Registered No litigation declared Residential / Group Housing project

Transcon Fortune 500 Tower 1

By Samta Builders Pvt. Ltd.

RG-MH-25172 · RERA P51800012431 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
202 of 265Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

Transcon Fortune 500 Tower 1 is a Residential / Group Housing project by Samta Builders Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012431 on 1 Sep 2017. Possession is promised by 30 Dec 2026. 63 of the 265 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameTranscon Fortune 500 Tower 1
  • TypeResidential / Group Housing
  • Location
    • BalRajeshwar Road
    • Mulund (W)
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012431
  • ReraGenie IDRG-MH-25172

Builder

  • NameSamta Builders Pvt. Ltd.
  • Entity typeCompany
  • GSTIN27AACCS6362G1Z9

Key dates

this monthRegisteredSep 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed125 files

Current status

24%63 of 265 units booked

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Transcon Fortune 500 Tower 1NA69692650265

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Transcon Fortune 500 Tower 1: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed539

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots539
Closed/Covered539

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area690 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2026

Approvals and building plan

Permissible FSI28000.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 3 4, Jamuna Apartments S V Road Andheri Mumbai-400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTeeArch
EngineerRamboll India Private Limited
Chartered AccountantCHANDAN LODHA
PartnerRole in project
Samta Builders Pvt. Ltd.-

Litigation declared12

CaseCourtStatus
195 /2014The Small Causes Court MumbaiPending
39/2016The Small Causes Court MumbaiPending
102787/2015The City Civil Court MumbaiPending
100054/2017The City Civil Court MumbaiPending
2138/2015The Sessions Court MumbaiPending
99/SW/2015Twenty Seventh Magistrate Court MulundPending
3809/2016The High Court BombayPending
CAA/100/2015The High Court BombayPending
COAPP/72/2015The High Court BombayPending
CC006000000056954/2019RERADisposed
CC006000000055512/2018RERADisposed
AT006000000021406/2019RERA Appellate Tribunal MumbaiPending

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000044015sumit jainsamta builder pvt ltd06/04/2018
CC006000000056954Rupika JainSamta Builder Pvt Ltd17/11/2018
CC006000000055512Dinesh Kanyalal Gupta & 5 othersM/s Samta Builders Pvt Ltd26/07/2018
CC006000000375416SKS Infra Buld Pvt Ltd LtdTranscon SkycIty Pvt ltd27/04/2023
CC12400830Anchor Point Developer Private LimitedSamta Builders Pvt. Ltd.20/11/2024
CC12501742Rajaram Nekaram BhatiSamta Builders Pvt. Ltd.28/05/2025
CC12600500Abhiraj Rajaram MathaneSamta Builders Pvt. Ltd.28/01/2026
CC12600756Rubin SinghalSamta Builders Pvt. Ltd.10/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf2 May 2026
Form 1File: TSPL Form 1 Mar-26.pdf2 May 2026
Form 2File: TSPL Form 2 Mar-26.pdf2 May 2026
Form 3File: TSPL Form 3 Mar-26_11zon.pdf2 May 2026
Form 1File: TSPL Form 1 Mar 25.pdf16 Feb 2026
Form 2File: TSPL Form 2 Mar 25.pdf16 Feb 2026
Form 3File: TSPL Form 3 Mar 25 1.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: TSPL-Inventory Disclosure March25.pdf16 Feb 2026
Form 1File: TSPL Form 1 Jun 25.pdf16 Feb 2026
Form 2File: TSPL Form 2 Jun 25.pdf16 Feb 2026
Form 3File: TSPL Form 3 Jun 25.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: TSPL-Inventory Disclosure June 25.pdf16 Feb 2026
Form 1File: TSPL Form 1 Sep 25.pdf16 Feb 2026
Form 2File: TSPL Form 2 Sep25.pdf16 Feb 2026
Form 3File: TSPL Form 3 Sep 25 1.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: TSPL-Inventory Disclosure july 25.pdf16 Feb 2026
Form 1File: TSPL Form 1 Dec 25.pdf16 Feb 2026
Form 2File: TSPL Form 2- Dec 25.pdf16 Feb 2026
Form 3File: TSPL Form 3 Dec 25 1.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: TSPL-Inventory Disclosure Dec 25.pdf16 Feb 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2-Form 1 30 June-23.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3-Form 1 30 Sep-23.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31 Dec-23.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31 Mar-24.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 June-24.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 Sep-24.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec'24.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01-Form 1 31 Mar-23.pdf22 Feb 2025
Certificates of CA (Form 3)File: 2-Form 3 Sep'23 (2).pdf22 Feb 2025
Certificates of CA (Form 3)File: 7-Form 3 Dec 24 (2).pdf22 Feb 2025
Certificates of CA (Form 3)File: 6-Form 3 Sep 24 (2).pdf22 Feb 2025
Certificates of CA (Form 3)File: 5-Form 3 June 24 (2).pdf22 Feb 2025
Certificates of CA (Form 3)File: 3-Form 3 Dec'23 (2).pdf22 Feb 2025
Certificates of CA (Form 3)File: 1-Form 3 June 23 (2).pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun'23.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec'24.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep'24.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 24.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar' 24.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec'23.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep'23.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun'23.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar'23.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar'23.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Mar'19.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Mar'20.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mar'21.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar'22.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Mar'24.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY Mar'24.pdf22 Feb 2025
PAN CardFile: TSPL - Pan Card.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Mar 18.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Mar 19.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Mar 20.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Mar 21.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Mar 22.pdf7 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202203_Ar.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202206_Ar.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202209_Ar.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202212_Ar.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202203_Er.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202206_Er.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202209_Er.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202212_Er.pdf6 Apr 2023
Certificates of CA (Form 3)File: 202203_CA.pdf6 Apr 2023
Certificates of CA (Form 3)File: 202206_CA.pdf6 Apr 2023
Certificates of CA (Form 3)File: 202209_CA.pdf6 Apr 2023
Certificates of CA (Form 3)File: 202212_CA.pdf6 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201903_Ar.pdf5 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201909_Ar.pdf5 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202003_Ar.pdf5 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202009_Ar.pdf5 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202103_Ar.pdf5 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202109_Ar.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202003_Ar.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201903_Er.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201909_Er.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202003_Er.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202009_Er.pdf5 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202103_Er.pdf5 Apr 2023

How this compares with Mumbai Suburban

24%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Transcon Fortune 500 Tower 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund (W)6,700+ in Mumbai Suburban

2 kmTranscon Fortune 500 TowCompleted 82Lapsed / revoked 54Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 235 registered projects within 2 km.

Builder: Samta Builders Pvt. Ltd.

Samta Builders Pvt. Ltd. has 1 registration on MahaRERA, including Transcon Fortune 500 Tower 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Transcon Fortune 500 Tower 1 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Transcon Fortune 500 Tower 1?

The registered promoter entity is Samta Builders Pvt. Ltd., a company as per the filing. Its GSTIN 27AACCS6362G1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Transcon Fortune 500 Tower 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Transcon Fortune 500 Tower 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Transcon Fortune 500 Tower 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Transcon Fortune 500 Tower 1?

The professionals named in the filing: Architect: TeeArch; Engineer: Ramboll India Private Limited; Chartered Accountant: CHANDAN LODHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Transcon Fortune 500 Tower 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Transcon Fortune 500 Tower 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Transcon Fortune 500 Tower 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.