Registered Litigation declared Residential / Group Housing project

THE CROWN

By BEAMS AND SHINE REALTIES PRIVATE LIMITED

RG-MH-93124 · RERA P52100054379 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 22%
27 of 57Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

THE CROWN is a Residential / Group Housing project by BEAMS AND SHINE REALTIES PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100054379 on 18 Jan 2024. Possession is promised by 30 Jun 2028. 30 of the 57 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE CROWN
  • TypeResidential / Group Housing
  • Location
    • Gultekadi
    • Haveli
    • Pune
    • 411037
  • Pincode411037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054379
  • ReraGenie IDRG-MH-93124

Builder

  • NameBEAMS AND SHINE REALTIES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorAmit Anil Lalwani

Key dates

this monthRegisteredJan 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jan 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

53%30 of 57 units booked
37.4%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA251657057

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 22%.

Building A: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure22%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered180

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Dec 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation, Pune
Permissible FSI11417.68
Proposed, not sanctioned11,380 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSujog Navkar, Showroom No 3, Plot No 394, 395A, 7 Love Chowk, Gultekadi, Shankar Seth Road Pune -37
Estimated costRs 91.60 cr
Cost incurredRs 34.24 cr
Work done37.38%
BuildingWingEstimatedIncurred
Building ANARs 86.20 crRs 34.24 cr
-NARs 5.40 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Jay Aeram
EngineerMr Nand Kumar Patil
EngineerARUN SUTAR
Chartered AccountantSunanda Zore
Chartered AccountantSANKET BHANDARI
Chartered AccountantVinod Kumar Jindal
PartnerRole in project
BEAMS AND SHINE REALTIES PRIVATE LIMITED-

Litigation declared4

CaseCourtStatus
1279/1998Honble CJSD Pune at PunePending before Honble Court
Civil MA 762/2024/2024Hon.ble Civil Judge Senior Division Pune At PuneOngoing
2788/2025Hon.ble District and Session Court Pune at PuneOngoing
1234/2025Hon.ble Civil Civil Court Senior Division Pune at PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-01.pdf25 Apr 2026
Withdrawal Update Form 1File: Form-01.pdf25 Apr 2026
Withdrawal Update Form 2File: Form-02.pdf25 Apr 2026
Withdrawal Update Form 2File: Form-02.pdf25 Apr 2026
Withdrawal Update Form 3File: Beams.pdf25 Apr 2026
Withdrawal Update Form 3File: Form-3_compressed.pdf25 Apr 2026
Layout approvalFile: LAYOUT WITH HATCHING.pdf29 Dec 2025
Form 1File: Form 1.pdf29 Dec 2025
Form 2File: Form 2.pdf29 Dec 2025
Form 3File: Form 3 30 03 25.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31 03 25.pdf29 Dec 2025
Form 1File: FORM 01.pdf29 Dec 2025
Form 2File: FORM 02.pdf29 Dec 2025
Form 3File: Form 3 30 03 24.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31 03 24.pdf29 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A FY23-24.pdf29 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A FY24-25.pdf29 Dec 2025
Form 5 (FY 2023-2024)File: RERA FORM 5 Beams and Shine Realties PVT.LTD..pdf29 Dec 2025
Form 1File: FORM 01.pdf27 Dec 2025
Form 2File: FORM 02.pdf27 Dec 2025
Form 3File: Form 3 30 06 24.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30 6 24.pdf27 Dec 2025
Form 1File: FORM 01.pdf27 Dec 2025
Form 2File: FORM 02.pdf27 Dec 2025
Form 3File: Form 3 30 09 24.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30 9 24.pdf27 Dec 2025
Form 1File: FORM 01.pdf27 Dec 2025
Form 2File: FORM 02.pdf27 Dec 2025
Form 3File: Form 3 31 12 24.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 31 12 24.pdf27 Dec 2025
Layout approvalFile: LAYOUT-HATCHING.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Beams & Shine FORM 5.pdf10 Dec 2025
Layout approvalFile: scan 1-6 (1).pdf9 Dec 2025
Building plan approvalFile: scan 2-6 (1).pdf9 Dec 2025
Building plan approvalFile: scan 3-6 (1).pdf9 Dec 2025
Building plan approvalFile: scan 4-6 (1).pdf9 Dec 2025
Building plan approvalFile: scan 5-6 (1).pdf9 Dec 2025
Building plan approvalFile: scan 6-6 (1).pdf9 Dec 2025
Withdrawal Update Form 1File: Form-01.pdf8 Dec 2025
Withdrawal Update Form 1File: Form-01.pdf8 Dec 2025
Withdrawal Update Form 2File: Form-02.pdf8 Dec 2025
Withdrawal Update Form 2File: Form-02.pdf8 Dec 2025
Withdrawal Update Form 3File: Beam FORM 3 Q2_compressed.pdf8 Dec 2025
Withdrawal Update Form 3File: Beam FORM 3 Q2_compressed.pdf8 Dec 2025
Withdrawal Update Form 1File: Form-01.pdf29 Nov 2025
Withdrawal Update Form 2File: Form-02.pdf29 Nov 2025
Withdrawal Update Form 3File: Beam FORM 3 Q2_compressed.pdf29 Nov 2025
Form 1File: Form 1-ARCHITECT CERTIFCATE.pdf22 Aug 2025
Form 2File: Form 2- ENGINEER CERTIFICATE.pdf22 Aug 2025
Form 3File: Form 3 Beams Q1.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec The Crown.pdf22 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Beam Shine Q4 FORM 3_compressed.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: The Crown - 31-03-2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: The Crown - dec 24.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Beam Q3 FORM 3_compressed.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: The Crown.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FORM 3.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Beam and Shine Q2.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 Beams and Shine Realties PVT LTD.pdf17 Dec 2024
Details of encumbrances concerned to FinanceFile: Encum Legal New.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: Encum Legal New.pdf10 Jan 2024
Other - TechnicalFile: 01.pdf10 Jan 2024
Other - TechnicalFile: Declaration Layout.pdf27 Dec 2023
Other - TechnicalFile: LAYOUT-01_compressed.pdf27 Dec 2023
Layout approvalFile: Sheet 01.pdf23 Dec 2023
Building plan approvalFile: Sheet 02.pdf23 Dec 2023
Building plan approvalFile: Sheet 03.pdf23 Dec 2023
Building plan approvalFile: Sheet 04.pdf23 Dec 2023
Building plan approvalFile: Sheet 05.pdf23 Dec 2023

How this compares with Pune

53%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE CROWN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gultekadi13,700+ in Pune

2 kmTHE CROWNCompleted 38Lapsed / revoked 40Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 152 registered projects within 2 km.

Builder: BEAMS AND SHINE REALTIES PRIVATE LIMITED

BEAMS AND SHINE REALTIES PRIVATE LIMITED has 1 registration on MahaRERA, including THE CROWN. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE CROWN is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE CROWN?

The registered promoter entity is BEAMS AND SHINE REALTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE CROWN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE CROWN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE CROWN?

The professionals named in the filing: Architect: Mr Jay Aeram; Engineer: Mr Nand Kumar Patil; Engineer: ARUN SUTAR; Chartered Accountant: Sunanda Zore; Chartered Accountant: SANKET BHANDARI; Chartered Accountant: Vinod Kumar Jindal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE CROWN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE CROWN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE CROWN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.