Home / Browse projects / Mumbai Suburban, Maharashtra / THE ELITE
THE ELITE
By R R D HEIGHTS AND BUILDERS PVT LTD
RG-MH-67156 · RERA P51800005901 · Last updated on MahaRERA portal: 4 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 14 complaints at MahaRERA
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE ELITE is a Residential / Group Housing project by R R D HEIGHTS AND BUILDERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005901 on 14 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 202 of the 215 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete. 14 complaints are on record with the regulator.
At a glance
Project
- NameTHE ELITE
- TypeResidential / Group Housing
- Location
- P K ROAD
- MULUND WEST
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005901
- ReraGenie IDRG-MH-67156
Builder
- NameR R D HEIGHTS AND BUILDERS PVT LTD
- Entity typeCompany
- Managing DirectorsPIYUSH HARISH GOSAR, DEEPAK MULCHAND GOSAR, PRANAY RAVINDRA PHATAK
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed347 files
Current status
Figures as on 4 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| THE ELITE - A WING | NA | 49 | 41 | 107 | 2 | 109 |
| THE ELITE - B WING | NA | 49 | 41 | 106 | 0 | 106 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.
THE ELITE - A WING56%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 65% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 88% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
THE ELITE - B WING56%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 65% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 88% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed223
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| THE ELITE - A WING | 111 | 111 |
| THE ELITE - B WING | 112 | 112 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| THE ELITE - A WING | NA | Rs 74.33 cr | Rs 68.90 cr |
| THE ELITE - B WING | NA | Rs 74.33 cr | Rs 68.90 cr |
| - | NA | Rs 53.90 cr | Rs 3.34 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dot Architect |
| Architect | Amol Jaybhaye |
| Engineer | Advance Creative Design Consultancy |
| Engineer | Pravin Gage |
| Chartered Accountant | Himmat Shethia & Associates |
| Chartered Accountant | Malay Furia & Co. |
| Partner | Role in project |
|---|---|
| R R D HEIGHTS AND BUILDERS PVT LTD | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRCC slab work up-to 42 Floors out of 45 Floors is completed in full and for 43rd, 44th and 45th Floor, part slab work of the building is completed and finishing internal work is in progress of the project, as is evidenced by the latest Form 1 that is Architect Certificate dated 2nd January 2024 submitted for the period of 31st December, 2023. In the light of the same we seek extension of one year for due date of completion of the project up-to 29-Dec-2024. Self Declaration dated 12th January 2024 for extension of due date for the project is attached. Duly notarized Affidavit cum declaration on
Reason as filed by the promoterRCC Work of the slab work is at the stage of completion as evidenced by latest Architect Certificate of 95% completion of slab super structure, Finishing work inside the flats is in progress. Ground + 2 Podiums + amenity floor part work is completed. Further we have duly attached the duly attached consent in Annexure counter signed and stamped by the promoter. Detailed declaration explaining the reasons for which the project got delayed and timeline of the balance work completion within extended period is attached along-with this application. We have uploaded more than 51% allottees consent du
Reason as filed by the promoterRCC Work of the slab work is at the stage of completion, finishing work inside the flats is in progress. Ground + Part Podium work + Amenity floor part work is completed. We have uploaded more than 51% allottees consent in Format B duly counter signed and stamped by promoter on each page. We have complied quarterly compliances of Form 1, Form 2 & Form 3 and notarised affidavit in Form B mentioning the extension date and sold inventory disclosure up-to latest quarter ended 31-12-2025 is attached. In light of completion of the pending work we seek extension up-till 31-Dec-2026.
Complaints filed with MahaRERA14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000079098 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 28/05/2019 |
| CC006000000100604 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100606 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100607 | RAJ GIRISH KARIA | RRD HEIGHTSAND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100608 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100609 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100610 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100612 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100613 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100614 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100615 | RAJ KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000100616 | RAJ GIRISH KARIA | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 20/08/2019 |
| CC006000000192903 | SIDDHARTH SHAH | RRD HEIGHTS AND BUILDERS PRIVATE LIMITED | 05/03/2020 |
| CC006000000210039 | Suryakant B. Shah | RRD Heights & Builders Pvt. lTD. | 15/02/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed347
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 347 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_31-03-2026_The Elite.pdf | 4 Aug 2026 |
| Withdrawal Update Form 1File: Form 1_30-06-26.pdf | 4 Aug 2026 |
| Withdrawal Update Form 2File: Scan Form 2_31-03-26_compressed.pdf | 4 Aug 2026 |
| Withdrawal Update Form 2File: Scan Form 2_30-06-26_compressed.pdf | 4 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 _31-03-26_The Elite_compressed.pdf | 4 Aug 2026 |
| Withdrawal Update Form 3File: Form 3_30-06-26_The Elite_compressed.pdf | 4 Aug 2026 |
| Withdrawal Update Form 1File: Form 1_The Elite.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Scan_The Elite_Form 2_31-12-2025.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Scan_The Elite_Form 3 - CA Certificate_31-12-2025_compressed.pdf | 2 Mar 2026 |
| Form 1File: Form 1_The Elite.pdf | 28 Feb 2026 |
| Form 2File: Scan_Form 2_The Elite_31-03-2025.pdf | 28 Feb 2026 |
| Form 3File: Scan_Elite_Form 3 - CA Certificate_31-03-2025_compressed.pdf | 28 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 31-03-2025_compressed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_The Elite.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_The Elite.pdf | 28 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_compressed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 2File: Elite_Form 2_30-09-2025.pdf | 28 Feb 2026 |
| Withdrawal Update Form 3File: Scan_Elite_Form 3 - CA Certificate_30-06-2025_compressed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 3File: Elite_Form 3 - CA Certificate_30-09-2025_compressed.pdf | 28 Feb 2026 |
| Form 5 (FY 2024-2025)File: Scan_Form 5 - RRD_The Elite FY 2024-2025.pdf | 28 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5_The Elite_FY 2023-2024.pdf | 28 Feb 2026 |
| Form 5 (FY 2022-2023)File: Scan_Form 5 - RRD FY 2022-2023.PDF | 28 Feb 2026 |
| Form 5 (FY 2021-2022)File: Scan_RRD Form 5_FY_2021-2022.PDF | 28 Feb 2026 |
| Form 5 (FY 2020-2021)File: Form No 5 RRD Heights 20-21.pdf | 28 Feb 2026 |
| Form 5 (FY 2019-2020)File: Form No 5 RRD Heights 19-20.pdf | 28 Feb 2026 |
| Form 5 (FY 2018-2019)File: Form - 5_Elite_2018-2019.pdf | 28 Feb 2026 |
| Form 1File: Final Form 1 - sep17.pdf | 25 Feb 2026 |
| Form 2File: Final Form 2 - sep17.pdf | 25 Feb 2026 |
| Form 3File: Form 3 RRd sep17.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Final Form - 1 Dec-17.pdf | 25 Feb 2026 |
| Form 2File: Final Form - 2 Dec-17.pdf | 25 Feb 2026 |
| Form 3File: Final Form - 3 Dec-17.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: 1 31-03-2018 RRD Form 1.pdf | 25 Feb 2026 |
| Form 2File: Form 2 31032018.pdf | 25 Feb 2026 |
| Form 3File: Form 3 RRD Mar18.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: 2 30-06-2018 RRD Form 1.pdf | 25 Feb 2026 |
| Form 2File: Form 2 30-06-2018.pdf | 25 Feb 2026 |
| Form 3File: Scanned Form 3 RRD 30-06-2018_compressed.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: 3 30-09-2018 RRD Form 1.pdf | 25 Feb 2026 |
| Form 2File: Form 2 30-09-2018.pdf | 25 Feb 2026 |
| Form 3File: Scanned RRD Form 3 30-09-2018_compressed.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1_ 31-12-2018.pdf | 25 Feb 2026 |
| Form 2File: Form 2 31-12-2018.pdf | 25 Feb 2026 |
| Form 3File: Scan Form 3 31-12-2018_compressed.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1 31-03-2019.pdf | 25 Feb 2026 |
| Form 2File: Form 2 31-03-2019.pdf | 25 Feb 2026 |
| Form 3File: Form 3 31-03-2019.pdf | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1 30-06-2019.pdf | 25 Feb 2026 |
| Form 2File: Form 2 30-06-2019.pdf | 25 Feb 2026 |
| Form 3File: Form 3 30-06-2019.PDF | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1 30-09-2019.pdf | 25 Feb 2026 |
| Form 2File: Form 2 30-09-2019.pdf | 25 Feb 2026 |
| Form 3File: Form 3 30-09-2019.PDF | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1_31-12-2019.pdf | 25 Feb 2026 |
| Form 2File: Form 2 31-12-2019.pdf | 25 Feb 2026 |
| Form 3File: Form 3 31-12-2019.PDF | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1_31-03-2020.pdf | 25 Feb 2026 |
| Form 2File: Form 2 31-03-2020.pdf | 25 Feb 2026 |
| Form 3File: Form 3_31-03-2020.PDF | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1_30-06-2020.pdf | 25 Feb 2026 |
| Form 2File: Form 2 30-06-2020.pdf | 25 Feb 2026 |
| Form 3File: Scan Form 3_30-06-2020.PDF | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1_30-09-2020.pdf | 25 Feb 2026 |
| Form 2File: Form 2 30-09-2020.pdf | 25 Feb 2026 |
| Form 3File: Scan Form 3 30-09-2020.PDF | 25 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_RRD Elite Disclosure 30-06-2022_compressed.pdf | 25 Feb 2026 |
| Form 1File: Scan Form 1_31-12-2020.pdf | 25 Feb 2026 |
| Form 2File: Form 2 31-12-2020.pdf | 25 Feb 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 347 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE ELITE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MULUND WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 331 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: R R D HEIGHTS AND BUILDERS PVT LTD
R R D HEIGHTS AND BUILDERS PVT LTD has 1 registration on MahaRERA, including THE ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if THE ELITE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE ELITE?
The registered promoter entity is R R D HEIGHTS AND BUILDERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE ELITE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE ELITE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for THE ELITE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE ELITE?
The professionals named in the filing: Architect: Dot Architect; Architect: Amol Jaybhaye; Engineer: Advance Creative Design Consultancy; Engineer: Pravin Gage; Chartered Accountant: Himmat Shethia & Associates; Chartered Accountant: Malay Furia & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE ELITE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback