ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / THE NEW ANAND DEEP CHS LTD

Registered No litigation declared Others project

THE NEW ANAND DEEP CHS LTD

By SHREEJEE BUILDCON

RG-MH-64283 · RERA P51800048097 · Last updated on MahaRERA portal: 7 Oct 2025

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Rs 20.00 crore secured on the land, in favour of HERO HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
18 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

THE NEW ANAND DEEP CHS LTD is a Others project by SHREEJEE BUILDCON in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048097 on 8 Dec 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 38 of the 56 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameTHE NEW ANAND DEEP CHS LTD
  • TypeOthers
  • Location
    • BP CROSS ROAD NO 1 AND DR R P ROAD
    • MULUND WEST MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048097
  • ReraGenie IDRG-MH-64283

Builder

  • NameSHREEJEE BUILDCON
  • Entity typePartnership
  • PartnerHARESH DHIRAJLAL BHANUSHALI

Key dates

1 months past promisethis monthRegisteredDec 2022PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2022
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed123 files

Current status

68%38 of 56 units booked
50.5%Work done, per cost certificate

Figures as on 7 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 1NA452142345
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 2NA111111011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 159%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks77%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.23%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 246%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks47%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%

Progress on shared amenities15

As on 7 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56
BuildingClosed/CoveredTotal
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 14747
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 299

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,388 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofHERO HOUSING FINANCE LIMITED
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on3 Oct 2025
LandownerVillageDistrict
SHREEJEE BUILDCONKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI7492.5
Proposed, not sanctioned5,515 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch6 AND 11 NEW HAPPY LIFE SOCIETY RHB ROAD MULUND WEST MUMBAI 400080
Estimated costRs 35
Cost incurredRs 18
Work done50.49%
BuildingWingEstimatedIncurred
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 1NARs 24Rs 15
THE NEW ANAND DEEP CHS LTD SALE BUILDING NO 2NARs 11Rs 2

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACE Consultants
EngineerAssociated Structural Consultants LLP
Chartered AccountantCA GANESH A BHOGALE
Chartered AccountantCA Ronak Manek
PartnerRole in project
SHREEJEE BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf7 Oct 2025
Withdrawal Update Form 1File: Form 1 From Architects - June 2025.pdf7 Oct 2025
Withdrawal Update Form 2File: Form 2 from Structural Engineer - June 2025.pdf7 Oct 2025
Withdrawal Update Form 2File: Form 2 from Structural Engineer - June 2025.pdf7 Oct 2025
Withdrawal Update Form 3File: SB NAD Form 3 - June 2024_signed.pdf7 Oct 2025
Withdrawal Update Form 3File: SB NAD Form 3 - June 2024_signed.pdf7 Oct 2025
Form 1File: Form 1 From Architects - June 2025.pdf25 Aug 2025
Form 2File: Form 2 from Structural Engineer - June 2025.pdf25 Aug 2025
Form 3File: SB NAD Form 3 - June 2025.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory - June 2025.pdf25 Aug 2025
OthersFile: RERA Bank Account Changes - Annexure A.pdf25 Aug 2025
Form 1File: Form 1 From Architects - March 2025_Compress.pdf2 Aug 2025
Form 2File: Form 2 from Structural Engineer - March 2025_Compress.pdf2 Aug 2025
Form 3File: SB NAD Form 3 - March 2025_Compress.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory - March 2025.pdf2 Aug 2025
Form 1File: Form 1 From Architects - December 2024.pdf2 Aug 2025
Form 2File: Form 2 from Structural Engineer - December 2024_Compress.pdf2 Aug 2025
Form 3File: SB NAD Form 3 - December 2024_Digital Sign.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory - December 2024_Compress.pdf2 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SB NAD Form 3 - December 2024_Digital Sign.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - September 2024_Signed.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SB NAD Form 3 - September 2024_Signed_Compress.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - September 2024_Signed.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: SB NAD - Further CC.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - June 2024_Compress.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - June 2024.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SB NAD - Form 2A [2023-2024].pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SB NAD Form 3 - June 2024_signed.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SB NAD ANNUAL REPORT- FY 2023-2024_Signed_compressed.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - March 2024.pdf22 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - March 2024.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised SB NAD Form 3 - March 2024.pdf16 May 2024
Commencement Certificates / NA Order for plotted developmentFile: SB NAD Further CC - AD Building.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - December 2023.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - December 2023.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SB NAD Form 3 - December 2023.pdf26 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SB NAD ANNUAL REPORT - FY 2022-2023_Ronak Manek_With Sign.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - September 2023_With Sign.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - September 2023.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory - Sept 2023_.pdf31 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SB NAD Form 3 - Sept 2023 - Final_.pdf31 Oct 2023
Proforma of Agreement for saleFile: New Draft of AFS - SB NAD.pdf29 Sep 2023
Proforma of Allotment letterFile: New Draft of Allotment Letter.pdf29 Sep 2023
Deviation Report with respect to model copy of AgreementFile: SB - Deviation in Agrement for Sale.pdf29 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrances Concern to Finance.pdf7 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrances Concern to Finance.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - June 2023.pdf7 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - June 2023.pdf7 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreejee Buildcon - Form 3_June 2023.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - December 2022.pdf10 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From Architects - March 2023.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer_Sign_Com.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - December 2022_Com.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from Structural Engineer - March 2023_Com.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - December 2022_Com.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - March 2023_Com.pdf10 Jul 2023
Details of encumbrances concerned to FinanceFile: Details of Encumbrances - Financial.pdf28 Nov 2022
Details of encumbrances concerned to LegalFile: Details of Encumbrances - Financial.pdf28 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - SB.pdf28 Nov 2022
Other - FinanceFile: Details of Allotted Units.pdf28 Nov 2022
Copy of the legal title reportFile: Legal Title Report 12112022.pdf14 Nov 2022
Proforma of Agreement for saleFile: Draft Copy of Agreement for Sale - SB_NAD.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure A.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure A 1.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure B.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure B (1).pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure C.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure D.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure E.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure F.pdf14 Nov 2022
Proforma of Agreement for saleFile: Annexure G.pdf14 Nov 2022
Details of encumbrances concerned to FinanceFile: Details of Encumbrances - SB.pdf3 Nov 2022
Details of encumbrances concerned to LegalFile: Details of Encumbrances - SB.pdf3 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A'.pdf21 Oct 2022
Layout approvalFile: Amended IOA and DWG -Sale Building No1-3.pdf14 Oct 2022
Layout approvalFile: Amended IOA and DWG -Sale Building No1-4.pdf14 Oct 2022
Layout approvalFile: Amended IOA and DWG -Sale Building No1-5.pdf14 Oct 2022
Layout approvalFile: Amended IOA and DWG -Sale Building No1-6.pdf14 Oct 2022
Layout approvalFile: Amended IOA and DWG -Sale Building No1-7.pdf14 Oct 2022
Building plan approvalFile: Amended IOA and DWG -Sale Building No1-3.pdf14 Oct 2022

How this compares with Mumbai Suburban

68%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE NEW ANAND DEEP CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST MUMBAI6,700+ in Mumbai Suburban

2 kmTHE NEW ANAND DEEP CHS LCompleted 95Lapsed / revoked 73Other 131Dot size: filed unitsN

Filed coordinates, straight-line distance. 299 registered projects within 2 km.

Builder: SHREEJEE BUILDCON

SHREEJEE BUILDCON has 1 registration on MahaRERA, including THE NEW ANAND DEEP CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE NEW ANAND DEEP CHS LTD is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE NEW ANAND DEEP CHS LTD?

The registered promoter entity is SHREEJEE BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE NEW ANAND DEEP CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE NEW ANAND DEEP CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE NEW ANAND DEEP CHS LTD?

The professionals named in the filing: Architect: ACE Consultants; Engineer: Associated Structural Consultants LLP; Chartered Accountant: CA GANESH A BHOGALE; Chartered Accountant: CA Ronak Manek. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE NEW ANAND DEEP CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE NEW ANAND DEEP CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE NEW ANAND DEEP CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.