Home / Browse projects / Raigarh, Maharashtra / Tower A Mercury, Venus

Registered No litigation declared Residential / Group Housing project

Tower A Mercury, Venus

By DREAMZ REALTY

RG-MH-97334 · RERA P52000049371 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 6%
84 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Tower A Mercury, Venus is a Residential / Group Housing project by DREAMZ REALTY in Raigarh, Maharashtra, registered with MahaRERA as P52000049371 on 7 Feb 2023. Possession is promised by 31 Dec 2030. 4 of the 88 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameTower A Mercury, Venus
  • TypeResidential / Group Housing
  • Location
    • Mamdapur Road
    • Near Hotel Tiwale
    • Neral
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • RERA no.P52000049371
  • ReraGenie IDRG-MH-97334

Builder

  • NameDREAMZ REALTY
  • Entity typePartnership
  • GSTIN27AALFD7744B1ZF
  • PartnersTausif M Ali Mulla, Asif Mohammed Patel
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Current status

5%4 of 88 units booked
21.0%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A MercuryNA13148048
Tower A VenusNA131240040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 6%.

Tower A Mercury28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower A Venus27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Tower A Mercury11
Tower A Venus11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,945 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jan 2026

Approvals and building plan

Sanctioning authorityRaigad Zilla Parishad
Permissible FSI5945.46
Proposed, not sanctioned5,945 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT SHOP NO 18 AND 19 PLOT NO D 69 KHARGHAR SECTOR 12 NAVI MUMBAI 410210
Estimated costRs 14.55 cr
Cost incurredRs 3.05 cr
Work done21.0%
BuildingWingEstimatedIncurred
Tower A MercuryNARs 14.55 crRs 3.05 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrasad
EngineerPrasad Dani & Associates
Chartered AccountantS M SHAIKH & CO
PartnerRole in project
DREAMZ REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Tower A - Form 1- Architect Certificate..pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - Tower A - Architect Certificate.pdf10 Jun 2026
Withdrawal Update Form 2File: FORM -2 Tower A - Engineers Certificate 14.pdf10 Jun 2026
Withdrawal Update Form 2File: Form 2 - Tower A - Enginer Certificate.pdf10 Jun 2026
Withdrawal Update Form 3File: Tower A Form 3 CA Certificate .pdf10 Jun 2026
Withdrawal Update Form 3File: FORM 3 tower A MERCURY VENUS.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1 - Tower A - Architect Certificate .pdf2 Jun 2026
Withdrawal Update Form 2File: FORM -2 Tower A - Engineers Certificate 14.pdf2 Jun 2026
Withdrawal Update Form 3File: Form 3 Tower A 31-12-2025.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1 - Tower A - Architect Certificate .pdf30 May 2026
Withdrawal Update Form 2File: Form 2 - Tower A Engineer's Certificate .pdf30 May 2026
Withdrawal Update Form 3File: Form 3 Tower A 31-12-2025.pdf30 May 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 DREAMZ PLANET TOWER A 22-23.pdf3 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 DREAMZ PLANET TOWER A 23-24.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower A (Architect Certificate).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER AFORM-3 UPLOAD.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower A (Engineers Certificate).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -2 Tower A - Engineers Certificate 8_Signed.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -2 Tower A - Engineers Certificate 8_Signed.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER A FORM 3 MERCURY VENUS.pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -1 Tower A - Architects Certificate 8_Signed.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Tower A - Architect Certificate .pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Tower A Engineer's Certificate .pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Toer A ca.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower A- Mercury, Venus Architect Certificate.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower A Engineer's Certificate.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower A ca certificate.pdf7 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower A Form 1.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower A Form 2.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower(A)Form 1 .pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower(A) FORM 2.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower A resized final.pdf18 Oct 2023
Other - FinanceFile: Tower A .pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower-A Form-1 01-Aug-2023.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower-A Form-2 01-Aug-2023.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower-A Form-3 01-Aug-2023 UPLOAD COMP.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Tower A - Architects Certificate.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 Tower A - Engineers Certificate.pdf27 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - Tower A - Architects Certificate 2.pdf13 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Tower A - Engineers Ceritifcate 2.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: padwal associate document.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Podwal Form A.pdf2 Feb 2023
Declaration about Commencement CertificateFile: Tower A Doc.pdf27 Jan 2023
Declaration in FORM BFile: Form B.pdf27 Jan 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbarance Tower A.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumbarance Tower A.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumbarance tower a.pdf11 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbarance tower a.pdf11 Jan 2023
CERSAI detailsFile: Cersai Report Tower A.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf11 Jan 2023
Proforma of Agreement for saleFile: Dreamz-park-Planet RERA-Draft KhaliDbhai Final Agreement.pdf11 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Tower A Seperate Bank Account.pdf11 Jan 2023
Layout approvalFile: Layout.pdf20 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf20 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Dreamz Planet CC - 2022.pdf20 Dec 2022
Proforma of Allotment letterFile: Allotment Letter uploaded.pdf20 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Certificate.pdf20 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Certificate.pdf19 Dec 2022
Building plan approvalFile: Dreamz Planet TP -1 2022 uploaded.pdf25 Nov 2022
Building plan approvalFile: Dreamz Planet TP -2 2022 uploaded.pdf25 Nov 2022
PAN CardFile: Company Pan Card.pdf25 Nov 2022
Copy of the legal title reportFile: Legal Title 12 2-A.pdf25 Nov 2022
Copy of the legal title reportFile: Legal Title 12 2-B.pdf25 Nov 2022
Copy of the legal title reportFile: Legal Title 12 3-A.pdf25 Nov 2022
Copy of the legal title reportFile: Legal Title 12 3-B.pdf25 Nov 2022
Copy of the legal title reportFile: Legal Title 13 1.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Dreamz Planet TP -1 2022 uploaded.pdf25 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Dreamz Planet TP -2 2022 uploaded.pdf25 Nov 2022

How this compares with Raigarh

5%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tower A Mercury, Venus on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Hotel Tiwale5,900+ in Raigarh

Builder: DREAMZ REALTY

Dreamz Realty has 5 registrations on MahaRERA, including Dreams Park - Blossom and Dreams Park. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Tower A Mercury, Venus is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tower A Mercury, Venus?

The registered promoter entity is DREAMZ REALTY, a partnership as per the filing. Its GSTIN 27AALFD7744B1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tower A Mercury, Venus?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tower A Mercury, Venus?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tower A Mercury, Venus?

The professionals named in the filing: Architect: Prasad; Engineer: Prasad Dani & Associates; Chartered Accountant: S M SHAIKH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tower A Mercury, Venus?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tower A Mercury, Venus. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tower A Mercury, Venus to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.