ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / THE ELEMENTS

Registered No litigation declared Plotted project

THE ELEMENTS

By RUDROM 2 INFRA LLP

RG-MH-37628 · RERA P52900081071 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
25 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

THE ELEMENTS is a Plotted project by RUDROM 2 INFRA LLP in Sindhudurg, Maharashtra, registered with MahaRERA as P52900081071 on 15 Dec 2025. Possession is promised by 31 Mar 2028. 0 of the 25 units on this registration are recorded sold or booked.

At a glance

Project

  • NameTHE ELEMENTS
  • TypePlotted
  • Location
    • NEAR RAILWAY STATION
    • KUMBHARLI
    • MALGAON
    • Kumbharli
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • RERA no.P52900081071
  • ReraGenie IDRG-MH-37628

Builder

  • NameRUDROM 2 INFRA LLP
  • Entity typePartnership
  • PartnerKAPIL KUMAR CHANDER BHAN

Key dates

this monthRegisteredDec 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2025
  • Promised completion31 Mar 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed74 files

Current status

0%0 of 25 units booked

Figures as on 28 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area14,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2026
LandownerVillageDistrict
Jagannath Ramchandra RaulKumbharliSindhudurg
Sujata Jagannath RaulMulundMumbai Suburban

Approvals and building plan

Sanctioning authoritySub-Divisional Officer (Revenue), Sawantwadi, Sindhudurg
Permissible FSI10683.0
Proposed, not sanctioned10,683 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSCO - 7, SECTOR 31-32 A, MAIN MARKET GURGAON GURGAON HARYANA 122001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH MAHADEV WALKE
ArchitectAkshay Rajesh Tawade
EngineerER AKSHAY R TAWADE
Chartered AccountantCA Sagar Gajanan Teli
PartnerRole in project
RUDROM 2 INFRA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Certificate Rudrom March 2026.pdf28 May 2026
Form 2File: Form 2 Engineer Certificate Rudrom March 2026.pdf28 May 2026
Form 3File: Form 3 CA Certificate Rudrom March 2026.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Rudrom Mar 26.pdf28 May 2026
Form 1File: Form 1 Architect Certificate Application.pdf28 May 2026
Form 2File: Form 2 Engineer Certificate Application.pdf28 May 2026
Form 3File: Form 3 CA Certificate with Clarification.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Rudrom Dec 25.pdf28 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate with Clarification.pdf9 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate with Clarification.pdf9 Dec 2025
Copy of the legal title reportFile: Title Report.pdf1 Dec 2025
Other - LegalFile: Leave and Licence with Declaration.pdf1 Dec 2025
Other - LegalFile: Feasibility Clarification Rudrom 2 infra LLP-29-11-2025.pdf1 Dec 2025
Copy of the legal title reportFile: Title Report.pdf1 Dec 2025
Other - LegalFile: Leave and Licence with Declaration.pdf1 Dec 2025
Other - LegalFile: Feasibility Clarification Rudrom 2 infra LLP-29-11-2025.pdf1 Dec 2025
Layout approvalFile: 09 TP Permission and Plan.pdf26 Oct 2025
Layout approvalFile: 09 TP Permission and Plan.pdf26 Oct 2025
Copy of Layout Approval (in case of layout)File: 09 TP Permission and Plan.pdf26 Oct 2025
Other - LegalFile: 10 CC Confirmation Mail.pdf26 Oct 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 06 Format A Designated Bank Rudrom.pdf26 Oct 2025
Other - FinanceFile: Landowner Declaration for Bank Account.pdf26 Oct 2025
Proforma of Agreement for saleFile: 03 04 Final Agreement For Sale.pdf26 Oct 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 02 Disclosure of Interest Annexure A.pdf26 Oct 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 07 Format B Bank Declaration.pdf26 Oct 2025
Copy of Layout Approval (in case of layout)File: 09 TP Permission and Plan.pdf26 Oct 2025
Other - LegalFile: 10 CC Confirmation Mail.pdf26 Oct 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 06 Format A Designated Bank Rudrom.pdf26 Oct 2025
Other - FinanceFile: Landowner Declaration for Bank Account.pdf26 Oct 2025
Proforma of Agreement for saleFile: 03 04 Final Agreement For Sale.pdf26 Oct 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 02 Disclosure of Interest Annexure A.pdf26 Oct 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 07 Format B Bank Declaration.pdf26 Oct 2025
Declaration in FORM BFile: FORM B - PROMOTER 1.pdf27 Apr 2025
Declaration in FORM BFile: FORM B - PROMOTER 2.pdf27 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf27 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: NIL ENCUMBRANCE OF SECURED OR UNSECURED TO FINANCE.pdf27 Apr 2025
Declaration in FORM BFile: FORM B - PROMOTER 1.pdf27 Apr 2025
Declaration in FORM BFile: FORM B - PROMOTER 2.pdf27 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf27 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: NIL ENCUMBRANCE OF SECURED OR UNSECURED TO FINANCE.pdf27 Apr 2025
Building plan approval or NA orderFile: N A ORDER_1.pdf25 Apr 2025
Building plan approval or NA orderFile: N A ORDER_1.pdf25 Apr 2025
PAN CardFile: RUDROM 2 LLP PAN.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf25 Apr 2025
Proforma of Allotment letterFile: ALLOTTMENT FORMAT AS PER ORDER NO 60 OF RERA.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf25 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: N A ORDER_1.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: N A ORDER_1.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND BOOKED INVENTORIES.pdf25 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION REGARDING COMMENCEMENT CERTIFICATE.pdf25 Apr 2025
CERSAI detailsFile: cersai report.pdf25 Apr 2025
CERSAI detailsFile: No CERSAI.pdf25 Apr 2025
Deviation Report with respect to Allotment letterFile: NO DEVIATION WITH RESPECT TO ALLOTTMENT LETTER.pdf25 Apr 2025
Details of encumbrances concerned to LegalFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE.pdf25 Apr 2025
Details of encumbrances concerned to LegalFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf25 Apr 2025
Other - TechnicalFile: ANNEXURE to ORDER 50.pdf25 Apr 2025
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION WITH RESPECT TO AGREEMENT FOR SALE.pdf25 Apr 2025
PAN CardFile: RUDROM 2 LLP PAN.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE.pdf25 Apr 2025
Details of encumbrances concerned to FinanceFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf25 Apr 2025
Proforma of Allotment letterFile: ALLOTTMENT FORMAT AS PER ORDER NO 60 OF RERA.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf25 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: N A ORDER_1.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: N A ORDER_1.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND BOOKED INVENTORIES.pdf25 Apr 2025
Declaration about Commencement CertificateFile: DECLARATION REGARDING COMMENCEMENT CERTIFICATE.pdf25 Apr 2025
CERSAI detailsFile: cersai report.pdf25 Apr 2025
CERSAI detailsFile: No CERSAI.pdf25 Apr 2025
Deviation Report with respect to Allotment letterFile: NO DEVIATION WITH RESPECT TO ALLOTTMENT LETTER.pdf25 Apr 2025
Details of encumbrances concerned to LegalFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE.pdf25 Apr 2025
Details of encumbrances concerned to LegalFile: NIL ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf25 Apr 2025
Other - TechnicalFile: ANNEXURE to ORDER 50.pdf25 Apr 2025
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION WITH RESPECT TO AGREEMENT FOR SALE.pdf25 Apr 2025

How this compares with Sindhudurg

0%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep THE ELEMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KUMBHARLI , MALGAON530+ in Sindhudurg

Builder: RUDROM 2 INFRA LLP

RUDROM 2 INFRA LLP has 1 registration on MahaRERA, including THE ELEMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if THE ELEMENTS is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ELEMENTS?

The registered promoter entity is RUDROM 2 INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ELEMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE ELEMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ELEMENTS?

The professionals named in the filing: Architect: ARCH MAHADEV WALKE; Architect: Akshay Rajesh Tawade; Engineer: ER AKSHAY R TAWADE; Chartered Accountant: CA Sagar Gajanan Teli. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ELEMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ELEMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ELEMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.