Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

THE GREEN ORCHID PHASE II is a Residential / Group Housing project by SHAKTI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000023554 on 19 Dec 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameTHE GREEN ORCHID PHASE II
  • TypeResidential / Group Housing
  • Location
    • SHELU
    • SHELU WEST
    • TALUKA -KARJET
    • Bandhiwali
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • RERA no.P52000023554
  • ReraGenie IDRG-MH-14478

Builder

  • NameSHAKTI DEVELOPERS
  • Entity typePartnership
  • GSTIN27ACNFS4762Q1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersGANGJI BHACHU PATEL, RANCHHODBHAI LAXMAN GOTHI, GOPAL DHANJI DUBARIYA, KARSHAN BHIMA DUBARIYA
  • Other registrations8 more →
  • Completed4 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

22 months past promisethis monthRegisteredDec 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Dec 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E WING LAVENDERNA50000
F WING LILLYNA50000
G WING LOTUSNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

E WING LAVENDER0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F WING LILLY0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G WING LOTUS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed510

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots510
Open Space510
BuildingOpen SpaceTotal
E WING LAVENDER170170
F WING LILLY170170
G WING LOTUS170170

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,307 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6307.0
Proposed, not sanctioned6,307 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHELU WEST, TALUKA KARJET, PIN 410201

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA
EngineerTHE DESIGN INDIA
Chartered AccountantMAYUR PREMJI PASAD
PartnerRole in project
SHAKTI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Dec 2024

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 PII FY 2023-24.pdf22 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FOM 4 PHASE 2.pdf14 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GREEN ORCHID PHASE 2_compressed.pdf10 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4 green orchid phase2_compressed.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GREEN ORCHID PHASE 2_compressed.pdf10 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: PROJECT COMPLETION - PHASE - II - 13-08-2024.pdf1 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PROJECT COMPLETION - PHASE - II - 13-08-2024.pdf1 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC COPY PHASE II.pdf1 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019-20.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf8 Jan 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 0 Architect Certificate 31-03-2022 Phase -II.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate 30-06-2022 Phase -II_compressed.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Certificate 30-09-2022 Phase -II.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate 31-12-2022 Phase -II.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate 31-03-2023 Phase -II.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect Certificate 30-06-2023 Phase -II.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect Certificate 30-09-2023 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 0 Engineer Certificate 31-03-2022 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate 30-06-2022 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate 30-09-2022 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate 31-12-2022 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer Certificate 31-03-2023 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Certificate 30-06-2023 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer Certificate 30-09-2023 Phase -II.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate 30-06-2022 Phase -II_compressed.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf17 Oct 2023
Details of encumbrances concerned to FinanceFile: Encrumbrance letter fiannce.pdf16 Oct 2023
Details of encumbrances concerned to LegalFile: Encrumbrance letter fiannce.pdf16 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: cc revised rera 13-5-22.PDF16 Oct 2023
CERSAI detailsFile: CERSAI.pdf16 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in other in other project.pdf16 Oct 2023
Proforma of Agreement for saleFile: Draft Agreement for Sale.pdf16 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Letter of separate bank ac detail.pdf16 Oct 2023
Deviation Report with respect to Allotment letterFile: No deviation report for allotment letter.pdf16 Oct 2023
Deviation Report with respect to model copy of AgreementFile: No deviation report for Agreement for sale.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: P2 1920.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: P2 2021.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: P2 2021.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: P2 2122.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: P2 2223.pdf14 Oct 2023
Layout approvalFile: sheet-1 -cc copy 13-5-22 II AND III.PDF26 Jun 2022
Building plan approvalFile: sheet-3 -cc copy 13-5-22 II.PDF26 Jun 2022
Building plan approvalFile: sheet-4 -cc copy 13-5-22 II.PDF26 Jun 2022
Building plan approvalFile: sheet-5 -cc copy 13-5-22 II.PDF26 Jun 2022
Copy of Layout Approval (in case of layout)File: sheet-1 -cc copy 13-5-22 II AND III.PDF26 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sheet-3 -cc copy 13-5-22 II.PDF26 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sheet-4 -cc copy 13-5-22 II.PDF26 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sheet-5 -cc copy 13-5-22 II.PDF26 Jun 2022
Declaration about Commencement CertificateFile: cc revised rera 13-5-22.PDF26 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICAT PHASE-2.PDF26 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICAT PHASE-2.PDF26 Jun 2022
Proforma of Allotment letterFile: Draft Agreement for Sale.pdf26 Jun 2022
Proforma of Allotment letterFile: Draft Allotment Letter.pdf26 Jun 2022
OtherFile: RERA AREA PHASE-2.PDF26 Jun 2022
Copy of the legal title reportFile: 2 S R NO 139 TITAL AND SARCH.pdf13 Oct 2019
Copy of the legal title reportFile: 2 Legle Title Report (7, 12).pdf13 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 II Form_3_maha_rera_ca_certificate.pdf13 Oct 2019
Proforma of Allotment letterFile: 16 Draft Agreement for Sale.pdf13 Oct 2019
Proforma of Allotment letterFile: 16 Draft Allotment Letter.pdf13 Oct 2019
OtherFile: Unit Wise Carpet Area _2.pdf7 Oct 2019
Layout approvalFile: 4 PLAN LAYOUT .pdf5 Oct 2019
Building plan approvalFile: 5 E WING BUILDING PLAN.pdf5 Oct 2019
Building plan approvalFile: 5 F WING BUILDING PLAN.pdf5 Oct 2019
Building plan approvalFile: 5 G WING BUILDING PLAN.pdf5 Oct 2019
PAN CardFile: 1 PAN CARD.PDF5 Oct 2019
Details of encumbrancesFile: 3 Encmbrance Letter.pdf5 Oct 2019
Copy of Layout Approval (in case of layout)File: 4 PLAN LAYOUT .pdf5 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: 5 E WING BUILDING PLAN.pdf5 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: 5 F WING BUILDING PLAN.pdf5 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: 5 G WING BUILDING PLAN.pdf5 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: 6 C C COPY_.pdf5 Oct 2019
Declaration in FORM BFile: 7 Form B.pdf5 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 RERA ARCHITAC CERTIFICAT.pdf5 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 RERA ENGENER CERTIFICAT.pdf5 Oct 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUNSHINE RESIDENCYSurvey No 15 Gut No 3 Bhandiwali Shelu West21CompletedDec 2020Dec 2020

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE GREEN ORCHID PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHELU WEST, TALUKA -KARJET,5,900+ in Raigarh

Builder: SHAKTI DEVELOPERS

SHAKTI DEVELOPERS has 9 registrations on MahaRERA, including WESTERN PARK and CALISTA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that THE GREEN ORCHID PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if THE GREEN ORCHID PHASE II is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GREEN ORCHID PHASE II?

The registered promoter entity is SHAKTI DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACNFS4762Q1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GREEN ORCHID PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE GREEN ORCHID PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GREEN ORCHID PHASE II?

The professionals named in the filing: Architect: THE DESIGN INDIA; Engineer: THE DESIGN INDIA; Chartered Accountant: MAYUR PREMJI PASAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GREEN ORCHID PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GREEN ORCHID PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GREEN ORCHID PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.