ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / THE GREEN ORCHID PHASE III

Registered No litigation declared Residential / Group Housing project

THE GREEN ORCHID PHASE III

By SHAKTI DEVELOPERS

RG-MH-14479 · RERA P52000022859 · Last updated on MahaRERA portal: 22 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
20 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 78%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

THE GREEN ORCHID PHASE III is a Residential / Group Housing project by SHAKTI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000022859 on 30 Oct 2019. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameTHE GREEN ORCHID PHASE III
  • TypeResidential / Group Housing
  • Location
    • SHELU WEST
    • SHELU. KARJET
    • Bandhiwali
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • RERA no.P52000022859
  • ReraGenie IDRG-MH-14479

Builder

  • NameSHAKTI DEVELOPERS
  • Entity typePartnership
  • GSTIN27ACNFS4762Q1Z3
  • PartnersGANGJI BHACHU PATEL, RANCHHODBHAI LAXMAN GOTHI, GOPAL DHANJI DUBARIYA, KARSHAN BHIMA DUBARIYA
  • Other registrations8 more →
  • Completed4 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Oct 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WING BLOSSOMNA50000
B WING DAISYNA50000
C WING HIBISCUSNA50000
D WING JASMINENA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 78%.

A WING BLOSSOM81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
B WING DAISY81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
C WING HIBISCUS81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%
D WING JASMINE81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises78%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%

Progress on shared amenities15

As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed510

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots510
Open Space510
BuildingOpen SpaceTotal
A WING BLOSSOM170170
B WING DAISY170170
D WING JASMINE170170

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,712 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5712.0
Proposed, not sanctioned5,712 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHELU WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA
EngineerTHE DESIGN INDIA
Chartered AccountantMAYUR PREMJI PASAD
PartnerRole in project
SHAKTI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Encumbrance Letter -Legal.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 30-09-2024.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 31-12-2024 .pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 as on 300924.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 as on 311224.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 as on 300624.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 as on 310324.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - 30-09-2024.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - 31-12-2024.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Letter for sold unsold P III 31324.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Letter for sold unsold P III 311224.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Letter for sold unsold P III 30924.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Letter for sold unsold P III 30624.pdf22 Feb 2025
CERSAI detailsFile: Letter for CERSAI.pdf22 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Letter for Seprate Bank Ac declaration.pdf22 Feb 2025
Deviation Report with respect to Allotment letterFile: No Deviation for Allotment Letter.pdf22 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter -Legal.pdf22 Feb 2025
Deviation Report with respect to model copy of AgreementFile: No deviation report for Agreement.pdf22 Feb 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (1).pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in Other Project G B PATEL.pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in Other Project G D DUBARIYA.pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in Other Project K B DUBARIYA.pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in Other Project R B DUBARIYA.pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in Other Project R L GOTHI.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 P III FY 2023-24 SD.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - PHASE - III - 30-09-2023.pdf1 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - PHASE - III - 31-12-2023.pdf1 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - PHASE - III - 31-03-2024.pdf1 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - PHASE - III - 30-06-2024.pdf1 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - PHASE - III - 30-09-2023.pdf1 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - PHASE - III - 31-12-2023.pdf1 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - PHASE - III - 31-03-2024.pdf1 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - PHASE - III - 30-06-2024.pdf1 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: P3 1920.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: P3 2021.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: P3 2122.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: P3 2223.pdf14 Oct 2023
Layout approvalFile: sheet-1 -cc copy 13-5-22 II AND III.PDF26 Jun 2022
Building plan approvalFile: Building Plan Copy 13-5-22 III.PDF26 Jun 2022
Copy of Layout Approval (in case of layout)File: sheet-1 -cc copy 13-5-22 II AND III.PDF26 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Copy 13-5-22 III.PDF26 Jun 2022
Declaration about Commencement CertificateFile: cc revised rera 13-5-22.PDF26 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICAT PHASE-3.PDF26 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICAT PHASE-3.PDF26 Jun 2022
Proforma of Allotment letterFile: Draft Agreement for Sale.pdf26 Jun 2022
Proforma of Allotment letterFile: Draft Allotment Letter.pdf26 Jun 2022
OtherFile: RERA AREA PHASE-3.PDF26 Jun 2022
Copy of the legal title reportFile: 2 S R NO 139 TITAL AND SARCH.pdf13 Oct 2019
Copy of the legal title reportFile: 2 Legle Title Report (7, 12).pdf13 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 III Form_3_maha_rera_ca_certificate.pdf13 Oct 2019
Proforma of Allotment letterFile: 16 Draft Agreement for Sale.pdf13 Oct 2019
Proforma of Allotment letterFile: 16 Draft Allotment Letter.pdf13 Oct 2019
OtherFile: 18 PARTNER SHEEP DEED.pdf7 Oct 2019
Layout approvalFile: 4 PLAN LAYOUT .pdf5 Oct 2019
Building plan approvalFile: 5 ABCD WING BUILDING PLAN.pdf5 Oct 2019
PAN CardFile: 1 PAN CARD.PDF5 Oct 2019
Details of encumbrancesFile: 3 Encmbrance Letter.pdf5 Oct 2019
Copy of Layout Approval (in case of layout)File: 4 PLAN LAYOUT .pdf5 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: 5 ABCD WING BUILDING PLAN.pdf5 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: 6 C C COPY_.pdf5 Oct 2019
Declaration in FORM BFile: 7 Form B.pdf5 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 RERA ARCHITAC CERTIFICAT.pdf5 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 RERA ENGENER CERTIFICAT.pdf5 Oct 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUNSHINE RESIDENCYSurvey No 15 Gut No 3 Bhandiwali Shelu West21CompletedDec 2020Dec 2020

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE GREEN ORCHID PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHELU. KARJET5,900+ in Raigarh

Builder: SHAKTI DEVELOPERS

SHAKTI DEVELOPERS has 9 registrations on MahaRERA, including WESTERN PARK and CALISTA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if THE GREEN ORCHID PHASE III is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GREEN ORCHID PHASE III?

The registered promoter entity is SHAKTI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACNFS4762Q1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GREEN ORCHID PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE GREEN ORCHID PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GREEN ORCHID PHASE III?

The professionals named in the filing: Architect: THE DESIGN INDIA; Engineer: THE DESIGN INDIA; Chartered Accountant: MAYUR PREMJI PASAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GREEN ORCHID PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GREEN ORCHID PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GREEN ORCHID PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.