Registered No litigation declared Residential / Group Housing project

THE ORCHID

By RUDANI REALTY

RG-MH-64017 · RERA P51800034630 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 25.00 crore secured on the land, in favour of Truhome Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
0 of 11Construction stages donefurthest along: Slabs of Super Structure, 89%
55 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

THE ORCHID is a Residential / Group Housing project by RUDANI REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034630 on 20 Apr 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 9 of the 64 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE ORCHID
  • TypeResidential / Group Housing
  • Location
    • CTS NO 20B MODEL TOWN MULUND WEST MUMBAI
    • MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034630
  • ReraGenie IDRG-MH-64017

Builder

  • NameRUDANI REALTY
  • Entity typePartnership
  • PartnersVIJAY MATHURADAS BHANSALI, MOHAMMED ASLAM SHAIKH, SUNIL RAMESH BHANUSHALI, Ritesh Harish Thakkar

Key dates

this monthRegisteredApr 2022First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Apr 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed100 files

Current status

14%9 of 64 units booked
29.8%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE ORCHIDNA251964064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 89%.

THE ORCHID: 55% average across the applicable activities

ActivityProgress
Excavation85%
Basement (if any)75%
Podiums (if any)60%
Plinth75%
Stilt Floor75%
Slabs of Super Structure89%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises27%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed140

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots140
Closed/Covered140

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,395 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTruhome Finance Limited
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on11 Jun 2026
LandownerVillageDistrict
RUDANI REALTYKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI9281.29
Proposed, not sanctioned645 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 5/67, JALARAM ASHISH SOCIETY, DEVIDAYAL ROAD, OPP RAJ HOSPITAL MULUND WEST MUMBAI 400080
Estimated costRs 44.19 cr
Cost incurredRs 13.14 cr
Work done29.75%
BuildingWingEstimatedIncurred
THE ORCHIDNARs 42.00 crRs 13.14 cr
-NARs 2.19 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR P Asundaria
EngineerAssociated Structural Consultants LLP
Chartered AccountantCA Lucky K Sharma
Chartered AccountantCA Ronak Manek
Chartered AccountantCA Lucky Sharma
PartnerRole in project
RUDANI REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09032620141Mar 2026 → Mar 2027

Reason as filed by the promoterHandover of 5% amenities plot to BMC and notation of BMC name on property card

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 From Architects - June 2026_DG Sign.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ June 2026_DG Sign.pdf4 Aug 2026
Withdrawal Update Form 3File: RR Form 3 - June 2026_DG Sign_Com.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 From Architects - March 2026_Sign.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ March 2026_Sign.pdf27 Jul 2026
Withdrawal Update Form 3File: RR Form 3 - March 2026_Sign.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 From Architects - December 2025_Sign.pdf24 Mar 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ December 2025_Sign.pdf24 Mar 2026
Withdrawal Update Form 3File: RR Form 3 - December 2025_Revised 17-03-2026_Com.pdf24 Mar 2026
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1 From Architects - September 2025_Sign.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1 From Architects - December 2025_Sign.pdf9 Mar 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ June 2025.pdf9 Mar 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ September 2025_Sign.pdf9 Mar 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ December 2025_Sign.pdf9 Mar 2026
Withdrawal Update Form 3File: RR Form 3 - June 2025.pdf9 Mar 2026
Withdrawal Update Form 3File: RR Form 3 - September 2025_Sign.pdf9 Mar 2026
Withdrawal Update Form 3File: RR Form 3 - December 2025.pdf9 Mar 2026
Form 5 (FY 2024-2025)File: RR_The Orchid Form 5 - FY 2024-2025.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1 From Architects - December 2025_Sign.pdf7 Mar 2026
Withdrawal Update Form 2File: Form 2 from Structural Engineer_ December 2025_Sign.pdf7 Mar 2026
Withdrawal Update Form 3File: RR Form 3 - December 2025.pdf7 Mar 2026
Form 1File: Form 1 From Architects - March 2025.pdf25 Aug 2025
Form 2File: Form 2 from Structural Engineer_ March 2025_Compress.pdf25 Aug 2025
Form 3File: RR Form 3 - March 2025_Compress.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold or Unsold Unit Calculation_March 2025.pdf25 Aug 2025
Form 1File: Form 1 From Architects - December 2024.pdf2 Aug 2025
Form 3File: RR Form 3 - December 2024_Compress.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold or Unsold Unit Calculation_December 2024.pdf2 Aug 2025
Form 2File: Form 2 from Structural Engineer_ December 2024_Digital Sign.pdf2 Aug 2025
Disclosure of sold/ booked inventoryFile: Sold or Unsold Unit Calculation_December 2023.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold or Unsold Unit Calculation_March 2024.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold or Unsold Unit Calculation_June 2024.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold or Unsold Unit Calculation_September 2024.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold or Unsold Unit Calculation_December 2024.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - December 2024_signed_.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_ December 2024_Digital Sign.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rudani Realty-Form 3 Sept-24 SIGNED.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - September 2024_Signed.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - September 2024_Signed.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: REVALIDATION CC TILL 04-04-2025.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - June 2024_Compress.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_June 2024_Signed.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_Mar2023.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RR Form 2A [2023-2024].pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - June 2024_Signed__.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RR_The Orchid Form 5 - FY 2023-2024_Signed.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - December 2023.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2024_Compress.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects_March 2024.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_March 2024.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects_December 2023.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_December 2023.pdf13 Feb 2024
Proforma of Agreement for saleFile: MahaRERA Draft copy of AFS- RR The orchid.pdf20 Dec 2023
Proforma of Agreement for saleFile: RR AFS Ann A B D E G F.pdf20 Dec 2023
Deviation Report with respect to model copy of AgreementFile: RR_The Orchid - Deviation in Draft of AFS.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_June 2023_With Sign.pdf18 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_September 2023_With Sign.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - September 2022_Compress.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - Dec 2022_Compress.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - March 2023_Compress.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - June 2023_Compress.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RR Form 3 - September 2023_Compress.pdf18 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RR_The Orchid Form 5 - FY 2022-2023.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_June 2022_Revised1.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects_September 2022_Revised1.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects_December 2022_Revised1.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects_March 2023_Final.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_June 2023.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_September 2023.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Rudani Realty_09072022_Signed.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_Sep2022.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_Dec2022.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_Mar2023_Final.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_July 2022.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2022.pdf22 Jun 2023

How this compares with Mumbai Suburban

14%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE ORCHID on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI6,700+ in Mumbai Suburban

2 kmTHE ORCHIDCompleted 65Lapsed / revoked 47Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 192 registered projects within 2 km.

Builder: RUDANI REALTY

RUDANI REALTY has 1 registration on MahaRERA, including THE ORCHID. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE ORCHID is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ORCHID?

The registered promoter entity is RUDANI REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ORCHID?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE ORCHID?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ORCHID?

The professionals named in the filing: Architect: R P Asundaria; Engineer: Associated Structural Consultants LLP; Chartered Accountant: CA Lucky K Sharma; Chartered Accountant: CA Ronak Manek; Chartered Accountant: CA Lucky Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ORCHID?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ORCHID. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ORCHID to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.