Home / Browse projects / Nashik, Maharashtra / The River

Registered No litigation declared Residential / Group Housing project

The River

By Surana Fortune Realtors

RG-MH-07038 · RERA P51600076804 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 50%
88 of 96Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

The River is a Residential / Group Housing project by Surana Fortune Realtors in Nashik, Maharashtra, registered with MahaRERA as P51600076804 on 28 Jun 2024. Possession is promised by 31 Dec 2029. 8 of the 96 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete.

At a glance

Project

  • NameThe River
  • TypeResidential / Group Housing
  • Location
    • Off Gangapur Road
    • Near Bendkule Nagar
    • Anandwalli
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600076804
  • ReraGenie IDRG-MH-07038

Builder

  • NameSurana Fortune Realtors
  • Entity typePartnership
  • PartnersShrenik Shashikant Surana, Manik Anilkumar Karwa, Chintan Narendra Mutha, Sameer Rajendra Totale, Kirti Suresh Jain, Sunny Narendra Parakh, Jayesh Anilkumar Karwa

Key dates

this monthRegisteredJun 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed80 files

Current status

8%8 of 96 units booked
17.2%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA252222022
Building BNA322952052
Building CNA252222022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 50%.

Building A18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B15%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks6%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed366

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots366
Closed/Covered366
BuildingClosed/CoveredTotal
Building A100100
Building B166166
Building C100100

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,233 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Mahendra Hiraman PawarNashikNashik
Vijay Hiraman PawarNashikNashik
Atul Vijay PawarNashikNashik
Amol Vijay PawarNashikNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI30756.25
Proposed, not sanctioned30,756 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchU-1, Crown Commercial Complex, Opp Rajiv Gandhi Bhavan, Utility Centre, Sharanpur Road, Nashik
Estimated costRs 67.50 cr
Cost incurredRs 11.63 cr
Work done17.23%
BuildingWingEstimatedIncurred
Building BNARs 30.10 crRs 2.71 cr
Building ANARs 17.70 crRs 2.65 cr
Building CNARs 17.70 crRs 5.66 cr
-NARs 2.00 crRs 60.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sumit Kumath and Associates
EngineerSagar Shah
Chartered AccountantNirav Shailesh Shah & Co.
Chartered AccountantSaril Shah & Associates
PartnerRole in project
Surana Fortune Realtors-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 25-26 Q4.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 25-26 Q3.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 SD 25-26 Q3.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 25-26 Q3.pdf19 May 2026
Withdrawal Update Form 2File: Form 2 25-26 Q3.pdf19 May 2026
Withdrawal Update Form 3File: Form 3 SD 25-26 Q3.pdf19 May 2026
Form 5 (FY 2025-2026)File: Form 5 - 2025-26.pdf19 May 2026
Building plan approvalFile: Revised Plan_April25_1.pdf19 Nov 2025
Building plan approvalFile: Revised Plan_April25_2.pdf19 Nov 2025
Building plan approvalFile: Revised Plan_April25_3.pdf19 Nov 2025
Building plan approvalFile: Revised Plan_April25_4.pdf19 Nov 2025
Building plan approvalFile: Revised Plan_April25_5.pdf19 Nov 2025
Building plan approvalFile: Revised Plan_April25_6.pdf19 Nov 2025
Building plan approvalFile: Revised Plan_April25_7.pdf19 Nov 2025
Commencement certificateFile: Revised Commencement_Certificate_April_2025.pdf19 Nov 2025
Withdrawal Update Form 1File: Form 1 25-26 Q2.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 25-26 Q2.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 SD 25-26 Q2.pdf19 Nov 2025
Form 1File: Form 1 25-26 Q1.pdf8 Nov 2025
Form 2File: Form 2 25-26 Q1.pdf8 Nov 2025
Form 3File: Form 3 SD 25-26 Q1.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory 30-06-2025.pdf8 Nov 2025
Form 1File: Form 1 24-25 Q4.pdf8 Nov 2025
Form 2File: Form 2 24-25 Q4.pdf8 Nov 2025
Form 3File: Form 3 SD 24-25 Q4.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-03-2025.pdf8 Nov 2025
Form 1File: Form 1.pdf8 Nov 2025
Form 2File: Form 2.pdf8 Nov 2025
Form 3File: Form 3.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q2.pdf8 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf8 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q4.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q4.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q4.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory 31-03-2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Q2.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Verification of CC.pdf13 Jun 2024
Building plan approvalFile: 1.pdf14 May 2024
Building plan approvalFile: 2.pdf14 May 2024
Building plan approvalFile: 3.pdf14 May 2024
Building plan approvalFile: 4.pdf14 May 2024
Building plan approvalFile: 5.pdf14 May 2024
Building plan approvalFile: 6.pdf14 May 2024
Building plan approvalFile: 7.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf14 May 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 May 2024
Other - LegalFile: Partnership Deed.pdf14 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance - Financial.pdf27 Apr 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance - Legal.pdf27 Apr 2024
Details of encumbrances concerned to LegalFile: No Encumbrance - Financial.pdf27 Apr 2024
Details of encumbrances concerned to LegalFile: No Encumbrance - Legal.pdf27 Apr 2024
CERSAI detailsFile: Cersai Decalartion.pdf27 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf27 Apr 2024
Deviation Report with respect to Allotment letterFile: No Deviation - Allotment letter.pdf27 Apr 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement For Sale.pdf27 Apr 2024
Other - TechnicalFile: Annexure A Order 50.pdf27 Apr 2024
Layout approvalFile: Plot Layout.pdf17 Apr 2024
PAN CardFile: PAN.pdf17 Apr 2024
Copy of the legal title reportFile: Title Report.pdf17 Apr 2024
Copy of Layout Approval (in case of layout)File: Plot Layout.pdf17 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf17 Apr 2024
Declaration in FORM BFile: Form B - Promoter.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest.pdf17 Apr 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf17 Apr 2024
Proforma of Allotment letterFile: Allotment Letter.pdf17 Apr 2024

How this compares with Nashik

8%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The River on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Bendkule Nagar, Anandwalli4,100+ in Nashik

2 kmThe RiverCompleted 52Lapsed / revoked 12Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: Surana Fortune Realtors

Surana Fortune Realtors has 1 registration on MahaRERA, including The River. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if The River is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The River?

The registered promoter entity is Surana Fortune Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The River?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The River?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The River?

The professionals named in the filing: Architect: Ar. Sumit Kumath and Associates; Engineer: Sagar Shah; Chartered Accountant: Nirav Shailesh Shah & Co.; Chartered Accountant: Saril Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The River?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The River. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The River to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.