THE WORK CLUB HADAPSAR

By Ravima Developer

RG-MH-53872 · RERA P52100053032 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
2 of 11Construction stages donefurthest along: Basement (if any), 70%
15 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

THE WORK CLUB HADAPSAR is a Commercial project by Ravima Developer in Pune, Maharashtra, registered with MahaRERA as P52100053032 on 10 Oct 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 1 of the 16 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE WORK CLUB HADAPSAR
  • TypeCommercial
  • Location
    • Survey No. 71/3/2C
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • RERA no.P52100053032
  • ReraGenie IDRG-MH-53872

Builder

  • NameRavima Developer
  • Entity typePartnership
  • PartnerSarvesh Ravindra Gadiya
  • Other registrations6 more →
  • Completed1 of 7
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed71 files

Current status

6%1 of 16 units booked
32.1%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA3201616

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

Wing A: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
Raj EngineersPune (M Corp.)Pune
Mahendra Sumant BadadePune (M Corp.)Pune
usha sumant badadePune (M Corp.)Pune
swati shrikant lonkarPune (M Corp.)Pune
Anita balasaheb lokhandePune (M Corp.)Pune
santosh sumant badadePune (M Corp.)Pune
Pawar Promotors, Builders and DevelopersPune (M Corp.)Pune
Munot Promotors & BuildersPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5775.35
Proposed, not sanctioned775 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMitha Nagar, Kondhwa Khurd, Pune
Estimated costRs 6.88 cr
Cost incurredRs 2.21 cr
Work done32.15%
BuildingWingEstimatedIncurred
Wing ANARs 6.25 crRs 2.05 cr
-NARs 62.50 lakhRs 16.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerAmol Hattarge
EngineerMahesh Kulkarni
Chartered AccountantChandorkar & Limaye
Chartered AccountantA R Baheti And Co
PartnerRole in project
Ravima Developer-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26122519009Dec 2025 → Dec 2027

Reason as filed by the promoterProject progress is delayed due to shortage of labour and material

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout Marked.pdf15 Jul 2026
Building plan approvalFile: A Wing.pdf14 Jul 2026
Building plan approvalFile: A Wing-1.pdf14 Jul 2026
Commencement certificateFile: CC.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1 Q1 2026-27.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2- Q1 2026-27.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 2026-27.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1 Q4-2025-26.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2- Q4 FY 2025-26.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 2025-26.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1 Q1 2024-25.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2- Q3 FY 2025-26.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3- Q3 FY 2025-26.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 Q1 2024-25.pdf12 Oct 2025
Withdrawal Update Form 2File: Form 2- Q1 2024-25.pdf12 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1 2024-25.pdf12 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf29 Sep 2025
Form 1File: Form 1 Q4 2024-25.pdf21 Jul 2025
Form 2File: Form 2- Q4 2024-25.pdf21 Jul 2025
Form 3File: Form 3 Q4 2024-25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Q4 2024-25.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2024-25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2024-25.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q4 2024-25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Q4 2024-25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3-2024-25.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-2024-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q3 2024-25.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Q3-2024-25.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q2 2024-25.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Q1 2024-25.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA Form 2A Phese II FY 2023-24.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Q1 2024-25.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2024-25.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 2024-25.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 2023-24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 2023-24.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 2023-24.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Q4 2023-24.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Q4 2023-24.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 2023-24.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3-TWCH.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3- TWCH.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Q3-TWCH.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-TWCH.pdf17 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTREST IN OTHER REAL ESTATE ORGANIZATION (2).pdf9 Sep 2023
CERSAI detailsFile: DECLERATION OF CERSAI REPORT.pdf1 Sep 2023
Copy of the legal title reportFile: Search Report.pdf28 Aug 2023
Copy of the legal title reportFile: Title Report.pdf28 Aug 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE PHASE II.pdf25 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate.pdf11 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: decleration about sepearte bank account.pdf10 Aug 2023
Deviation Report with respect to Allotment letterFile: allotment letter deviation.pdf10 Aug 2023
Building plan approvalFile: building Plan.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: building Plan.pdf9 Aug 2023
Declaration in FORM BFile: form B.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: Decleration of Encubrances Concerned tolegal.pdf21 Jul 2023
Details of encumbrances concerned to FinanceFile: Decleration of encumbrances Concerned to finance.pdf21 Jul 2023
Details of encumbrances concerned to LegalFile: Decleration of Encubrances Concerned tolegal.pdf21 Jul 2023
Details of encumbrances concerned to LegalFile: Decleration of encumbrances Concerned to finance.pdf21 Jul 2023
Declaration about Commencement CertificateFile: Decleration about Commencement Certificate.pdf21 Jul 2023
Proforma of Allotment letterFile: Allotment letter.pdf21 Jul 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (1).pdf21 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf17 Jul 2023
Layout approvalFile: layout Plan_.pdf15 Jul 2023
Copy of Layout Approval (in case of layout)File: layout Plan_.pdf15 Jul 2023
PAN CardFile: PAN Ravima Developer.pdf30 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NEWTON HOMES HADAPSAR PHASE-IP52100016522Hadapsar, Pune57May 2018CompletedApr 2023Mar 2022

How this compares with Pune

6%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE WORK CLUB HADAPSAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

Builder: Ravima Developer

Ravima Developer has 7 registrations on MahaRERA, including THE WORK CLUB PHASE I and THE WORK CLUB PHASE II. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE WORK CLUB HADAPSAR is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE WORK CLUB HADAPSAR?

The registered promoter entity is Ravima Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE WORK CLUB HADAPSAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE WORK CLUB HADAPSAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE WORK CLUB HADAPSAR?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Amol Hattarge; Engineer: Mahesh Kulkarni; Chartered Accountant: Chandorkar & Limaye; Chartered Accountant: A R Baheti And Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE WORK CLUB HADAPSAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE WORK CLUB HADAPSAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE WORK CLUB HADAPSAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.