The Metrozone Kingston D2
By Sanklecha Construction Private Limited
RG-MH-01509 · RERA P51600005490 · Last updated on MahaRERA portal: 25 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 96 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Metrozone Kingston D2 is a Residential / Group Housing project by Sanklecha Construction Private Limited in Nashik, Maharashtra, registered with MahaRERA as P51600005490 on 11 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 0 of the 1 unit on this registration is recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameThe Metrozone Kingston D2
- TypeResidential / Group Housing
- Location
- Pathardi Road
- Indiranagar
- Nashik (M Corp.)
- Nashik
- 422009
- Pincode422009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600005490
- ReraGenie IDRG-MH-01509
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed64 files
Current status
Figures as on 25 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kingstone D2 | NA | 14 | 14 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 55%.
Kingstone D2: 41% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Anwar Hussain Thim | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G V Katale & Assocites K Katale |
| Chartered Accountant | Jiwan B Bedmutha |
| Partner | Role in project |
|---|---|
| Sanklecha Construction Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdelay in Govt. Permission like Environment & Corporation sanction, Covid 19 New Laws and Demonetization
Reason as filed by the promoter1. Impact of COVID-19 Pandemic - The nationwide lockdowns, restriction of labor movement, and disruption in supply chains during and after the COVID-19 pandemic significantly impacted construction activities. This led to unforeseen delays in execution timelines. 2. Shortage of Skilled Labor and Materials - Post-COVID, there was a severe shortage of construction labor and materials like steel, cement, and other key components, leading to further delay in progress. 3. Financial Constraints - Due to market conditions, there was a delay in realization of receivables from customers and fund disburs
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 31/2011 | Civil Judge Senior Division Nashik | Pending on Exhibit hearing |
| 144/2014 | Civil Judge Senior Division Nashik | Pending on Exhibit hearing |
| 744/2012 | Civil Judge Senior Division Nashik | Pending on Exhibit hearing |
| 229/2012 | Civil Judge Senior Division Nashik | Pending on Exhibit hearing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC001000000010152 | BRIGADIER RANBIR SINGH LAMBA | M/S SANKLECHA CONSTRUCTIONS PVT LTD | 30/08/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: D2 Form 1 2425 Q4.pdf | 25 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: D2 Form 1 2526 Q1.pdf | 25 Jul 2025 |
| Certificates of CA (Form 3)File: D2 Form 3 2425 Q4.pdf | 25 Jul 2025 |
| Certificates of CA (Form 3)File: D2 Form 3 2526 Q1.pdf | 25 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D2 Form 2 2425 Q4.pdf | 25 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D2 Form 2 2526 Q1.pdf | 25 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: D2 Inventory 2425 Q4.pdf | 25 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: D2 Inventory 2526 Q1.pdf | 25 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: D2 Form 5.pdf | 25 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: Legal Declaration.pdf | 9 Apr 2025 |
| Proforma of Allotment letterFile: allottement letter.pdf | 9 Apr 2025 |
| Declaration in FORM BFile: D2 Form B PAS.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cerificate D2.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate D2.pdf | 9 Apr 2025 |
| Declaration about Commencement CertificateFile: Commencement Declartion.pdf | 9 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Developer Declaration.pdf | 9 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: Allotment Deviation.pdf | 9 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Legal Declaration.pdf | 9 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: ATS Deviation.pdf | 9 Apr 2025 |
| Proforma of Agreement for saleFile: Draft of ATS D2.pdf | 9 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSRE OF REAL ESTATE PKS.pdf | 9 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSRE OF REAL ESTATE TVS.pdf | 9 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Declaration.pdf | 9 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Unsecured loan declarion.pdf | 9 Apr 2025 |
| Certificates of CA (Form 3)File: D2 CA Certificate Form 3 2324 Q4.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: D2 CA Certificate Form 3 2425 Q1.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: D2 CA Certificate Form 3 2425 Q2.pdf | 29 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D2 Engineer certificate 2324 Q4.pdf | 29 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D2 Engineer certificate 2425 Q1.pdf | 29 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: D2 Engineer certificate 2425 Q2.pdf | 29 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold - Booked Inventory D2 2324 Q4.pdf | 29 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold - Booked Inventory D2 2425 Q1.pdf | 29 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold - Booked Inventory D2 2425 Q2.pdf | 29 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer certificate for Quality Assurance_0001.pdf | 29 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: D2 CA Certificate Form 5 2324 Q4.pdf | 29 Nov 2024 |
| Certificates of CA (Form 3)File: D2 Q1.pdf | 20 Feb 2024 |
| Certificates of CA (Form 3)File: D2 Q3.pdf | 20 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 D2 Q1.pdf | 19 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 D2 Q2.pdf | 19 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 D2 Q3.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 D2 Q1.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 D2 Q2.pdf | 19 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 D2 Q3.pdf | 19 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: inventory D2.pdf | 19 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 D2.pdf | 24 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: D2 1920.pdf | 24 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: D2 2021.pdf | 24 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: D2 2122.pdf | 24 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: D2 2223.pdf | 24 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: d21718.pdf | 27 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: d21819.pdf | 27 Nov 2020 |
| Certificates of CA (Form 3)File: Form 3 CA D-2.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: D2.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kingston D2- 1 to 3.pdf | 29 Jul 2017 |
| Layout approvalFile: Metrozone layout-ilovepdf-compressed.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building D2.pdf | 27 Jul 2017 |
| PAN CardFile: SCPL Pan Card.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: SEARCH REPORT TMZ-ilovepdf-compressed (1).pdf | 27 Jul 2017 |
| Details of encumbrancesFile: Encumbrances MZ.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Metrozone layout-ilovepdf-compressed.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building D2.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: TMZ SCPL kingston d-2-ilovepdf-compressed.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: Letter of Allotment.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: Agreement - Uploadable Metrozone - D2.pdf | 27 Jul 2017 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Mango Woods | Near Punydham Aashram Behind EKTA California NIBM Road Pisoli Pune | 78 | Completed | Jul 2016 | Late, Dec 2016 |
| The Comfort Zone | Near Ambad Talathi Office Ambad Nashik | 152 | Completed | Sep 2014 | Late, May 2017 |
| Garden County | Begind Hotel Jatra Adgaon Nashik | 224 | Completed | Apr 2013 | Late, Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep The Metrozone Kingston D2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Indiranagar4,100+ in Nashik
Filed coordinates, straight-line distance. 177 registered projects within 2 km.
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: Sanklecha Construction Private Limited
Sanklecha Construction Private Limited has 12 registrations on MahaRERA, including Waterways and The Metrozone Athens A1. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if The Metrozone Kingston D2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Metrozone Kingston D2?
The registered promoter entity is Sanklecha Construction Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Metrozone Kingston D2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against The Metrozone Kingston D2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for The Metrozone Kingston D2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Metrozone Kingston D2?
The professionals named in the filing: Architect: G V Katale & Assocites K Katale; Chartered Accountant: Jiwan B Bedmutha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Metrozone Kingston D2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback