ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Three Jewels

Completed No litigation declared Residential / Group Housing project

Three Jewels

By Snowflower Properties Private Limited

RG-MH-21096 · RERA P52100006160 · Last updated on MahaRERA portal: 9 Oct 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
59 of 77Construction stages doneacross 7 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Three Jewels is a Residential / Group Housing project by Snowflower Properties Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100006160 on 14 Aug 2017. The registration is recorded completed; possession was promised by 29 Jun 2024. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameThree Jewels
  • TypeResidential / Group Housing
  • Location
    • Kondhwa
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100006160
  • ReraGenie IDRG-MH-21096

Builder

  • NameSnowflower Properties Private Limited
  • Entity typeCompany
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion29 Jun 2024
  • Revised completionRevised to 29 Jun 2024 (originally 30 Dec 2023)
  • Buildings7 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Moonstone-INA180000
Moonstone-JNA190000
Moonstone-KNA180000
Moonstone-LNA190000
Moonstone-MNA180000
Moonstone-NNA170000
Moonstone-ONA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

59 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 0%.

Moonstone-I82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Moonstone-J82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Moonstone-K73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Moonstone-L82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Moonstone-M73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Moonstone-N73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Moonstone-O73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed773

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots773
Closed/Covered536
Open Space237
BuildingClosed/CoveredOpen SpaceTotal
Moonstone-I622890
Moonstone-J712394
Moonstone-K415394
Moonstone-L8819107
Moonstone-M514394
Moonstone-N8137118
Moonstone-O14234176

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,084 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Jairaj Developers Unit 11Pune (M Corp.)Pune

Approvals and building plan

Permissible FSI48131.06
Proposed, not sanctioned48,131 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-Wing Shangrila Gardens, Bund Garden Rd, Pune, Maharashtra 411001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJagadish P Deshpande
EngineerJW Consultant LLP
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
Snowflower Properties Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017148Dec 2023 → Jun 2024

Reason as filed by the promoterAs mentioned in application

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 May 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SNOWFLOWER.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SNOWFLOWER.pdf9 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificates - Three Jewels.pdf7 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Three Jewels.pdf7 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Jewels-signed Form-2.pdf19 Apr 2024
Certificates of CA (Form 3)File: Three Jewels.pdf19 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: three jewels.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Jewels.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Jewels.pdf20 Jan 2024
Certificates of CA (Form 3)File: Three Jewels.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Jewels Form 2.pdf20 Oct 2023
Certificates of CA (Form 3)File: Three Jewels_compressed.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: three jewels.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Three-Jewels Residential.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Jewels.pdf20 Jul 2023
Certificates of CA (Form 3)File: Three Jewels_compressed.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three jewels.pdf17 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: three jewels.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Three Jewels.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Three jewels Final declaration.pdf20 Apr 2023
Certificates of CA (Form 3)File: Form3 Signed Three Jewels final1.pdf20 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266187370_For_Debtor_Based_Search_15_04_2023_16_31_55_752.pdf15 Apr 2023
Proforma of Agreement for saleFile: AFS OC Complete building.pdf13 Apr 2023
Proforma of Agreement for saleFile: AFS for ongoing building.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Signed certificate Three Jewels March 19.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Snowflower Three Jewels RERA Certificate.pdf28 Mar 2023
Disclosure of sold/ booked inventoryFile: Three Jewels.pdf19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Three Jewels.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - three jewels.pdf18 Jan 2023
CERSAI detailsFile: Cersai.pdf18 Jan 2023
Certificates of CA (Form 3)File: CA - three jewels_compressed.pdf18 Jan 2023
Proforma of Allotment letterFile: AFS for balance wings compressed.pdf5 Nov 2022
Proforma of Allotment letterFile: Post OCFINAL AFS Three Jewels 15 10 2022 compressed.pdf5 Nov 2022
Disclosure of sold/ booked inventoryFile: Three Jewels Inventory.pdf20 Oct 2022
Certificates of CA (Form 3)File: Form 3 Three Jewels_compressed.pdf20 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200250023237_For_Debtor_Based_Search_18_10_2022_11_12_00_730.pdf18 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Jewels Q2 arch cert.pdf11 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 15000 05 Snowflower Form 5.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Three Jewels.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: three jewels.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration Three Jewels.pdf7 Jul 2022
Certificates of CA (Form 3)File: Three Jewels CA Certificate_compressed.pdf7 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200241271327_For_Debtor_Based_Search_02_07_2022_12_53_58_806.pdf4 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration Three Jewels_compressed.pdf12 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2_Three Jewels.pdf8 Apr 2022
Certificates of CA (Form 3)File: CA_Three Jewels.pdf7 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234296019_For_Debtor_Based_Search_04_04_2022_17_10_58_235.pdf6 Apr 2022
Proforma of Allotment letterFile: AFS Completed Wings_compressed (1).pdf4 Mar 2022
Proforma of Allotment letterFile: AFS Ongoing Project_compressed.pdf4 Mar 2022
OtherFile: Three Jewels - OC for L M O buildings_compressed.pdf4 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Three Jewels.pdf20 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Three Jewels.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: Three Jewels-compressed.pdf14 Jan 2022
Certificates of CA (Form 3)File: Three Jewels-compressed.pdf7 Jan 2022
CERSAI detailsFile: Cersai.pdf6 Jan 2022
Proforma of Allotment letterFile: FINAL-AFS-Three Jewels-Flat- 29-12-2021.pdf30 Dec 2021
Details of encumbrancesFile: Snowflower_updated NIL encumbrance dec 21.pdf29 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Snowflower Three Jewels RERA Certificate.pdf29 Sep 2021
Proforma of Allotment letterFile: FINAL-AFS-Three Jewels-Flat- 06-07-2021.pdf22 Jul 2021
Proforma of Allotment letterFile: FINAL-AFS-Three Jewels-Flat- 25-06-2021.pdf29 Jun 2021
Certificates of CA (Form 5)File: Snowflower Three Jewels RERA Certificate.pdf30 Sep 2020
Proforma of Allotment letterFile: Three Jewels-Flat- 03-01-2020.pdf6 Jan 2020
Certificates of CA (Form 5)File: Signed certificate Three Jewels March 19.pdf29 Sep 2019
Proforma of Allotment letterFile: Three Jewels-Flat- 10-09-2019.pdf26 Sep 2019
Details of encumbrancesFile: Encumbrances.pdf10 Sep 2019
Proforma of Allotment letterFile: Revised Allotment Letter and Application Form Three Jewels.pdf11 Oct 2018
Certificates of CA (Form 5)File: Form 5_Three Jewels Residential_FY 2017-2018.pdf1 Oct 2018
Proforma of Allotment letterFile: Proforma Agreement_Three Jewels_Residential_Aug_2018.pdf21 Aug 2018
Proforma of Allotment letterFile: Proforma Agreement_Three Jewels_May 2018.pdf7 May 2018
Proforma of Allotment letterFile: Proforma Agreement_Three Jewels Residential_March 2018.pdf23 Mar 2018
Proforma of Allotment letterFile: Proforma Agreement_Three Jewels-Residentials.pdf16 Feb 2018
Proforma of Allotment letterFile: Proforma Allotment Letter and Agreement_Three Jewels_Residential_.pdf18 Aug 2017
Declaration in FORM BFile: Affidavit Cum Declaration-Three Jewels.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Residential_New.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Residential.pdf31 Jul 2017
Building plan approvalFile: Building approval Plan_Three Jewels.pdf30 Jul 2017
Layout approvalFile: Layout_Three Jewels.pdf30 Jul 2017
PAN CardFile: PAN Snowflower.pdf30 Jul 2017
Copy of the legal title reportFile: Search and Title Certificate.pdf30 Jul 2017
Details of encumbrancesFile: Details of Encumbrances.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Three Jewels- Phase IS no 43 Part 44 Part 45 Kondhwa BK Pune 411048812CompletedMar 2017Mar 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Three Jewels on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa13,700+ in Pune

2 kmThree JewelsCompleted 71Lapsed / revoked 41Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: Snowflower Properties Private Limited

Snowflower Properties Private Limited has 2 registrations on MahaRERA, including Three Jewels -Shops and Three Jewels. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Three Jewels is delayed beyond 29 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Three Jewels?

The registered promoter entity is Snowflower Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Three Jewels?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Three Jewels?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Three Jewels?

The professionals named in the filing: Architect: Jagadish P Deshpande; Engineer: JW Consultant LLP; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Three Jewels?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Three Jewels. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Three Jewels to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.