Home / Browse projects / Pune, Maharashtra / TRIDENT E F
TRIDENT E F
By PARANJAPE SCHEMES (CONSTRUCTION) LTD
RG-MH-17195 · RERA P52100029377 · Last updated on MahaRERA portal: 1 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRIDENT E F is a Residential / Group Housing project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100029377 on 29 May 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 198 of the 302 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameTRIDENT E F
- TypeResidential / Group Housing
- Location
- New Wakad Hinjawadi Link Road
- Wakad
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100029377
- ReraGenie IDRG-MH-17195
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2021
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed84 files
Current status
Figures as on 1 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Trident E | NA | 29 | 17 | 177 | 0 | 177 |
| Trident F | NA | 29 | 17 | 125 | 0 | 125 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 60%.
Trident E34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 60% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Trident F34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 60% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 5% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed304
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Trident E | 178 | 178 |
| Trident F | 126 | 126 |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Dnyanoba Pandurang Kalate | Wakad | Pune |
| Subhadra Dnayanoba Kalate | Wakad | Pune |
| Tukaram Dnynoba Kalate | Wakad | Pune |
| Rupali Tukaram Kalate | Wakad | Pune |
| Rajendra Shankar Kalate | Wakad | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Trident E | NA | Rs 42.80 cr | Rs 7.24 cr |
| - | NA | Rs 35.10 cr | Rs 29.96 cr |
| Trident F | NA | Rs 33.10 cr | Rs 5.43 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Archland Architects Pvt Ltd |
| Engineer | Vijaykumar Salunkhe |
| Engineer | Chnadrashekhar |
| Chartered Accountant | Gosavi Yardi & Company |
| Chartered Accountant | Kapure and Kapure Chartered Accountant |
| Chartered Accountant | Gosavi Yardi & Co |
| Partner | Role in project |
|---|---|
| PARANJAPE SCHEMES (CONSTRUCTION) LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project is about to expire as on 31/12/2025 after which the we will not be able to execute registration of the Agreement to Sale as well as we are not being able to receive further instalments from the financial institutions/allottes which will badly effect the cash flows. The poor cash flows, cost overruns on projects, unexpected expenses, economic downturns are reasons that contributed the delay. Without the sufficient funds due to poor cash flow, we struggled to meet financial obligations, leading to a downward spiral of financial difficulties. Further, the contractor who was entrusted
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 .pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Trident EF Dec 25-compressed.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Trident EF Mar 26-compressed.pdf | 1 Jun 2026 |
| Form 2A (FY 2021-2022)File: Form 2A_Trident E & F_2021-22.pdf | 25 Dec 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A-FY 22-23-recd & uplaoded on 11.04.2025.pdf | 25 Dec 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A-FY 23-24-recd & uploaded on 11.04.2025.pdf | 25 Dec 2025 |
| Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 25 Dec 2025 |
| Form 5 (FY 2022-2023)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 25 Dec 2025 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 25 Dec 2025 |
| Withdrawal Update Form 1File: Form 1_Trident E F dt 30625.pdf | 15 Dec 2025 |
| Withdrawal Update Form 1File: Form 1_Trident E F dt 30625.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2- Trident EF June 25.pdf | 15 Dec 2025 |
| Withdrawal Update Form 2File: Form-2_Trident E_F.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Trident E F June 25 - signed.pdf | 15 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 signed.pdf | 15 Dec 2025 |
| Form 5 (FY 2024-2025)File: Trident EF_Signed.pdf | 8 Nov 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-FY 22-23-uplaoded.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-FY 23-24-uploaded.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Trident E F-Mar'25-uplaoded.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Trident E F.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Trident E F -31Mar'2024 - Final-uploaded.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Trident E F-Dec'24-uploaded.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Trident E F-Sept'24-uploaded.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure- Update Trident EF-Sept'24-uploaded-.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Trident E F-Sept'24-uploaded.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Trident E F - 30th june update uploaded.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Trident EF-FY -'23-24-uploaded.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 27 Trident E F-FORM 1-June'24-uploaded.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2-Triednt E F-June'24-uplaoded.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Report-TRIDENT EF- 31st March 2024-uploaded.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Trident EF Bldg-Mar'24-uploaded.pdf | 10 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5- Trident EF-FY 22-23-uploaded.pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- Trident EF-Mar'24-uploaded.pdf | 1 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Trident E F-Dec'23-uploaded.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-Trident E F-Sept'23-uploaded.pdf | 6 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Trident EF-Dec'23-uploaded.pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Letter - Trident E F.pdf | 22 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Trident E F bldg-Sept'23-uploaded.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Trident E F-Sept'23-uploaded.pdf | 6 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Trident E F Bldg-June'23.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Trident E F-June 23.pdf | 6 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - Trident E F Bldg-Mar 2023-uploaded.pdf | 8 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Trident E F-FORM 5-FY-21-22-uploaded 20Feb 2023.pdf | 21 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trident EF-RERA-Form 1-Mar 22-compressed-uploaded.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trident EF -RERA-Form 1 -Sept 22 -Recd in JAn2023compressed-uploaded.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1Trident E F Form 2 Jan -21 to Dec -21.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Trident E F Form 2 March-2022.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Trident E F Form 2 June-2022.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Trident E F Form 2 Sept -2022.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Trident E F Form 2 Dec -2022.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Trident CD -Form1-FY18-19-merged-compressed.pdf | 4 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Trident CD -Form 1-FY 19-20-merged-compressed.pdf | 4 Feb 2023 |
| Layout approvalFile: H1 Trident sanction Layout 2021_compressed.pdf | 1 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: H1 Trident sanction Layout 2021_compressed.pdf | 1 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: A 4Commencement Certificate31Dec2021.pdf | 1 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A MahaRERA Trident EF DEC 2021.pdf | 1 Feb 2022 |
| Copy of the legal title reportFile: C Trident E F certificate 28Jan2022.pdf | 31 Jan 2022 |
| Declaration about Commencement CertificateFile: Format D-Trident E F.pdf | 31 Jan 2022 |
| CERSAI detailsFile: Trident _CERSAI _Report.pdf | 31 Jan 2022 |
| CERSAI detailsFile: Trident Enhancement_CERSAI_Report.pdf | 31 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Trident E F RERA Form 1 Architect 19 May2021.pdf | 19 May 2021 |
| Layout approvalFile: Layout Trident.pdf | 10 May 2021 |
| Building plan approvalFile: Layout Trident.pdf | 10 May 2021 |
| Copy of the legal title reportFile: Title report New Format.pdf | 10 May 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Trident.pdf | 10 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Trident.pdf | 10 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Cmmencement Certificate Trident E F 26August2020 compressed.pdf | 10 May 2021 |
| PAN CardFile: PSCL.pdf | 12 Apr 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Trident EF.pdf | 2 Apr 2021 |
| Layout approvalFile: Trident E F Layout.pdf | 22 Jan 2021 |
| Layout approvalFile: Trident E F IOD Plan Compress 2.pdf | 22 Jan 2021 |
| Building plan approvalFile: Trident E F Layout.pdf | 22 Jan 2021 |
| Building plan approvalFile: Trident E F IOD Plan Compress 2.pdf | 22 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: Trident E F Layout.pdf | 22 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: Trident E F IOD Plan Compress 2.pdf | 22 Jan 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Trident E F Layout.pdf | 22 Jan 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Trident E F IOD Plan Compress 2.pdf | 22 Jan 2021 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| 127 UPPER EASTP51800000454 | Andheri, Mumbai Suburban | - | Jul 2017 | Completed | Jun 2024Registered original: Dec 2019 | Jan 1970 |
| PRATHAM RESIDENTIAL | 727 SADASHIV PETH KUMTHEKAR ROAD PUNE 411030 | 35 | - | Completed | Apr 2016 | Mar 2016 |
| THE BUSINESS HUB | SURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 411029 | 86 | - | Completed | Jan 2016 | Nov 2015 |
| MADHUKOSH - III | SNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 258 | - | Completed | Aug 2015 | Aug 2015 |
| PRATHAM COMMERCIAL | 727 SADASHIV PETH KUMTHEKAR ROAD PUNE 411030 | 32 | - | Completed | Jun 2015 | Apr 2015 |
| PUNARVASU | PRABHAT ROAD ERANDWANE PUNE 411004 | 10 | - | Completed | Dec 2014 | Late, Jun 2015 |
| MADHUKOSH - II | SNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 150 | - | Completed | Dec 2013 | Oct 2013 |
| MADHUKOSH - I | SNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune | 289 | - | Completed | Mar 2012 | Feb 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 28 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TRIDENT E F on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wakad13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD
PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if TRIDENT E F is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRIDENT E F?
The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRIDENT E F?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TRIDENT E F?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRIDENT E F?
The professionals named in the filing: Architect: Archland Architects Pvt Ltd; Engineer: Vijaykumar Salunkhe; Engineer: Chnadrashekhar; Chartered Accountant: Gosavi Yardi & Company; Chartered Accountant: Kapure and Kapure Chartered Accountant; Chartered Accountant: Gosavi Yardi & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIDENT E F?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback