Red flags
- Completion date moved by 140 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE DESTINATION is a Others project by DOVE DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000013360 on 26 Sep 2017. Possession is promised by 31 Mar 2035. The completion date has moved by 140 months from the original filing. 1 of the 41 units on this registration are recorded sold or booked, and 57 of 484 construction stages are filed complete.
At a glance
Project
- NameTHE DESTINATION
- TypeOthers
- Location
- Neral Kalamb Road
- Poshir
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000013360
- ReraGenie IDRG-MH-24104
Builder
- NameDOVE DEVELOPERS
- Entity typeCompany
- CINU45200DL2008PTC174942
- Managing DirectorsVIVEK KAPUR, MANISH KAPOOR, TARUN MALHOTRA, SANJAY RAMESH GOYAL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Sep 2017
- Promised completion31 Mar 2035
- Revised completionRevised to 31 Mar 2035 (originally 31 Jul 2023)
- Buildings44 building records
- Documents filed147 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Survey no-200 Plot no-13 | NA | 2 | 2 | 0 | 0 | 0 |
| Survey no-201 Plot no-5 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 15 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 16 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 18 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 19 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 20 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 25 | NA | 2 | 2 | 0 | 0 | 0 |
| SURVEY NO 200 PLOT NO 26 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 27 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 28 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 29 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 30 | NA | 3 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 31 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 35 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 36 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 37 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 38 | NA | 3 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 39 | NA | 2 | 2 | 0 | 0 | 0 |
| SURVEY NO 200 PLOT NO 40 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 41 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 43 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 44 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 45 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 6 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 7 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 8 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NIO 201 PLOT NO 9 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 12 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 13 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 14 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 15 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 16 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 17 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 24 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 25 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 26 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 28 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 29 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 30 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 31 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 32 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 33 | NA | 2 | 2 | 1 | 0 | 1 |
| SURVEY NO 201 PLOT NO 34 | NA | 2 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 44 buildings; the table lists the first 20.
57 of 484 construction stages are filed complete across 44 buildings. The stage furthest along is Excavation, at 0%.
Survey no-200 Plot no-139%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Survey no-201 Plot no-573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 159%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 169%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 189%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 199%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 209%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 259%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 269%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 279%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 289%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 299%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 309%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 319%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 359%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 369%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 379%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 389%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 399%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SURVEY NO 200 PLOT NO 409%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed15
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SURVEY NO 200 PLOT NO 29 | 0 | 1 | 1 |
| SURVEY NO 200 PLOT NO 30 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 36 | 0 | 1 | 1 |
| SURVEY NO 200 PLOT NO 38 | 1 | 0 | 1 |
| SURVEY NO 200 PLOT NO 41 | 0 | 1 | 1 |
| SURVEY NO 200 PLOT NO 43 | 0 | 1 | 1 |
| SURVEY NO 200 PLOT NO 45 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 8 | 0 | 1 | 1 |
| SURVEY NIO 201 PLOT NO 9 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 13 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 14 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 15 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 16 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 17 | 0 | 1 | 1 |
| SURVEY NO 201 PLOT NO 26 | 0 | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Survey no-200 Plot no-13 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 15 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 16 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 18 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 19 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 20 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 25 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 26 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 27 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 28 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 29 | NA | Rs 12.50 cr | - |
| SURVEY NO 200 PLOT NO 30 | NA | Rs 12.50 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abhijit Mohite |
| Engineer | DURGE CONSULTANTS |
| Chartered Accountant | RSL & Co |
| Chartered Accountant | R H Pothiwal & Associates |
| Partner | Role in project |
|---|---|
| DOVE DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs you are aware, this is a plotted development project where plots are sold individually, and construction begins only after a plot is sold. Our vision is to give a personal touch to our construction; hence, each structure is customized to buyer's needs. We have successfully sold one plot so far and completed construction on it. The structure has been handed over to the buyer as per schedule. However, since the remaining plots are yet to be sold, we are currently unable to carry out construction work on them, which has slowed down the overall progress of the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2035
Documents filed147
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Mar 2026.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Form 2_Mar 2026.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 2026.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate_Dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Dec 25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate_Dec 2025_Dove Developers.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate_Dec 25.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Dec 25.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate_Dec 2025_Dove Developers.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificte Sep 25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Sep 25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate_Sep 25.pdf | 12 Dec 2025 |
| Form 5 (FY 2024-2025)File: RERA Audit Report_2024-25.pdf | 24 Oct 2025 |
| Withdrawal Update Form 1File: Form 1_Jun 25.pdf | 2 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_Jun 25.pdf | 2 Sep 2025 |
| Withdrawal Update Form 3File: CA Certificate_Jun 2025.pdf | 2 Sep 2025 |
| Form 3File: Dec June 2021.pdf | 14 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: Dec June 2021.pdf | 14 Aug 2025 |
| Form 1File: Form 1 June 22.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Engineer.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf | 14 Aug 2025 |
| Certificates of CA (Form 3)File: Form-3 (31-03-2021) Dove Developers Signed.pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form-3 (31-03-2022) Dove Developers Signed.pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form-3 (31-03-2023) Dove Developers Signed.pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form-3 (31-03-2024) Dove Developers Signed.pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 (30-06-2024).pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 (30-09-2024) (without blanks).pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form-3 (Final - without blanks).pdf | 27 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 (Final) - Dove Developers.pdf | 27 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2021.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2021.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2025.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2024.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2024.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2024.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2023.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2023.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2023.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2023.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2022.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2022.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2022.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2022.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2021.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2025.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 21.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jun 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 23.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 23.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jun 23.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 23.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 22.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 22.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jun 22.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 22.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 21.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aug 21_1_11zon.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold_page-0001.pdf | 8 May 2025 |
| Other - TechnicalFile: pert chart_organized.pdf | 8 May 2025 |
| Declaration in FORM BFile: FROM B DOVE DEVELOPER.pdf | 6 May 2025 |
| Other - TechnicalFile: annexure a_compressed.pdf | 6 May 2025 |
| Certificates of CA (Form 3)File: Declaration June 21.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Dec 21.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Mar 22.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration June 22.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Sep 22.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Dec 22.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Mar 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Jun 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Sep 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Dec 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Mar 24.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Jun 24.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Sep 24.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Dec 24.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Declaration Mar 25.pdf | 26 Apr 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 147 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE DESTINATION on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Poshir5,900+ in Raigarh
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: DOVE DEVELOPERS
DOVE DEVELOPERS has 1 registration on MahaRERA, including THE DESTINATION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if THE DESTINATION is delayed beyond 31 Mar 2035?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE DESTINATION?
The registered promoter entity is DOVE DEVELOPERS, a company as per the filing. Its CIN U45200DL2008PTC174942 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE DESTINATION?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE DESTINATION?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE DESTINATION?
The professionals named in the filing: Architect: Abhijit Mohite; Engineer: DURGE CONSULTANTS; Chartered Accountant: RSL & Co; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE DESTINATION?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback