The leaf Phase IV Building-04 Wing I,J

By SHREE PUSHKAR DEVELOPERS

RG-MH-22590 · RERA P52100031729 · Last updated on MahaRERA portal: 9 Feb 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 92%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

The leaf Phase IV Building-04 Wing I,J is a Residential / Group Housing project by SHREE PUSHKAR DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100031729 on 8 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameThe leaf Phase IV Building-04 Wing I,J
  • TypeResidential / Group Housing
  • Location
    • Yewalewadi
    • Pune
    • YAWALEWADI
    • Haveli
    • 411048
  • Pincode411048
  • RERA no.P52100031729
  • ReraGenie IDRG-MH-22590

Builder

  • NameSHREE PUSHKAR DEVELOPERS
  • Entity typePartnership
  • PartnersPRAMOD R AGARWAL, RAJEEV S TYAGI, NITIN B TYAGI, SANJAY S TYAGI, RADHESHYAM R AGARWAL, CHANDRAHSEKHAR U KOTHARI, MAHEDRA U KOTHARI
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2021First promiseDec 2023Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Nov 2021
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Leaf Phase IV Building-04 Wing I,JNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 92%.

The Leaf Phase IV Building-04 Wing I,J: 99% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes80%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered1
Open Space31

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,561 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9950.32
Proposed, not sanctioned9,799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNARIMAN POINT MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTELESIS ARCHITECTS & DESIGNERS PVT. LTD.
EngineerDNYANESHWAR AWHALE
Chartered AccountantBirla and Company
PartnerRole in project
SHREE PUSHKAR DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017396Dec 2023 → Dec 2024

Reason as filed by the promoterProposed Extended Date of Completion 31/12/2024

Litigation declared2

CaseCourtStatus
687/2018/2018Civil Judge Senior Division PunePending
4790/2020/2020Superintendent of Land RecordsPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Nov 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Wing IJ.pdf9 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate.pdf12 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM4 I J THE LEAF.pdf3 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Building Completion OCfrom PMC.pdf10 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SPD FY 2023 24.pdf10 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosare Of Sold The Leaf - I J_0001.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jul 2024
Other - LegalFile: LEGAL.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: I J RERA.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf11 Apr 2024
Status of ConveyanceFile: Declaration_SPD_IJ_.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 MARCH 24 ENGINEERS CERTIFICATE SPD.pdf8 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE FY 2023 24 SPD.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022 23 WING IJ.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2021 22 WING IJ.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2021 22 WING IJ.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 RERA 2023-24 FORM - 1 ARCH CERTIFICATE SPD LEAF I J BLDG.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 RERA 2023-24 FORM - 2 ENGG CERTIFICATE SPD LEAF IJ BLDG.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q3 RERA 2023-24 FORM - 2A QUALITY CERTIFICATE SPD LEAF IJ BLDG_compressed.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSARE OF SOLD-UNSOLD FOR RERA IJ_compressed (1).pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate BLDG - IJ 5124_compressed.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT LEAF IJ.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY CERT LEAF IJ.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: IJ.pdf7 Oct 2023
Layout approvalFile: 1-Sanction layout sheet High resolution_11zon.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: 1-Sanction layout sheet High resolution_11zon.pdf9 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate IJ.pdf9 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate IJ.pdf9 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: IJ CA CERTIFICATE.pdf9 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: IJ- PUSHKAR.pdf10 May 2023
Building plan approvalFile: Layout sanction 17 02 23.pdf21 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout sanction 17 02 23.pdf21 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 17 02 23 C.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Leaf IJ- Q4.pdf16 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEERS CERTIFICATE IJ BLDG SHREE PUSHKAR DEVELOPERS MARCH 2023.pdf16 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - QUALITY CERTIFICATE IJ BLDG SHREE PUSHKAR DEVELOPERS MARCH 2023.pdf16 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Spd - IJ -Form 5.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Wing IJ-The Leaf.pdf15 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A-Wing IJ-The Leaf.pdf15 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Wing IJ- The Leaf_11zon.pdf15 Jan 2023
Declaration in FORM BFile: Declaration in FORM B I J.pdf8 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: IJ SEPT 2022_11zon.pdf30 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE I J WING THE LEAF.pdf17 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (2).pdf17 Jun 2022
Details of encumbrancesFile: indenture of mortgage 14CR_WING IJ.pdf28 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE IJ BLDG THE LEAF form-4 dec-21.pdf8 Jan 2022
Copy of the legal title reportFile: Title in Format A_Flow of the Ttitle_Pages -1-14.pdf2 Nov 2021
Copy of the legal title reportFile: Title in Format A_Flow of the Ttitle_Pages -1-14.pdf2 Nov 2021
Copy of the legal title reportFile: Title in Format A_Flow of the Ttitle_Pages -15-28.pdf2 Nov 2021
Copy of the legal title reportFile: Title in Format A_Flow of the Ttitle_Pages -29-42.pdf2 Nov 2021
Copy of the legal title reportFile: Title report in Format A_Pages-1-18.pdf31 Oct 2021
Details of encumbrancesFile: encumbrance certificate.pdf30 Oct 2021
Layout approvalFile: 11 Layout.pdf23 Oct 2021
Building plan approvalFile: 8 Floor Plan 1.pdf23 Oct 2021
Building plan approvalFile: 9 Floor Plan 2.pdf23 Oct 2021
PAN CardFile: 5 PAN_Card.pdf23 Oct 2021
Copy of the legal title reportFile: 13 Title Opinion search Report-pages-1-31.pdf23 Oct 2021
Copy of the legal title reportFile: 13 Title Opinion search Report-pages-32-62.pdf23 Oct 2021
Details of encumbrancesFile: 14 Details of encumbrances -Bajaj Mortgage Deed_Index II_GH.pdf23 Oct 2021
Copy of Layout Approval (in case of layout)File: 11 Layout.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 8 Floor Plan 1.pdf23 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 9 Floor Plan 2.pdf23 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: 4 CC Order.pdf23 Oct 2021
Declaration about Commencement CertificateFile: 15 Declaration about Commencement Certificate.pdf23 Oct 2021
Declaration in FORM BFile: Form B.pdf23 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19 Architect Certificate.pdf23 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20 CA Certificate.pdf23 Oct 2021
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf23 Oct 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
The Leaf Building 2 Wing DEFS No. 35 Mouje Yewalewadi Katraj Kondhwa road Tal Haveli Dist Pune164CompletedDec 2017Late, Aug 2018
The Leaf Building 1 Wing ABCS No. 35 Mouje Yewalewadi Katraj Kondhwa road Tal Haveli Dist Pune144CompletedJun 2016Late, Dec 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The leaf Phase IV Building-04 Wing I,J on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: SHREE PUSHKAR DEVELOPERS

Shree Pushkar Developers has 3 registrations on MahaRERA, including The Leaf and The leaf Phase IV Building-04 Wing I,J. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The leaf Phase IV Building-04 Wing I,J is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The leaf Phase IV Building-04 Wing I,J?

The registered promoter entity is SHREE PUSHKAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The leaf Phase IV Building-04 Wing I,J?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The leaf Phase IV Building-04 Wing I,J?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The leaf Phase IV Building-04 Wing I,J?

The professionals named in the filing: Architect: TELESIS ARCHITECTS & DESIGNERS PVT. LTD.; Engineer: DNYANESHWAR AWHALE; Chartered Accountant: Birla and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The leaf Phase IV Building-04 Wing I,J?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The leaf Phase IV Building-04 Wing I,J. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The leaf Phase IV Building-04 Wing I,J to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.