jul 2024

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Trident A B-March '25-uploaded.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: Trident.pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Trident AB Form02 Dec2024-compressed-uploaded.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure-MahaRERA Update Trident-Sept'24-uploaded-.pdf19 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Trident A B-Sept'24-uploaded.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Trident AB-Sept'24-uploaded.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: TRIDENT - 30th june Update.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Trident-FY '23-24-uploaded.pdf7 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-TRIDENT A B-11July'24-uploaded.pdf16 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate-TRIDENT A B-05July'24-uploaded.pdf6 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 24 Trident A B-FORM 1-June'24-uploaded.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2- Trident A B-June'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Report-TRIDENT- 31st March 2024-uploaded.pdf19 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Trident A B Bldg-Mar'24-uploaded.pdf10 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Trident AB-Mar'24-uploaded.pdf1 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Trident -Dec'23-uploaded.pdf5 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Trident-Dec'23-uploaded.pdf3 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Trident A B bldg-Sept'23-uploaded.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-Trident-FY'22-23-uplaoded-110ct23.pdf11 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Trident -Sept'23-uploaded.pdf6 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-Trident A B bldg-June'23.pdf7 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-Trident -June 23.pdf6 Jul 2023
Details of encumbrancesFile: Encumbrance Letter-Dues-Trident -Promoter.pdf16 May 2023
Declaration in FORM BFile: FORM B-Affidavit-Promoter-Trident.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: Trident-Disclosure of inventory-May 2023.pdf16 May 2023
Disclosure of sold/ booked inventoryFile: Trident.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Trident FORM 2A-FY 19-20.pdf10 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Trident -FORM 2A-FY 20-21.pdf10 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Trident -FORM 2A-F y 21-22.pdf10 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2 -Trident A B Bldg-Mar 2023-uploaded.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 RERA Certificate Trident A B.pdf10 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Trident FORM 1 Sept 17 to Mar 18-merged-compressed -uploaded.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 FORM 1-Trident A B -June 18 to Mar 19-merged -compressed -uploaded.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Trident A B -FOrm 1-June 19 to Mar 20-merged-compressed-uploaded.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Trident AB -Form 1-June 20 to MAr 21-merged-compressed-uploaded.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 Trident AB9Form 1 -June 21 to Mar 22-merged-compressed-uploaded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1Trident AB Form-2 June-17 To March-18 compressed -uploded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2Trident AB Form-2 June-18 To March-19 -compressed-uploaded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3Trident AB Form-2 June-19 To March-20 -compressed-uploaded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Trident AB Form-2 June-20 To March-21-compressed -uploded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5Trident AB Form-2 June-21 To Mar-22-compressed-uploaded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5Trident AB Form-2 June-21 To Mar-22-compressed-uploaded.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Trident AB Form-2 June-2022.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8Trident AB Form-2 Sept-22.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Trident AB Form-2 Dec-22.pdf2 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Trident QA FORM 2A year 2019.pdf11 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Trident QA FORM 2A year 19-20.pdf11 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Trident QA FORM 2A-June 20 to Mar 2021.pdf11 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Trident QA FORM 2A Year Jun 21 to Dec 21.pdf11 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Trident.pdf9 Feb 2022
Layout approvalFile: Trident sanction Layout 2021_compressed.pdf2 Feb 2022
Copy of Layout Approval (in case of layout)File: Trident sanction Layout 2021_compressed.pdf2 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: A 4Commencement Certificate31Dec2021.pdf2 Feb 2022
Declaration about Commencement CertificateFile: Format D- Trident -Declaration about commencement.pdf2 Feb 2022
CERSAI detailsFile: Trident _CERSAI _Report.pdf2 Feb 2022
CERSAI detailsFile: Trident CERSAI_Report_.pdf2 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Trident.pdf21 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 18 RERA Trident compressed.pdf1 Apr 2021
Certificates of CA (Form 5)File: Trident_Form 5_18-19.pdf7 Oct 2019
Layout approvalFile: Trident A and B layout.pdf29 May 2019
Copy of Layout Approval (in case of layout)File: Trident A and B layout.pdf29 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Trident Commencement 13 Mar2019.pdf29 May 2019
Certificates of CA (Form 5)File: Trident.pdf8 Oct 2018
Details of encumbrancesFile: Encumbrance Certificate_Trident.pdf30 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: CC18424112017Mhada.pdf30 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: CC18524112017Residential.pdf30 Dec 2017
OtherFile: Environment Clearance_Trident_28-11-2017.pdf30 Dec 2017
Layout approvalFile: Triden _ IOD Plan _ Part-1.pdf29 Jul 2017
Layout approvalFile: Triden _ IOD Plan _ Part-2.pdf29 Jul 2017
Building plan approvalFile: Triden _ IOD Plan _ Part-1.pdf29 Jul 2017
Building plan approvalFile: Triden _ IOD Plan _ Part-2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Triden _ IOD Plan _ Part-1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Triden _ IOD Plan _ Part-2.pdf29 Jul 2017
Building Plan Approval (IOD)File: Triden _ IOD Plan _ Part-1.pdf29 Jul 2017
Building Plan Approval (IOD)File: Triden _ IOD Plan _ Part-2.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC_Trident.pdf29 Jul 2017
Proforma of Allotment letterFile: Proforma_Allotment Ltr Agreement_Trident.pdf25 Jul 2017
Declaration in FORM BFile: Form B_Promoter-Trident.pdf20 Jul 2017
Copy of the legal title reportFile: Title Certificate_Trident.pdf19 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate_Trident.pdf19 Jul 2017

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
127 UPPER EASTP51800000454Andheri, Mumbai Suburban-Jul 2017CompletedJun 2024Registered original: Dec 2019Jan 1970
PRATHAM RESIDENTIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103035-CompletedApr 2016Mar 2016
THE BUSINESS HUBSURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 41102986-CompletedJan 2016Nov 2015
MADHUKOSH - IIISNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune258-CompletedAug 2015Aug 2015
PRATHAM COMMERCIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103032-CompletedJun 2015Apr 2015
PUNARVASUPRABHAT ROAD ERANDWANE PUNE 41100410-CompletedDec 2014Late, Jun 2015
MADHUKOSH - IISNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune150-CompletedDec 2013Oct 2013
MADHUKOSH - ISNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune289-CompletedMar 2012Feb 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRIDENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmTRIDENTCompleted 108Lapsed / revoked 44Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 230 registered projects within 2 km.

Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD

PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TRIDENT is delayed beyond 30 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRIDENT?

The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRIDENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TRIDENT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TRIDENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRIDENT?

The professionals named in the filing: Architect: ARCHLAND ARCHITECTS PVT LTD; Engineer: S W MONE ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRIDENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRIDENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRIDENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.