ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / The Metrozone Athens A3

Completed No litigation declared Residential / Group Housing project

The Metrozone Athens A3

By Sanklecha Construction Private Limited

RG-MH-01449 · RERA P51600009518 · Last updated on MahaRERA portal: 20 Sep 2022

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

The Metrozone Athens A3 is a Residential / Group Housing project by Sanklecha Construction Private Limited in Nashik, Maharashtra, registered with MahaRERA as P51600009518 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2021. The completion date has moved by 30 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Metrozone Athens A3
  • TypeResidential / Group Housing
  • Location
    • WADALA
    • PATHARDI ROAD
    • INDIRA NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600009518
  • ReraGenie IDRG-MH-01449

Builder

  • NameSanklecha Construction Private Limited
  • Entity typeCompany
  • Managing DirectorVijay Kachardas Sanklecha
  • Other registrations11 more →
  • Completed9 of 12
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseSep 2018Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Mar 2021
  • Revised completionRevised to 30 Mar 2021 (originally 30 Sep 2018)
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Athens A3NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Athens A3: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered18
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,452 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Anwar Hussain ThimMumbai CityMumbai City

Approvals and building plan

Permissible FSI5183.88
Proposed, not sanctioned5,184 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURKAN ARCADE BHUJBAL FARM ROAD,PLOT NO ME-1 CIDCO INDIRA NAGAR NASHIK MAHARASHTRA

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG V Katale & Associates
PartnerRole in project
Sanklecha Construction Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600005606Sep 2018 → Sep 2020

Reason as filed by the promoterdelay in Govt. Permission like Environment & Corporation sanction, New Laws and Demonetization

Litigation declared4

CaseCourtStatus
31/2011Civil Judge Senior Division NashikPending on Exhibit hearing
144/2014Civil Judge Senior Division NashikPending on Exhibit hearing
744/2012Civil Judge Senior Division NashikPending on Exhibit hearing
229/2012Civil Judge Senior Division NashikPending on Exhibit hearing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC001000000010153Himangi Vikas BhatiaSanklecha Constructions Pvt Ltd12/09/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Feb 2022

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: 1 Status of Conveyance.pdf20 Sep 2022
Status of ConveyanceFile: 1 Status of Conveyance.pdf20 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: A3 F4.pdf1 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC TMZ.pdf21 Feb 2022
Declaration about Commencement CertificateFile: a3.pdf2 Aug 2021
Disclosure of sold/ booked inventoryFile: a3.pdf2 Aug 2021
Disclosure of sold/ booked inventoryFile: A3ID.pdf2 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: 1 CC_compressed.pdf31 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: A319.pdf31 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A320.pdf31 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A31920.pdf31 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A32021.pdf31 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: A31819.pdf28 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: A31819.pdf28 Jan 2020
Certificates of CA (Form 3)File: Form 3 CA A-3.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A3.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Athense A3- 1 to 3.pdf29 Jul 2017
Layout approvalFile: Metrozone layout-ilovepdf-compressed.pdf27 Jul 2017
Building plan approvalFile: Building A3.pdf27 Jul 2017
PAN CardFile: SCPL Pan Card.pdf27 Jul 2017
Copy of the legal title reportFile: SEARCH REPORT TMZ-ilovepdf-compressed (1).pdf27 Jul 2017
Details of encumbrancesFile: Encumbrances MZ.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Metrozone layout-ilovepdf-compressed.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building A3.pdf27 Jul 2017
Declaration in FORM BFile: TMZ SCPL athens a-3-ilovepdf-compressed(1).pdf27 Jul 2017
Proforma of Allotment letterFile: Agreement - Uploadable Metrozone - A3.pdf27 Jul 2017
Proforma of Allotment letterFile: Letter of Allotment.pdf27 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Mango WoodsNear Punydham Aashram Behind EKTA California NIBM Road Pisoli Pune78CompletedJul 2016Late, Dec 2016
The Comfort ZoneNear Ambad Talathi Office Ambad Nashik152CompletedSep 2014Late, May 2017
Garden CountyBegind Hotel Jatra Adgaon Nashik224CompletedApr 2013Late, Sep 2013

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 30 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Metrozone Athens A3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near INDIRA NAGAR4,100+ in Nashik

2 kmThe Metrozone Athens A3Completed 8Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: Sanklecha Construction Private Limited

Sanklecha Construction Private Limited has 12 registrations on MahaRERA, including Waterways and The Metrozone Athens A1. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if The Metrozone Athens A3 is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Metrozone Athens A3?

The registered promoter entity is Sanklecha Construction Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Metrozone Athens A3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Metrozone Athens A3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Metrozone Athens A3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Metrozone Athens A3?

The professionals named in the filing: Architect: G V Katale & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Metrozone Athens A3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Metrozone Athens A3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Metrozone Athens A3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.