Home / Browse projects / Nashik, Maharashtra / THE SOLITAIRE

Registered No litigation declared Others project

THE SOLITAIRE

By SUPREME FORTUNE DEVELOPERS LLP

RG-MH-47631 · RERA P51600048261 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 92%
48 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

THE SOLITAIRE is a Others project by SUPREME FORTUNE DEVELOPERS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600048261 on 22 Dec 2022. Possession is promised by 31 Dec 2027. 8 of the 56 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE SOLITAIRE
  • TypeOthers
  • Location
    • GANGAPUR ROAD
    • OPP VP'S HOTEL
    • Nashik
    • 422013
  • Pincode422013
  • RERA no.P51600048261
  • ReraGenie IDRG-MH-47631

Builder

  • NameSUPREME FORTUNE DEVELOPERS LLP
  • Entity typePartnership
  • PartnersCHINTAN NARENDRA MUTHA, SUNNY NARENDRA PARAKH, MILAN HASMUKH PATEL, HITESH GOVIND DEO, PARTH SANJAY PATEL, TEJAS SANJAY PATEL, SAMEER RAJENDRA TOTALE, ABHISHEK PANDIT BIRARI, KIRTI SURESH JAIN, AKASH PANDIT BIRARI, PRITESH GOVIND DEO

Key dates

this monthRegisteredDec 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Dec 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

14%8 of 56 units booked
64.1%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE SOLITAIRENA2323411556

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.

THE SOLITAIRE: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered41
Open Space20

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,005 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
AJIT BASANTKUMAR HISARIYANashikNashik
GAUTAM BASANTKUMAR HISARIYANashikNashik
BASANTKUMAR BANWARILAL HISARIYANashikNashik

Approvals and building plan

Sanctioning authorityNashik Muncipal Corporation
Permissible FSI9757.87
Proposed, not sanctioned9,758 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTAK MAHINDRA BANK, NASIK, THATTE NAGAR ROAD, NASHIK
Estimated costRs 26.00 cr
Cost incurredRs 16.68 cr
Work done64.14%
BuildingWingEstimatedIncurred
THE SOLITAIRENARs 25.00 crRs 16.04 cr
-NARs 1.00 crRs 64.14 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT KUMATH
EngineerTUSHAR S SATOTE
EngineerKanchan Balasaheb Tupe
Chartered AccountantCA BHAVANA BHUSHAN LOYA
Chartered AccountantChetan Anand & Co
PartnerRole in project
SUPREME FORTUNE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf26 May 2026
Withdrawal Update Form 2File: Form-2.pdf26 May 2026
Withdrawal Update Form 3File: Form 3 final.pdf26 May 2026
Form 5 (FY 2024-2025)File: Form 5 Supreme Fortune LLP.pdf6 May 2026
Withdrawal Update Form 1File: Supreme Fortune LLP Architech Certificate_0001_0001.pdf10 Feb 2026
Withdrawal Update Form 2File: Supreme Fortune LLP Engineers Certificate_0001.pdf10 Feb 2026
Withdrawal Update Form 3File: Final Form 3_compressed.pdf10 Feb 2026
Withdrawal Update Form 1File: Form1 Q2.pdf28 Nov 2025
Withdrawal Update Form 2File: Form2 Q2.pdf28 Nov 2025
Withdrawal Update Form 3File: The Solitaire Form-3_0001.pdf28 Nov 2025
Withdrawal Update Form 1File: ARCHITECTu0027S CERTIFICATE ( SUPREME FORTUNE LLP )_0001.pdf18 Sep 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf18 Sep 2025
Withdrawal Update Form 3File: Supreme_Form 3 compressed.pdf18 Sep 2025
Form 1File: The Solitaire Architech Certificate_0001.pdf20 May 2025
Form 2File: The Solitaire Engineers Certificate_0001.pdf20 May 2025
Form 3File: The Solitaire CA cerificate_0001.pdf20 May 2025
Proforma of Agreement for saleFile: Draft Agreement for Sale Solitaire.pdf8 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 23-24 Architech Certificate 4_0001.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 Architech Certificate 3_0001.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 Architech Certificate_0001.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 Architech Certificate 2_0001.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q4 23-24_c.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q1_c.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q2_c.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q3_c.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 23-24 Engineers Certificate 4_0001.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 Engineers Certificate 3_0001.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 Engineers Certificate_0001.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Engineers Certificate 2_0001.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Qtr-3.pdf26 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate qtr-3_compressed.pdf26 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q3.pdf26 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate qtr-2 23-24.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate qtr-2 FY 23-24.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 new.pdf2 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-solitaire.PDF31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2Architectcert solitaire-June_2023.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1Engineer Certificate Qtr-1 Fy23-24.pdf14 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4Form 2A Certificate Qtr-1 Fy23-24.pdf14 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3ca certificate-_merged.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi-cert.pdf27 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate Qtr-4-UPLOAD.pdf27 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate_11zon.pdf27 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_1_11zon.pdf8 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf8 Feb 2023
Details of encumbrances concerned to FinanceFile: Declaration encumbrances- Finance-.pdf7 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration encumbrances- Finance-.pdf7 Dec 2022
Other - FinanceFile: Declaration encumbrances- Finance-.pdf29 Nov 2022
Layout approvalFile: HPSCANNER1438.pdf9 Nov 2022
Building plan approvalFile: HPSCANNER14341.pdf9 Nov 2022
Building plan approvalFile: HPSCANNER14353.pdf9 Nov 2022
Building plan approvalFile: HPSCANNER14364.pdf9 Nov 2022
Building plan approvalFile: HPSCANNER14375.pdf9 Nov 2022
PAN CardFile: SUPREME FORTUNE PAN1.pdf9 Nov 2022
Copy of the legal title reportFile: Final Legal Title Report-2.pdf9 Nov 2022
Details of encumbrances concerned to FinanceFile: Declaration encumbrances - Legal-.pdf9 Nov 2022
Details of encumbrances concerned to LegalFile: Declaration encumbrances - Legal-.pdf9 Nov 2022
Copy of Layout Approval (in case of layout)File: HPSCANNER1438.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER14341.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER14353.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER14364.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER14375.pdf9 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Nov 2022
Declaration about Commencement CertificateFile: Declaration commencement.PDF9 Nov 2022
Declaration in FORM BFile: FormB (SFDLLP).pdf9 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate SFDLLP.pdf9 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf9 Nov 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.PDF9 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200251646524_For_Asset_Based_Search_08_11_2022_16_12_49_997.pdf9 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200251646728_For_Debtor_Based_Search_08_11_2022_16_14_59_344.pdf9 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Nov 2022
Proforma of Agreement for saleFile: Model Form Of Agreement.pdf9 Nov 2022
Proforma of Allotment letterFile: proforma of alottment1.pdf9 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.PDF9 Nov 2022
Deviation Report with respect to Allotment letterFile: No Deviation in Allotment.PDF9 Nov 2022
Deviation Report with respect to model copy of AgreementFile: SOLITAIRE.PDF9 Nov 2022

How this compares with Nashik

14%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE SOLITAIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP VP'S HOTEL4,100+ in Nashik

Builder: SUPREME FORTUNE DEVELOPERS LLP

SUPREME FORTUNE DEVELOPERS LLP has 1 registration on MahaRERA, including THE SOLITAIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if THE SOLITAIRE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE SOLITAIRE?

The registered promoter entity is SUPREME FORTUNE DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE SOLITAIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE SOLITAIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE SOLITAIRE?

The professionals named in the filing: Architect: SUMIT KUMATH; Engineer: TUSHAR S SATOTE; Engineer: Kanchan Balasaheb Tupe; Chartered Accountant: CA BHAVANA BHUSHAN LOYA; Chartered Accountant: Chetan Anand & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE SOLITAIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE SOLITAIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE SOLITAIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.